Loading...
HomeMy WebLinkAbout23O - Atwell Suites DEQ Storm Permit AppAGENCY USE ONLY PERMIT NO.:Date Rec’d.:Amount Rec’d.:Check No.:Rec’d By: WATER PROTECTION BUREAU FORM NOI Notice of Intent (NOI) Storm Water Discharge Associated With Construction Activity MTR100000 The NOI form is to be completed by the owner or operator of construction activity eligible for coverage under the Department’s General Permit for Storm Water Discharges Associated with Construction Activities. Please read the attached instructions before completing this form. You must print or type legibly; forms that are not legible or are not complete or are unsigned will be returned. You must maintain a copy of the completed NOI form for your records. Section A - NOI Status (Check one): No prior NOI submitted for this site. New Resubmitt Permit Number: MTR10 __ __ __ __ Permit Number: MTR10 __ __ __ __ Permit Number: MTR10 __ __ __ __ (Discuss Modification in Section I) Section B – Facility or Site Information Site Name Site physical address, mailing address at location, or directions to the site Township/Range/Section (optional): Nearest City or Town Zip Code County Latitude Longitude Is this facility or site located ? Yes No Section C – Applicant (Owner/Operator) Information: Owner or Operator Name (Organization Formal Name) Mailing Address City, State, and Zip Code: Phone Number Email Status of Applicant (Check one) Federal State Private Public Other (specify) Atwell Suites - Bozeman, MT Directly east of 1851 Baxter Lane, Bozeman, MT 59715 SE 1/4 Section 35 - T01S, R05E Bozeman 59715 Gallatin 45.701075 -111.063139 Bozeman 7 RE LLC PO Box 6000 Butte, MT 59701 (406) 497-6700 dans@townpump.com Section F – SWPPP Administrator : Name Mailing Address City, State, and Zip Code Phone : Mailing Address City, State, and Zip Code Phone 404 Permit (dredge & fill) Section D – Existing or Pending Permits, Certifications, or Approvals: MPDES A. Primary B. Second C. Third D. Fourth Alternate Phone Alternate Phone : Mailing Address City, State, and Zip Code Phone Alternate Phone City of Bozeman Plan Submittal 1542 - General Contractors - Nonresidential Buildings, Other than Industrial Buildings and Warehouses1623-Water,Sewer,Pipeline,Communications &Power 1794 -Excavation Work 1611 -Highway and Street Construction,Except Elevated Kevin May, P.E.Project Manager PO Box 3625 Great Falls, MT 59403 (406) 727-2185 (406) 390-4514 Big Sky Civil & Environmental, Inc.kmay@bigskyce.com MCA SWPPP Admin Recertification 01/11/2023 Kevin May, P.E.Project Manager PO Box 3625 Great Falls, MT 59403 (406) 727-2185 (406) 390-4514 Big Sky Civil & Environmental, Inc.kmay@bigskyce.com MCA SWPPP Admin Recertification 01/11/2023 Paxton Ellis, P.E.Project Engineer PO Box 3625 Great Falls, MT 59403 (406) 727-2185 (406) 438-1136 BSCE pellis@bigskyce.com MCA SWPPP Admin Recertification 01/11/2023 Section H –Describe the Construction Activity or Project Please provide a summary of Best Management Practices (BMPs) in the SWPPP Section G – Receiving Surface Water(s): Storm Water Outfall/Discharge Locations: For each outfall, list latitude and longitude in the decimal degrees format (00.0000; -000.0000) and the name of the receiving waters.This section must not be left blank and 45.70142800 -111.06500000 Ex. Wetlands Clearing, grubbing, and removal of existing vegetation and minimal demolition of existing curb & gutter, asphalt, and existing gravel surfacing. Excavation and dirtwork required to bring site to grade for new building and site construction. Building construction and utility installation. Asphalt and concrete surfacing and landscaping installation. Straw Wattles Silt Fence Inlet Protection Vehicle Track Pad Seeding/Landscaping for final stabilization Equipment ManagementRoadway Management Water Trucks for Dust Control Good Housekeeping Portable Toilets Spill Prevention & Response Refuse & Trash Concrete/Grout Washout AreasPermanent retention treatment areas Section J – Fee: NEW PROJECTS: Indicate the acreage of construction related disturbance indicated in Section H of this NOI form. The fee for new projects includes the application and the annual fee for the calendar year in which the permit authorization is effective. 1-5 acres $ 900.00 >5-10 acres $1,000.00 >10-25 acres $1,200.00 >25-100 acres $2,000.00 >100 acres $3,500.00 $ 500.00 (minor modification, only if six months from date the permit authorization is effective) RESUBMITTAL RENEWAL $ Amount specified in Rule () MODIFICATION Map: Attach a USGS topographic quadrangle map extending one mile beyond the property boundaries of the site or activity identified in Section B depicting the facility or activity boundaries, major drainage patterns, and the receiving surface waters stated above. Section I – Supplemental Information (For Permit Modification Only – leave blank except for modification) Total site area (acres) Area of Construction Related Disturbance (acres) Estimated Project Start Date Estimated Project Final Stabilization Date Estimated Project Completion Date 8.436 3.5 10/01/2024 12/31/2026 10/30/2026 Section - C Authorized Signatories:This form must be completed, signed, and certified as follows: For a corporation, by a principal officer of at least the level of vice president; For a partnership or sole proprietorship, by a general partner or the proprietor, respectively; or For a municipality, state, federal, or other public facility, by either a principal executive officer or ranking elected official. All Applicants Must Complete the Following Certification: I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information; including the possibility of fine and imprisonment for knowing violations. A. Name (Type or Print) B. Title (Type or Print)C. Phone No. D. Signature E. Date Signed The Department will not process this form until all of the requested information is supplied, and the appropriate fees are paid. Return this form and the applicable fee to: Department of Environmental Quality Water Protection Bureau PO Box 200901 Helena, MT 59620-0901 (406) 444-3080 Dan Sampson Town Pump Construction Manager (406) 497-6700 BAXTER LANEN. 19TH AVEEXISTING WETLANDS (RECEIVING WATER) SUBJECT PROPERTY: ATWELL SUITES POST-CONSTRUCTION DISCHARGE LOCATION SIMMENTAL WAYI-9 0 LAND SURVEYORS - ENVIRONMENTAL SPECIALISTS 1324 13th Ave. SWP.O. BOX 3625GREAT FALLS, MT 59403 (406)727-2185 OFFICE (406)727-3656 FAX www.bigskyce.com ENGINEERS - PLANNERS - DESIGNERS - VICINITY MAP ATWELL SUITES - BOZEMAN, MT 1 ADDRESS: EAST OF 1851 BAXTER LANE SE 1/4 SEC. 35, T01S, R05E AGENCY USE ONLY PERMIT NO.:Date Rec’d.:Amount Rec’d.:Check No.:Rec’d By: WATER PROTECTION BUREAU FORM SWPPP 2018 Storm Water Pollution Prevention Plan (SWPPP) Form Storm Water Discharge Associated With Construction Activity MTR100000 READ THIS BEFORE COMPLETING FORM: The Form SWPPP is intended to assist operators in developing a SWPPP which complies with Part 3 of the General Permit for Storm Water Discharges Associated with Construction Activity (General Permit). It is the permittee’s responsibility to ensure all required items in the General Permit are adequately addressed and that the SWPPP is developed, implemented, and maintained. Additional information may be needed to supplement the Form SWPPP. For additional information, please call: (406) 444-3080 or visit:http://deq.mt.gov/wqinfo/mpdes/stormwaterconstruction.mcpx Section A -SWPPP Status:(Check one) New No prior SWPPP submitted for this site. Modificatio Permit Number: MTR10 __ __ __ __ (Please specify these four numbers) Section B - Facility or Site Information: Site Name ________________________________________________________________________________ Site Location Nearest City or Town County Section C - Applicant (Owner/Operator) Information: Owner or Operator Name Mailing Address City, State, and Zip Code Phone Number Section D SWPPP Preparer and SWPPP Administrator SWPPP Preparer: Name or Position Title Mailing Address City, State, and Zip Code Phone Number _____________________ Email Training Course _________________________________ Date Completed____________________________ Atwell Suites - Bozeman, MT Directly East of 1851 Baxter Lane, Bozeman, MT 59715 Bozeman Gallatin Bozeman 7 RE LLC PO Box 6000 Butte, MT 59701 406-497-6700 Kevin May, P.E. - Project Manager PO Box 3625 406-727-2185 Great Falls, MT 59403 MCA SWPPP Admin Recert kmay@bigskyce.com 01/11/2023 SWPPP Administrator:Same as above Name or Position Title Mailing Address City, State, and Zip Code Phone Number _____________________ Email Training Course _________________________________ Date Completed____________________________ Section E – Site Description ( 1. Describe the nature of the construction activity and what is being constructed. 2. Describe all support activities and associated storm water discharges dedicated to the construction activity including but not limited to: material borrow areas, material fill areas, concrete or asphalt batch plants, equipment staging areas, access roads/corridors, material storage areas, and material crushing/recycling /processing areas. 3. Provide an estimate of the total area of the site, and an estimate of the area of the site expected to undergo construction-related disturbance (including all construction-related support activities). Total Site Area (acres): ____________ Area of Construction-Related Disturbance (acres): ____________ 4. Describe the character and erodibility of soil(s) and other earth material to be disturbed at the site, including cut/fill material to be used. SWPPP Administrator: Name or Position Title Mailing Address City, State, and Zip Code Phone Number _____________________ Email Training Course _________________________________ Date Completed____________________________ Kevin May, P.E. - Project Manager PO Box 3625 406-727-2185 Great Falls, MT 59403 kmay@bigskyce.com MCA SWPPP Admin Recert 01/11/2023 Paxton Ellis, P.E. - Project Engineer PO Box 3625 Great Falls,MT 59403 406-727-2185 pellis@bigskyce.com MCA SWPPP Admin Recert 01/11/2023 Clearing, grubbing, and removal of existing vegetation and minimal demolition of existing curb & gutter, asphalt and gravel surfacing. General fill and dirtwork required to bring site to grade for proposed building and site construction. Building construction and utility installation. Asphalt and concrete surfacing and landscaping installation. The project is being completed to construct a new hotel building with concrete retaining wall, asphalt parking lot, retention storage/treatment pond, and required landscaping. Water main installation, sewer service piping and grease interceptor, storm drainage piping and structures. Support activities will include excavation and hauling of debris and spoils offsite and importing of materials as needed. Equipment staging will be on the project site identified on the project site map. No borrow, concrete and asphalt batch plants will be onsite. Construction traffic will be limited as depicted on the site map. The site's existing vegetation will be maintained as long as practical to limit construction traffic's access to active earthwork activities. Material storage will take place onsite as needed and will be properly protected. No material crushing and processing will take place onsite. 8.436 3.5 Per the geotechnical analysis completed onsite, native materials to be encountered onsite generally consist of lean clays overlaying sands and gravels. Onsite clay is considered erodible and BMPs shall be utilized to limit the erosion potential. Import materials proposed for use onsite also generally consist of structural fill materials, gravel base course materials, concrete materials for surfacing and foundations, and asphaltic pavement. 6. For a storm water discharge associated with construction activity with construction-related disturbance of five acres or more of total land area (based on the acreage provided in item E.3 above): a. Provide an estimate of the runoff coefficient of the site, both before and after construction, and describe what supporting information this determination is based upon: Runoff coefficient before construction: ____________ Runoff coefficient after construction: ____________ Supporting Information Source: b.Provide an estimate of the increase in impervious area after the construction activity is completed: ________ Percent. Outfall Number Receiving Surface Water Drainage Area Associated with Type of Discharge Latitude and Longitude of Outfall Discharge to Municipal Storm 005 006 007 008 009 010 5. Provide a brief description of the existing vegetation at the site and an estimate of the percent density of vegetative ground cover. Specify Percent Density of Existing Vegetation: _________________ 00 00 00 00 Existing vegetation at the site consists of native grasses over the majority of the site (outside of the existing gravel surfacing). 85% .29 .8 Rational Method Calculations 75 Ex. Wetlands Entire Site 45.70142, -111.06500 Section – Identification and Summary of Potential Pollutant Sources (Part 3.4) Select the pollutants expected to be present on the construction project: Additional Pollutants List any additional pollutants likely to be present at the construction project. Non-Storm Water Discharges Select the types of allowable non-storm water discharges likely to be present at the construction project. Type of Allowable Non-Storm Water Discharge Present at Construction Project Irrigation Drainage Landscape Watering Pavement Wash Waters Routine Building Wash Down Uncontaminated spring or ground water Water used for dust control Emergency fire-fighting activities Foundation or footing drains Incidental windblown mist from cooling towers Uncontaminated condensate from air conditioners, coolers, or other compressors Other Explain ___________________________ Soils Areas of Shallow Grade Areas of Steep Grade Slopes Ditch Stockpiles Contaminated Soils Import and Export Operations Entrance / Exit Locations Other Explain_______________________ Materials Loading and Unloading Operations Storage of building materials Storage of chemicals Portable Toilets Concrete Batch Plant Asphalt Batch Plant Worker Trash Demolition Materials / Debris Other Explain ____________________ Activities Concrete Truck Washout Masonry - Stone / Brick / Concrete Spray / Wand Applications Finish Work – Dry wall / Painting Equipment Washing Washing of Buildings Maintenance of Equipment Refueling Operations Application of herbicides, pesticides, fertilizers Application of solvents or detergents Construction Dewatering Other Explain_____________________ Section – Selection of Best Management Practices (BMPs) (Part 3.5) Select the BMPs to be used during the construction project. All selected BMPs are required to have a specification provided in the SWPPP. The specifications do not have to be submitted to DEQ. The specifications are required to be maintained by the SWPPP Administrator(s) and provided to DEQ, EPA, or other local permitting authority upon request. Additional BMPs List any additional BMPs likely to be used at the construction project. Erosion Control BMPs Surface Roughening Diversion Ditches Velocity Checks / Check Dams Preservation of Existing Vegetation Minimizing Ground Disturbance Mulch – Straw / Compost Tackifiers / Soil Binders Temporary Seeding Erosion Control Blankets Rough Cut Street Controls / Water Bars Channel Liner Stream Crossing Terracing Culvert Outfall / Outlet Protection (Rip Rap) Other ______________________ Run On / Runoff Control BMPs Temporary Slope Drain Rock Run Down Clean Water Diversion Drainage Swales Other ______________________ Sediment Control BMPs Silt Fence Straw Wattles Rock Wattles / Rock Socks Curb Socks Straw Bales Earthen Berms Vegetative Buffers Drainage Ditch / Ditch Berm Gravel Pack Tarps, Plastic, Visqueen Compost Socks Brush Barrier Sandbag Barrier Inlet Protection Vehicle Tracking Control Pad Stabilized Vehicle Entrance Stabilized Parking Area Stabilized Construction Roadway Street Sweeping Sediment Trap Sediment Basin Other ________________________ Administrative Controls Concrete and Liquid Waste Washouts Worker Toilets Construction Fencing Dust Control Secondary Containment Dumpsters / Waste Receptacles Stabilized Staging Area Material Storage and Stockpile Area Paving and Painting Controls Saw Cutting and Grinding Controls Spill Prevention and Response Procedures Traffic Control Back Charging / Penalties Other __________________________ Post Construction BMPs Detention Pond(s) Retention Pond(s) Drainage Swales Infiltration System(s) Dry Well(s) Other __________________________ A new retention pond shall be utilized for stormwater treatment immediately following installation. Contractor shall be responsible for maintenance of pond during construction to minimize erosion potential including monthly documentation of sediment depths and cleaning as necessary. Care shall be taken during herbicide, pesticide, and fertilizer placement to ensure over-spreading and waterway contamination potential are minimized. Local Erosion and Sediment Controls Describe applicable local erosion and sediment control requirements. Dewatering Activities (Part 3.6) Describe dewatering activities associated with the construction project. Identify the BMPs to be used to control dewatering activities and prevent discharges to state waters. If a separate authorization is obtained under the Construction Dewatering General Permit, include the dewatering plan with the SWPPP. Local erosion and sediment controls currently dictated by City's MS4 Permit, building permit, and erosion control permit. COGF Erosion Control Requirements during Active Construction can be found in the Official Code of the City of Bozeman Dewatering activities may be necessary for the site based on potential groundwater elevations. Contractor shall be responsible for obtaining necessary permitting and submitting additional BMP information. It is anticipated that the proposed onsite retention pond may be construction prior to initiating dewatering activities, at which point the BMP could be utilized for infiltration and treatment of dewatering discharges where no discharge from the site would be necessary. Major Construction Activity BMPs Seven Earthwork Concrete Foundation & Slab Building Framing Painting/Finish Work Sitework/Utilities Landscaping - Final Stabilization Final BMP Removal/Post Construction Straw Waddles/Silt Fence Inlet Protection Vehicle Track Pad Seeding/Sod Materials Handling & Equipment Storage Refuse & Trash Portable Toilets Spill Response Preserve Ex. Veg Concrete Washout Major Construction Activity Schedule List the major construction activities identified in the table above and provide an estimated timeframe for each major construction activity. For each major construction activity, identify all construction activities that will occur during the proposed major construction activity. Section – Final Stabilization (Part 3.8) Identify the BMPs that will be used to achieve final stabilization. Information to be included is seed mix selection and application methods, soil preparation and amendments, soil stabilization practices, and any temporary BMPs. Section – Post-Construction Storm Water Management (Part 3.9) Identify BMPs that will be used to control storm water discharges that will occur after the major construction activities are complete. Include a description of applicable local requirements. Earthwork - Will commence immediately following construction startup and last multiple months. Concrete Foundation & Slab - Likely start 4 weeks after construction startup and last 2 months. Building Framing - Directly following concrete foundation & slab work, likely lasting 6-8 months. Work includes rough framing, electrical, HVAC, plumbing, sheet rock, and other typical building construction activities. Painting - Painting and finish work follows the completion of building framing. Work will likely take 1 month. Includes painting, furnishing rooms as necessary, final inspections, and other associated finish work. Sitework - Sitework will begin following NTP and will likely take place throughout construction of the buildings. Includes utility installation (Water, WW, Storm), concrete sidewalks, drainage features, AC parking lot, landscaping & irrigation system. Project will include full landscaping and seeding of disturbed areas within the project area including mulch, sod, and other landscaping features as detailed within the landscaping plan. Dry-land seeding will be utilized for disturbed areas not included within landscaping plan. A new retention pond is planned to capture and infiltrate collected stormwater following construction. All proposed post-construction management activities were/will be reviewed and approved by the City of Bozeman Engineering and Environmental Departments. Section – Site Map (Part 3.10) Develop and attach the required SWPPP site maps and plans with the SWPPP. The site maps or plans must clearly indicate all the required information in Part 3. of the General Permit. This means SWPPP site maps must be of sufficient size, scale, and legibility. Section – Inspection and BMP Maintenance Procedures (Part 3.11) Select the inspection schedule for the construction project: Once every 7 calendar days Once every 14 calendar days, and a post-storm event inspection within 24 hours of the end of a rainfall event of 0.25 inches or greater, and/or within 24 hours of runoff from snowmelt Describe the inspection and maintenance procedures that will be used to maintain all erosion, sediment control, and other BMPs in good and effective operating condition. Identify how changes to the SWPPP will occur per Part 3.12 of the General Permit. If post construction BMPs will be used during major construction activities, include a maintenance plan that will transition the BMP from active construction to post construction. Section – Water Quality Controls for Discharges to Impaired Water bodies (Part ) National Weather Service All BMPs are to be continuously monitored by site personnel to ensure they are effective. Inspections will be completed bi-weekly (every 14 calendar days) or after a rainfall event exceeding 0.25". If additional BMPs are required we will make the necessary updates and adjustments to the SWPPP and site plan. The self inspection form (Attachment B) will beutilized during the inspections. All site BMPs will be inspected to ensure they are installed and functioning correctly. Any necessary repairs or replacement will be made within 3 working days following noteddeficiency. The site will be walked to determine if other areas of contamination may be present and to determine if any construction runoff has occurred. The following will be inspected: - site perimeter - areas disturbed or impacted by construction - structural BMPs - make sure BMPs planned and installed are adequate. Make changes to SWPPP, site plan, and BMPs as necessary. - document any changes to BMPs - to include repairs, replacements, or additions - document any changes to the SWPPP - Material and/or storage areas exposed to rainfall - discharge locations - vehicle/equipment areas - entrance/exit locations - access/haul roads - other areas where potential pollutants may be generated In the event the post-construction controls are installed and utilized for treatment during construction, they will be cleaned prior to final completion of the project to ensure the finalproduct operates efficiently. O&M information was submitted to the City of GF and is available on file. The pollutants listed above have the potential to enter into the existing storm drainage system and ultimately into the existing wetlands. The following list of BMPs will be used to address any concerns about discharges from the site: Straw Wattles Silt Fence Inlet Protection Vehicle Track Pad Seeding Equipment Management & Materials Handling Dust Control Good Housekeeping Portable Toilets Spill Prevention & Response Refuse and Trash Preserving Natural Vegetation Concrete Washout Areas Onsite retention treatment pond Section O - CERTIFICATION Permittee Information:This SWPPP must be completed, signed, and certified as follows: For a corporation, by a principal officer of at least the level of vice president; For a partnership or sole proprietorship, by a general partner or the proprietor, respectively; or For a municipality, state, federal, or other public facility, by either a principal executive officer or ranking elected official. Alternatively, this SWPPP may be signed by a duly authorized representative of the person above. A person is a duly authorized representative only if: The authorization is made in writing by a person described above; The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company (a duly authorized representative may thus be either a named individual or any individual occupying a named position); The written authorization is submitted to the department. All Permittees Must Complete the Following Certification: I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information; including the possibility of fine and imprisonment for knowing violations. [75-5- 633, MCA] A. Name (Type or Print) B. Title (Type or Print)C. Phone No. D. Signature E. Date Signed The Department will not process this form until all of the requested information is supplied, and the appropriate fees are paid. Return this form and the applicable fee to: Department of Environmental Quality Water Protection Bureau PO Box 200901 Helena, MT 59620-0901 (406) 444-3080 Section – Miscellaneous Information Use this space to identify miscellaneous information that is to be included in the SWPPP. Dan Sampon Owner's Construction Manager 406-497-6700 FOE E E CO CO EX. SS MHRIM = 24.02I.E. 8" (N&S) = 18.42± SS MHRIM = 25.76I.E. 8" (N&S)= 16.11±I.E. 24" (E&W) = 15.11 SD CURB INLETRIM = 25.47I.E. 12" RCP (S)= 22.80 SD MH RIM = 25.74 I.E. 12" RCP (N/S/W)= 21.94 SD AREA INLET RIM = 24.31 I.E. = WS W8" PVC12"W2" WS 1" RV 4" FL 8" DIPWS8" PVC8" DIPEXISTINGRETENTIONPOND SDSDSDSDSDS D 4 7 18 4718 47194720 4721 47 21 4 72 2472 3 4720 4721 4722 4723 47244724472347 224 7 2 5 4726 4727 4727 4726 4725 4724 4 7 2 3 47234722472147204719471947184719 BMP NOTES: 1. BMP INSTALLATION & MAINTENANCE PER CITY OF BOZEMAN BMP MANUAL, DEQ "STORM WATER MANAGEMENT DURING CONSTRUCTION FIELD GUIDE" AND/OR MDT BMPINSTALLATION GUIDELINES.2. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ONSITE PORTABLE TOILETS ASNEEDED. PORTABLE TOILETS SHALL BE PROPERLY INSTALLED TO AVOIDCONTAMINATION POTENTIAL.3. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING DUST CONTROL PRACTICETHROUGHOUT CONSTRUCTION AND IN ACCORDANCE WITH COB REQUIREMENTS.4. CONTRACTOR SHALL MAINTAIN SPILL RESPONSE KIT ONSITE DURING CONSTRUCTIONACTIVITIES. 5. EQUIPMENT FUELING OPERATIONS MUST BE PROPERLY MAINTAINED TO AVOID SPILL POTENTIAL. 6. EQUIPMENT AND MATERIAL STORAGE SHALL BE LOCATED WHERE CONTAMINATION POTENTIAL IS REDUCED. MATERIAL AND VEHICLE STORAGE MUST BE LOCATED TO AVOID CONTAMINATION FROM LEAVING SITE AND POTENTIALLY ENTERING ADJACENT PROPERTIES. 7. CONCRETE WASHOUT MUST BE UTILIZED PER DEQ GUIDE. ALTERNATIVELY, PLASTIC CHILDREN'S POOLS MAY BE UTILIZED AS CONCRETE WASHOUT. CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING UP EXCESS CONCRETE SPILLED ALONG FORMSIMMEDIATELY FOLLOWING COMPLETION OF CONCRETE POUR.8. UP-TO-DATE SWPPP MAP SHALL BE MAINTAINED ONSITE THROUGHOUTCONSTRUCTION. CHANGES TO BMP PLAN INCLUDING CHANGES IN BMP LOCATIONSSHALL BE DOCUMENTED ON PLAN.9. MAINTAIN CONSTRUCTION SITE BOUNDARY BELOW ADJACENT SIDEWALK GRADE TOMAINTAIN STORMWATER ONSITE DURING CONSTRUCTION AND TO MINIMIZE SEDIMENTDISCHARGE WHERE FEASIBLE.10. SEED/LANDSCAPE ALL DISTURBED AREAS AS SOON AS PRACTICAL FOLLOWINGEARTHWORK ACTIVITIES TO MINIMIZE EROSION POTENTIAL. 11. CONTRACTOR SHALL BE RESPONSIBLE FOR EMPLOYING SLOPE ROUGHENING ON ALL NEW SLOPES FOLLOWING DIRTWORK ACTIVITIES. ADDITIONAL STABILIZATION MAY BE NECESSARY PRIOR TO LANDSCAPING. 12. CARE SHALL BE TAKEN TO APPLY ALL HERBICIDES, PESTICIDES, AND FERTILIZERS AT MANUFACTURER'S RECOMMENDED RATES TO MINIMIZE OVER-SPREADING. IMMEDIATELY CLEAN ALL OVER-SPREADING TO MINIMIZE CONTAMINATION POTENTIAL. 13. CONTRACTOR SHALL PROVIDE DEWATERING CONTROLS IN THE EVENT DEWATERINGIS NECESSARY ONSITE. REFER TO COB BMP DETAILS FOR ADDITIONAL INFO. NOTE:ADDITIONAL PERMITTING SHALL BE NECESSARY. EX TOWN PUMP C-STORE EX CAR WASH BAXTER LANEN. 19TH AVEEX. PROPERTYLINE (TYP.) EX. PROPERTY LINE (TO BE RELOCATED) RELOCATED PROPERTY BOUNDARY PRE-CONSTRUCTION DISCHARGE LOCATION PRE-CONSTRUCTION & POST-CON DISCHARGE LOCATION PROVIDESAW-CUTTINGCONTROLSDURING DEMO PROVIDE INLET PROTECTION PROVIDE ROCKWATTLE W/INCURB LINE PROVIDE SILTFENCEPERIMETERCONTROL PROVIDE SILT FENCE PERIMETER CONTROL PROVIDE TRACKING CONTROL(NOTE: UPDATE SITE MAP FORALTERNATIVE LOCATIONS) MAINTAIN EX. VEGETATION TO M.E.P. PROVIDE SEDIMENTCONTROL WHEN VEG. DISTURBED DO NOT DISTURB OFFSITE VEGETATION (TYP.) DO NOT DISTURBEX. RET. POND FLOW DIRECTION (TYP.) GENERAL LOCATION FOR MATERIAL STORAGE,WORKER TOILETS, CONCRETE WASHOUT.UPDATE MAP AS NEEDED FOR DIFFERINGLOCATIONS CONTRACTOR SHALL SWEEPANY TRACKED SEDIMENTSFROM STREET IMMEDIATELY PROVIDE SAW-CUTTINGCONTROLS (TYP. ALLLOCATIONS) PROPOSED DEQSIGNAGELOCATION PROVIDE ROCKWATTLE W/INFLOW LINE EX. WETLANDS (RECEIVING WATERS) 21 SHEET: BY: DATE: OWNER FILE NUMBER: DRAWING INFORMATION: BSCE PROJECT NUMBER: ASSOCIATED PROJECTS: CADD FILE NAME: PROJECT NAME: SHEET TITLE: LAND SURVEYORS - ENVIRONMENTAL SPECIALISTS 1324 13th Ave. SWP.O. BOX 3625GREAT FALLS, MT 59403(406)727-2185 OFFICE(406)727-3656 FAXwww.bigskyce.com ENGINEERS - PLANNERS - DESIGNERS - PROFESSIONAL SEAL OWNER: OF 23O XXXX23O-SWPPP-1 XXXX CJM BOZEMAN, MT. ATWELL SUITES RE LLC BOZEMAN 7 0' 30' 60' 6/21/24 SITE SWPPP PHASE 1 (INITIAL CONST.) FOE E E CO CO EX. SS MH RIM = 24.02 I.E. 8" (N&S) = 18.42± SS MH RIM = 25.76 I.E. 8" (N&S)= 16.11± I.E. 24" (E&W) = 15.11 SD CURB INLET RIM = 25.47 I.E. 12" RCP (S)= 22.80 SD MHRIM = 25.74I.E. 12" RCP (N/S/W)= 21.94 SD AREA INLETRIM = 24.31I.E. = WS W8" PVC12"W2" WS 1" RV 4" FL 8" DIPW8" DIP8" PVC SS W WSD SD SD SD SD SDS DSDSDSDSD SDSD SDS SD 8" DIP8" PVC8" DIPEXISTINGRETENTIONPOND SDSDSDSDSDSD47 18 4718 47194720 4721 4721 4 722 4 723 4720 4721 4722 4723 4724472447 23472 2 4 7 2 5 4726 4727 4727 4726 4725 4724 472 3 47234722472147204719471947184719 SD SD GW 4 7 24 4 7 24 4724472547 254725472547244725472547 244724 47234722472147204720 472447244726 4 72 5 4721 4722 4724 4725 G SD 47261 9 2 0 192020191821 2019 19 20 20 19 18 18 19 20201918 1819 20 21 22 2320.520.520.520.5 20.520.5 232424 BMP NOTES: 1. BMP INSTALLATION & MAINTENANCE PER CITY OF BOZEMAN BMP MANUAL, DEQ "STORM WATER MANAGEMENT DURING CONSTRUCTION FIELD GUIDE" AND/OR MDTBMP INSTALLATION GUIDELINES.2. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ONSITE PORTABLE TOILETSAS NEEDED. PORTABLE TOILETS SHALL BE PROPERLY INSTALLED TO AVOIDCONTAMINATION POTENTIAL.3. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING DUST CONTROL PRACTICETHROUGHOUT CONSTRUCTION AND IN ACCORDANCE WITH COB REQUIREMENTS.4. CONTRACTOR SHALL MAINTAIN SPILL RESPONSE KIT ONSITE DURINGCONSTRUCTION ACTIVITIES.5. EQUIPMENT FUELING OPERATIONS MUST BE PROPERLY MAINTAINED TO AVOID SPILL POTENTIAL. 6. EQUIPMENT AND MATERIAL STORAGE SHALL BE LOCATED WHERE CONTAMINATION POTENTIAL IS REDUCED. MATERIAL AND VEHICLE STORAGE MUST BE LOCATED TO AVOID CONTAMINATION FROM LEAVING SITE AND POTENTIALLY ENTERING ADJACENT PROPERTIES. 7. CONCRETE WASHOUT MUST BE UTILIZED PER DEQ GUIDE. ALTERNATIVELY, PLASTIC CHILDREN'S POOLS MAY BE UTILIZED AS CONCRETE WASHOUT. CONTRACTOR SHALLBE RESPONSIBLE FOR CLEANING UP EXCESS CONCRETE SPILLED ALONG FORMSIMMEDIATELY FOLLOWING COMPLETION OF CONCRETE POUR.8. UP-TO-DATE SWPPP MAP SHALL BE MAINTAINED ONSITE THROUGHOUTCONSTRUCTION. CHANGES TO BMP PLAN INCLUDING CHANGES IN BMP LOCATIONSSHALL BE DOCUMENTED ON PLAN.9. MAINTAIN CONSTRUCTION SITE BOUNDARY BELOW ADJACENT SIDEWALK GRADE TOMAINTAIN STORMWATER ONSITE DURING CONSTRUCTION AND TO MINIMIZE SEDIMENTDISCHARGE WHERE FEASIBLE.10. SEED/LANDSCAPE ALL DISTURBED AREAS AS SOON AS PRACTICAL FOLLOWING EARTHWORK ACTIVITIES TO MINIMIZE EROSION POTENTIAL. 11. CONTRACTOR SHALL BE RESPONSIBLE FOR EMPLOYING SLOPE ROUGHENING ON ALL NEW SLOPES FOLLOWING DIRTWORK ACTIVITIES. ADDITIONAL STABILIZATION MAY BE NECESSARY PRIOR TO LANDSCAPING. 12. CARE SHALL BE TAKEN TO APPLY ALL HERBICIDES, PESTICIDES, AND FERTILIZERS AT MANUFACTURER'S RECOMMENDED RATES TO MINIMIZE OVER-SPREADING. IMMEDIATELY CLEAN ALL OVER-SPREADING TO MINIMIZE CONTAMINATION POTENTIAL. 13. CONTRACTOR SHALL PROVIDE DEWATERING CONTROLS IN THE EVENTDEWATERING IS NECESSARY ONSITE. REFER TO COB BMP DETAILS FOR ADDITIONALINFO. NOTE: ADDITIONAL PERMITTING SHALL BE NECESSARY. EX TOWN PUMP C-STORE EX CAR WASH BAXTER LANEN. 19TH AVEEX. PROPERTY LINE (TYP.) POST-CON DISCHARGE LOCATION PROVIDE INLETPROTECTION PROVIDE ROCK WATTLE W/IN CURB LINE PROVIDE SILT FENCE PERIMETER CONTROL PROVIDE SILT FENCE PERIMETER CONTROL PROVIDE TRACKING CONTROL (NOTE: UPDATE SITE MAP FOR ALTERNATIVE LOCATIONS) DO NOT DISTURB OFFSITEVEGETATION(TYP.) DO NOT DISTURB EX. RET. POND FLOW DIRECTION(TYP.) GENERAL LOCATION FOR MATERIAL STORAGE,WORKER TOILETS, CONCRETE WASHOUT.UPDATE MAP AS NEEDED FOR DIFFERINGLOCATIONS CONTRACTOR SHALL SWEEPANY TRACKED SEDIMENTSFROM STREET IMMEDIATELY PROVIDE SAW-CUTTINGCONTROLS (TYP. ALLLOCATIONS) PROPOSED DEQ SIGNAGE LOCATION PROVIDE ROCKWATTLE W/IN FLOW LINE NEW RETENTION POND. CONTRACTOR SHALL REMOVE ACCUMULATED SEDIMENT FOLLOWING CONSTRUCTION NEW RETENTION POND. CONTRACTOR SHALL REMOVE ACCUMULATED SEDIMENT FOLLOWING CONSTRUCTION PROVIDE RIP RAPFOLLOWINGGRADING (TYP.) PROVIDE INLET PROTECTION FOLLOWING SDINSTALL (TYP.ALL) NEW RETAININGWALL PROVIDE SLOPE ROUGHENING UNTILLS INSTALL HAS BEEN COMPLETED(TYP.) PROVIDE ROCK WATTLE W/IN CURB LINE PROVIDE INLETPROTECTION EX. WETLANDS (RECEIVINGWATERS) 22 SHEET: BY: DATE: OWNER FILE NUMBER: DRAWING INFORMATION: BSCE PROJECT NUMBER: ASSOCIATED PROJECTS: CADD FILE NAME: PROJECT NAME: SHEET TITLE: LAND SURVEYORS - ENVIRONMENTAL SPECIALISTS 1324 13th Ave. SWP.O. BOX 3625GREAT FALLS, MT 59403(406)727-2185 OFFICE(406)727-3656 FAXwww.bigskyce.com ENGINEERS - PLANNERS - DESIGNERS - PROFESSIONAL SEAL OWNER: OF 23O XXXX23O-SWPPP-2 XXXX CJM BOZEMAN, MT. ATWELL SUITES RE LLC BOZEMAN 7 0' 20' 40' 6/21/24 SITE SWPPP PHASE 2 (FINAL GRADING)