Loading...
HomeMy WebLinkAbout22-A4.10 OVERALL EXTERIOR ELEVATIONSLEVEL TWO 13' -2" LEVEL TWO 13' -2" LEVEL ONE 0' -0" LEVEL ONE 0' -0" LEVEL THREE 24' -8" LEVEL THREE 24' -8" 1 A4.50 000302070405 LEVEL FOUR 35' -3" LEVEL FOUR 35' -3" BOT OF JOISTS 44' -4 1/2" BOT OF JOISTS 44' -4 1/2" 06090810111213141516 2 A4.50 2 A4.50 18 3 A4.50 MID PARAPET 48' -7" MID PARAPET 48' -7" HIGH PARAPET 50' -11" HIGH PARAPET 50' -11" PAINT DOOR & FRAME TO MATCH ADJACENT 46' - 1 1/2"121' - 11"122' - 4 1/2"12' - 0 1/2"36' - 6 1/2"47' - 7"8' - 0"FCP-3 FCP-2 FCP-1 FCP-3 16.81716.9 LOW PARAPET 47' -7" LOW PARAPET 47' -7"12' - 4"CANOPY FCP-3 FCP-2 CANOPY OVER DOOR, RE: /4 A8.00 01 LIGHT FIXTURE TYPE BD4 LIGHT FIXTURE TYPE BD5 LIGHT FIXTURE TYPE BD5 OUTDOOR GARDEN PATIO DS FDC 12' - 2" LEVEL TWO 13' -2" LEVEL TWO 13' -2" LEVEL ONE 0' -0" LEVEL ONE 0' -0" LEVEL THREE 24' -8" LEVEL THREE 24' -8" 1 A4.50 1 A4.50 00 0302 070405 LEVEL FOUR 35' -3" LEVEL FOUR 35' -3" BOT OF JOISTS 44' -4 1/2" BOT OF JOISTS 44' -4 1/2" 06 0908 10 11 12 13 14 15 16 2 A4.50 2 A4.50 18 3 A4.50 ELEVATOR HOISTWAY 50' -7" ELEVATOR HOISTWAY 50' -7" HIGH PARAPET 50' -11" HIGH PARAPET 50' -11"DASHED LINE OF CMU ELEVATOR HOISTWAY BEYOND 63' - 2"138' - 11 5/8"87' - 10 7/8"6' - 8"19' - 7"3' - 10"18' - 10"2' - 0"PAINT DOOR & FRAME TO MATCH ADJACENT FCP FCP-1 FCP-2 (1) FCP-2 16.8 1716.9 9' - 1 1/2"10' - 7"11' - 6"13' - 2"LOW PARAPET 47' -7" LOW PARAPET 47' -7" CANOPY OVER DOOR, RE: SIGNAGE OF INTERNALLY LIT ALUMINUM CHANNEL LETTERS, PROVIDE BLOCKING IN WALL. LOUVERS, PAINT TO MATCH WALL 6 A5.00 FCP-3 (3) 5 A5.00 FCP-2 (1) FCP-2 FCP-3 FCP-2 BUILDING SIGN LOCATION EM-4/4 A8.00 CANOPY OVER DOOR, RE: /4 A8.00 CANOPY OVER DOOR, RE: /3 A8.00 01 4"3' - 0"3' - 2 1/2"9' - 1 1/2"10' - 7"6' - 1"17' - 5" LIGHT FIXTURE TYPE BD5 LIGHT FIXTURE TYPE BD4 LIGHT FIXTURE TYPE BD4 LIGHT FIXTURE TYPE BD5 LIGHT FIXTURE TYPE BD5 EQ EQ EQEQ LEVEL TWO 13' -2" LEVEL ONE 0' -0" LEVEL THREE 24' -8" FEDABC LEVEL FOUR 35' -3" BOT OF JOISTS 44' -4 1/2" 4 A4.50 4 A4.50 MID PARAPET 48' -7" HIGH PARAPET 50' -11"44' - 3"6' - 8"50' - 11"FCP-3 FCP-2 ROYAL BLUE LED STRIP LIGHT ON FCP 40' - 11 1/8" 4 A5.00 2 A5.00 58' - 4" LOW PARAPET 47' -7" EM-4 BIKE RACK WITH BLACK FINISH 3 A8.00 INTERNALLY LIT ALUMINUM LETTERS MOUNTED AT EDGE OF CANOPY BUILDING SIGN LOCATION FCP-2 FCP-2 BREAKMETAL BETWEEN SIDING AND FCP BEHIND ROOF DRAIN LEADER AND COLLECTOR HEAD FCP-2 1' - 0"16' - 0"1' - 0"LIGHT FIXTURE TYPE BD6 13' - 4" OUTDOOR GARDEN PATIOLEVEL TWO 13' -2" LEVEL ONE 0' -0" LEVEL THREE 24' -8" LEVEL FOUR 35' -3" BOT OF JOISTS 44' -4 1/2" 4 A4.50 HIGH PARAPET 50' -11"8' - 0"FCP-3 ELEVATOR HOISTWAYLOW PARAPET 47' -7" BUILDING SIGN LOCATION FCP-2 2' - 3"9' - 0"19' - 4"3' - 7 1/2"3' - 7 1/2"19' - 4" CANOPY BEYOND, RE: CANOPY OVER DOOR /4 A8.00 EQ EQLIGHT FIXTURE TYPE BD6 OUTDOOR GARDEN PATIO EXTERIOR FINISH LEGEND TAG #CONT. INSUL FCP-1 FCP-2 R-5 R-5 FCP-3 R-5 THICKNESS 5/8" 5/8" 5/8" * -BASE LAYER IS MINIMUM R-VALUE THICKNESS REQUIRED BY ENERGY CODE FOR PROJECT LOCATION. FCP-1 TAG # HATCH EM-4 1/2" COLOR INFORMATION Nichiha Illumination 1818 Warm White Nichiha Illumination 1818 Graphite CMC Motivate -Walnut Matte (finish) Nichiha Illumination 1818 Custom Color (clay) Tyson C. Kraft O D a C E ESNLI e GrSATETOFM a Et F THCRA I ll Cs TN NAT A15974 00 0000000000 Project Date Drawn by Checked byarchitectsNelson DreamDesignBuild621 2nd Avenue North Great Falls, MT 59401406.727.3286 NelsonArchitects.comISSUED FORNOT FOR CONST. CONSTRUCTION 10'-8"21' -4"32' 3/32" = 1' -0" 8"1' -4"2' 1 1/2" = 1' -0" 1'2'3' 1" = 1' -0" 1' -4"2' -8"4' 3/4" = 1' -0" 2'4'6' 1/2" = 1' -0" 10' -8"21' -4"32' 3/32" = 1' -0" 8'16'24' 1/8" = 1' -0" 4'8'12' 1/4" = 1' -0" 2' -8"5' -4"8' 3/8" = 1' -0" 10' -8"21' -4"32' 3/32" = 1' -0" 4"8"1' -0" 3" = 1' -0" 5' -4"10' -8"16' 3/16" = 1' -0"A4.10 23-012 6/21/24 DL DNOVERALL EXTERIORELEVATIONS1851 BAXTER LANE, BOZEMAN MONTANA59715BOZEMAN ATWELL HOTEL3/32" = 1'-0"A4.10 4 EAST ELEVATION 3/32" = 1'-0"A4.10 1 WEST ELEVATION 3/32" = 1'-0"A4.10 2 SOUTH ELEVATION 3/32" = 1'-0"A4.10 3 NORTH ELEVATION REVISION SCHEDULE # DESCRIPTION DATE 2 CITY COMMENTS 2/21/25 2 22 2 2