Loading...
HomeMy WebLinkAbout04-C1 COVERBAXTER LNN 1 9 T H AV E FOEEECOCOWS 8" PVC 12"W2" WS1" RV4" FL8" DIP W 8" DIP8" DIP6" PVCSSWWSDSDSDSDSDSDSDSDSDSDSSD 8" DIPEXISTINGRETENTIONPONDSD SD SD SD SD SDSDGSDSD SDSDSDSDSDSD 8" PVCGW4" PVCS D EXIST.C-STOREEXIST.CARWASHNEWHOTELIN T E R S T A T E 9 0 BAXTER LNN 19TH AVECOVERC9C1SITE DEMOLITION PLANC3COVERC1C2WSWATER SERVICEAGGREGATE BASE GRAVELABWATERWCLEANOUTCOI.E.INVERT ELEVATIONMHSHT.RCPPVCS.Y.TYP.TBMXINGW/TEMPORARY BENCH MARKSQUARE YARDSREINFORCED CONCRETE PIPEPOLYVINYL CHLORIDE (PIPE)CROSSINGTYPICALWITHMANHOLESHEETACDIPC.P.CEA.EX./EXIST.EL./ELEV.ASPHALTIC CONCRETE (PAVEMENT)DUCTILE IRON PIPECONTROL POINTEXISTINGELEVATIONEACHCENTERLINEG OR GASGAS (NATURAL)CYCUBIC YARDSSTORM DRAINSDL.F.LINEAL FEETF.F.TOP OF FINISH FLOOR ELEVATIONN.I.C.NOT IN CONTRACTLF/L OR FL.FLOW LINESSSEWER SERVICEB.C. BACK OF CURBSWSIDEWALKSANITARY SEWERSAN.TP TOP OF PAVEMENTWATERFIRE HYDRANTVALVECURB STOPSANITARY SEWERSEWER SERVICEMANHOLESTORM DRAINOVERHEAD ELECTRICALUNDERGROUND ELECTRICALTELEPHONETELEPHONE PEDESTALPOWER POLEASPHALTIC CONCRETE SURFACINGCONCRETE SURFACINGCURB AND GUTTERGRAVEL SURFACINGFLOWLINECONTOURSPROPERTY LINEWSSSSDOHPETNEWEXISTINGWSSS3822STORM INLETBOZEMAN, MT2024GRADING & DRAINAGE PLAN (BUILDING)C5C4SHEET:BY:DATE:OWNER FILE NUMBER:DRAWING INFORMATION:BSCE PROJECT NUMBER:ASSOCIATED PROJECTS:CADD FILE NAME:PROJECT NAME:SHEET TITLE:LAND SURVEYORS - ENVIRONMENTAL SPECIALISTS1324 13th Ave. SWP.O. BOX 3625GREAT FALLS, MT 59403(406)727-2185 OFFICE(406)727-3656 FAXwww.bigskyce.comENGINEERS - PLANNERS - DESIGNERS -PROFESSIONAL SEALOWNER:OFTHE ENGINEER HAS ATTEMPTED TO SHOW ON THE PLANS ALL KNOWN UNDERGROUND UTILITIES AND SERVICE LINES FOR THE PURPOSE OF IDENTIFYING POTENTIAL CONFLICTS. THE PRESENTATION OF EXISTING UTILITIES IS NOT WARRANTED TO BE EITHER COMPLETE OR EXACT IN HORIZONTAL POSITION OR ELEVATION. THE CONTRACTOR SHALL DETERMINE OR VERIFY VERTICAL AND HORIZONTAL UTILITY LOCATIONS PRIOR TO BEGINNING ANY WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL DATA WITH EACH RESPECTIVE UTILITY OWNER PRIOR TO BIDDING AND/OR INITIATING CONSTRUCTION. THE ENGINEER ACCEPTS NO RESPONSIBILITY FOR THE ACCURACY OF UTILITY LOCATION DATA PRESENTED ON THE DRAWINGS. VARIANCES FROM LOCATION SHOWN ON ANY UTILITY CROSSED SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ENGINEER IN WRITING.ALL WORK IN CITY OF BOZEMAN RIGHT-OF-WAY SHALL BE COMPLETED IN ACCORDANCE WITH CITY OF BOZEMAN REQUIREMENTS.REFER TO MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS AND CITY OF BOZEMAN ENGINEERING STANDARDS FOR ADDITIONAL UTILITY DETAILS.CONTRACTOR SHALL REVIEW TO THE GEOTECHNICAL REPORT FOR EXISTING SOIL TYPES AND SUBSURFACE CONDITIONS.STORM SEWER PLAN & PROFILE23OXXXX23O-C1XXXXCJM6/21/24C6SEWER SERVICE AND WATER PLAN & PROFILESC7SITE IMPROVEMENTS PLANC8CITY COMMENTS (NOV. '24)1TRE LLCBOZEMAN 7C9ATWELL SUITESBOZEMAN, MTCITY OF BOZEMAN DETAILSDETAILSAREAPROJECTGRADING & DRAINAGE PLAN (NORTHWEST)FIRE LINEFLGREASE WASTEGWUNDERGROUND NATURAL GASG3822EASEMENTFIBER OPTICFOBEARING SOURCE = NAD 83VERTICAL DATUM = NAVD 88EGCITY OF BOZEMANCOBTHE SUBJECT PROPERTY IS WITHIN THE BOZEMAN SOLVENT SITE. IN AUGUST 2011, THE MONTANA DEPARTMENT OF ENVIRONMENTAL QUALITY ISSUED THE RECORD OF DECISION (ROD) FOR THE BOZEMAN SOLVENT SITE. TETRACHLOROETHENE (PCE) IS THE MAIN CONTAMINANT OF CONCERN FOR THE BOZEMAN SOLVENT SITE. THE ROD IDENTIFIED THAT THE BOZEMAN SOLVENT SITE SITE-SPECIFIC CLEAN UP LEVEL (SSCL) FOR PCE IN GROUNDWATER IS 5 µg/L.THERE ARE NO BOZEMAN SOLVENT SITE GROUNDWATER MONITORING WELLS AT THE PROJECT LOCATION OR WITHIN 1000 FT. BASED ON HISTORICAL GROUNDWATER DATA, GROUNDWATER FLOW ACROSS THE BOZEMAN SOLVENT SITE IS FROM THE SOUTH TO THE NORTH AND THE DEPTH TO GROUNDWATER AT THE PROJECT LOCATION IS LIKELY AROUND 10 FEET BELOW GROUND SURFACE DEPENDING UPON TIME OF YEAR. BASED ON HISTORICAL GROUNDWATER DATA, PCE CONCENTRATIONS MAY BE PRESENT IN THE GROUNDWATER, BUT CONCENTRATIONS ARE EXPECTED TO BE LESS THAN THE SSCL OF 5 µg/L.THE ROD DOES NOT IDENTIFY CONSTRUCTION REQUIREMENTS RELATED TO THE BOZEMAN SOLVENT SITE IN THE AREA OF YOUR PROJECT. HOWEVER, IF CONSTRUCTION ACTIVITIES REQUIRE A DEWATERING PERMIT, THE CONSTRUCTION DEWATERING GENERAL PERMIT (CDGP) APPLICATION REQUIRES THE APPLICANT TO CONTACT ME (KATE FRY, MDEQ - (406) 444-6426) REGARDING CURRENT GROUNDWATER PLUME CONDITIONS. THIS EMAIL MAY SATISFY THAT REQUIREMENT. PLEASE NOTE, THE CDGP MAY HAVE DIFFERENT REQUIREMENTS FOR PCE CONCENTRATIONS THAN THE BOZEMAN SOLVENT SITE SSCL PRIOR TO DISCHARGE UNDER A CDGP. FOR ADDITIONAL INFORMATION ON THE CDGP APPLICATION PROCESS PLEASE CONTACT CHRISTINE WEAVER IN DEQ WATER QUALITY (406-444-3927 OR CWeaver@mt.gov).IN ADDITION, YOUR PROJECT IS WITHIN THE BOZEMAN SOLVENT SITE CONTROLLED GROUNDWATER AREA (CGWA). THE CGWA IS ADMINISTERED BY THE MONTANA DEPARTMENT OF NATURAL RESOURCES AND CONSERVATION (DNRC). THE CGWA LIMITS THE TYPE OF GROUNDWATER WELLS THAT CAN BE INSTALLED. PLEASE CONTACT DNRC FOR MORE INFORMATION.REV. 2/21/25