1.0 General Information:
The following report is intended to summarize the storm drainage plan for the development of
the proposed site directly east of 1871 Baxter Lane. The site is currently vacant and a new hotel
building and corresponding parking improvements are proposed for construction.
The hotel project is being completed by the following entity:
Bozeman 7 RE LLC
PO Box 6000
Butte, MT 59701
The following report was completed by:
Kevin May, P.E. – 38402PE
Big Sky Civil & Environmental, Inc.
1.1 Extent of Storm Drainage:
The subject property is currently undeveloped and generally contains existing vegetation
consisting of dryland grasses along with sporadic gravel surfacing. No existing wetlands,
forestlands, or other vegetation patterns currently existing on the property. Storm water is
generally conveyed overland from the southeast to northwest utilizing sheet flow at
approximately 2% slope before ultimately entering the existing wetlands that lie northwest of the
subject property.
As shown in the attached civil development plans, development is proposed to be completed
throughout the subject lot and all new improvements added to the property will be conveyed to a
new retention pond where shown.
1.1.A – Existing C-Store Drainage System:
The existing C-store and Carwash development includes an existing retention pond designed
to capture the 10-year, 2-hour storm event. The proposed hotel development includes the
removal of some existing parking area (north side of development) as well as revised grading
for areas contributing to the existing retention pond (south entrance). Based on the proposed
site grading,the overall impervious surfacing entering the existing retention pond
structure will be reduced approximately 800 sf.Additionally, as detailed in Storm
Exhibits #2 & #3, the overall post-construction contributing area to the existing pond is
Storm Drainage Report Page 2
less than the 2.98 acres considered within the original design; therefore, the retention
storage within the existing pond is considered adequate for continued use.
1.2 Proposed Drainage System:
The drainage system proposed for the hotel site consists of site grading to storm drainage inlets
where stormwater is piped and conveyed to a new retention pond which is sized to capture the
10-year, 2-hour storm event. Additionally, roof downspouts are proposed to be piped and
conveyed to the new underground stormwater piping. No release from the pond is being pursued;
therefore, pre-development flow rates will be maintained. The proposed retention pond overflow
is directed to the existing wetland area to maintain runoff from the project within existing flow
channels. Impacts to downstream properties are not anticipated due to the size of the proposed
retention pond.
The development will consist of the construction of the hotel building, parking lot, as well as
other surface improvements ancillary to the hotel development which will increase impervious
surfacing and overall runoff from the subject property. Table 1 below details the estimated runoff
volumes anticipated for the post development conditions for the new improvements. Refer to the
civil development plans for information detailing the proposed improvements. Peak flow rates
were determined using the Rational Method.Note: as detailed within the attached calculations
and storm drainage contributing exhibits, the calculations were completed utilizing a
conservative drainage area and runoff coefficient when compared to Storm Drainage
Exhibit 1; therefore, the overall calculations can be considered conservative.
Table 1: Estimated Developed Runoff Volume (cf) & Peak Runoff Rate (cfs)
Basin Time of
Concentration
Runoff
Volume (10-
yr Storm)
Peak Runoff
Rate
(10-yr Storm)Tc (min)
Overall 9.88 6504 cf 4.56 cfs
1.3 Design Conditions:
1.3.A – Initial Storm Water Facility
As the proposed site design includes an onsite retention pond capable of retaining the 10-
year, 2-hour storm event, an initial storm water facility is not required for the site and the
initial 0.5” water quality storm event will be captured and retained as required.
1.3.B – Stormwater Retention Pond
The proposed storm drainage system includes the construction of a new retention pond sized
to capture the 10-year, 2-hour storm event per the City’s design standards. Refer to the
attached calculations for additional information. Table 3 below details the required storage
volume vs. the proposed retention storage volume planned for the site. As shown, the
proposed pond structure is adequately sized to capture the necessary storm event.
Storm Drainage Report Page 3
Table 2: Retention Pond Summary
Initial Storm Facility Summary Capacity
Required Retention Storage (cf)6,504
Proposed Retention Storage (cf)7,524
The proposed retention pond is equipped with a stabilized emergency overflow in the event
high-intensity storm events exceed the retention volume provided. The stabilized overflow is
directed to the existing flow channel/outlet location for the site which ultimately enters the
existing wetland area northwest of the subject site.
1.3.C – Storm Drainage Piping
Onsite storm drainage piping will consist of PVC materials as detailed on the development
plans. Additionally, PVC storm drainage lines will be extended to the building to serve the
internal downspouts. Onsite storm drainage piping was sized to convey the peak runoff rate
associated with the design 10-year storm event per Table I-3 of the design standards. Refer to
Table 4 below for information regarding the anticipated storm drainage capacity versus
anticipated peak runoff rate.
Table 3: Storm Drainage Capacity vs. Peak Runoff
Runoff Basin Basin Size (ac)10-yr Peak Runoff Rate (cfs)*
Overall 2.754 4.56
Subbasin -East 1.215 2.01
Subbasin -West 0.749 1.24
Pipe Capacity -12” PVC @ 0.5% Slope 3.03
Pipe Capacity -12” PVC @ 2.0% Slope 6.06
*Note: anticipated peak runoff rates for sub-basins calculated as weighted average of overall
runoff based on contributing area.
As shown in Table 3, the proposed 12” piping at 0.5% slope has adequate capacity to convey
the anticipated flows from the East and West sub-basins and the outlet piping to the pond
includes adequate capacity for the overall site’s anticipated peak runoff rate.
EXISTINGRETENTIONPONDBAXTER LNN 19 TH AVEEXIST.C-STOREEXIST.CARWASHNEWHOTELASPHALTBUILDINGCONCRETELANDSCAPE18975.1 SF.16231.3 SF.55363.2 SF.26369.9 SF.52189.8 SF.2756.1 SF.417.3 SF.15655.3 SF.576.0 SF.25.3 SF.204.4 SF.192.8 SF.1727.5 SF.116.9 SF.127.6 SF.127.0 SF.318.3 SF.2719.5 SF.45.1 SF.420.4 SF.349.2 SF.509.7 SF.548.8 SF.199.1 SF.92.3 SF.32.8 SF.246.7 SF.318.7 SF.1595.8 SF.1314.1 SF.88.7 SF.416.2 SF.748.0 SF.240.7 SF.756.0 SF.174.7 SF.289.2 SF.1091.5 SF.172.8 SF.183.2 SF.335.7 SF.7478.0 SF.345.3 SF.81.2 SF.563.6 SF.2579.4 SF.214.0 SF.6487.3 SF.55.1 SF.1331.1 SF.2137.8 SF.331.0 SF.2774.9 SF.75.5 SF.2856.0 SF.289.7 SF.246.7 SF.1769.7 SF.OVERALL 116939.5 SF.CONTRIBUTINGSTORM SYSTEM1AREA SUMMARY23OXXXXEXHIBIT 2XXXXCJM2/17/25RE LLCBOZEMAN 7ATWELL SUITESBOZEMAN, MTFIGURE:BY:DATE:OWNER FILE NUMBER:DRAWING INFORMATION:OFFICE PROJECT NUMBER:ASSOCIATED PROJECTS:CADD FILE NAME:PROJECT NAME:SHEET TITLE:LAND SURVEYORS - ENVIRONMENTAL SPECIALISTS1324 13th Ave. SWP.O. BOX 3625GREAT FALLS, MT 59403(406)727-2185 OFFICE(406)727-3656 FAXwww.bigskyce.comENGINEERS - PLANNERS - DESIGNERS -PROFESSIONAL SEALOWNER:0' 30' 60'HOTEL(POST-DESIGN)
EXISTINGRETENTIONPOND471847184719 4720472147214722472347204 7 21
4 7 2 2
4 723
4724
4724
47234722
4725472647274727472647254724472347234722472147204719
471947184719-791.8 SF.(LS AREA)98480 SF.(OVERALL AREA)EXIST. IMPERVIOUS AREA = 91,803.4 SF.EXIST. LS AREA = 6,676.6 SF.(LS AREA)-5884.8 SF.CONTRIBUTING BASIN BOUNDARYBAXTER LNN 19 TH AVEEXIST.C-STOREEXIST.CARWASHNEWHOTELCONTRIBUTINGSTORM SYSTEM2AREA SUMMARY23OXXXXEXHIBIT 2XXXXCJM2/17/25RE LLCBOZEMAN 7ATWELL SUITESBOZEMAN, MTFIGURE:BY:DATE:OWNER FILE NUMBER:DRAWING INFORMATION:OFFICE PROJECT NUMBER:ASSOCIATED PROJECTS:CADD FILE NAME:PROJECT NAME:SHEET TITLE:LAND SURVEYORS - ENVIRONMENTAL SPECIALISTS1324 13th Ave. SWP.O. BOX 3625GREAT FALLS, MT 59403(406)727-2185 OFFICE(406)727-3656 FAXwww.bigskyce.comENGINEERS - PLANNERS - DESIGNERS -PROFESSIONAL SEALOWNER:0' 30' 60'C-STORE(EXISTING)
EXISTINGRETENTIONPOND-5884.8 SF.(LS AREA)-823.8 SF.(LS AREA)-132.5 SF.(LS AREA)102297.4 SF.(OVERALL AREA)-3491.3 SF.(LS AREA)-972.5 SF.(LS AREA)NEW IMPERVIOUS AREA = 90,992.5 SF.NEW LS AREA = 11,304.9 SF.CONTRIBUTING BASIN BOUNDARYBAXTER LNN 19 TH AVEEXIST.C-STOREEXIST.CARWASHNEWHOTELCONTRIBUTINGSTORM SYSTEM3AREA SUMMARY23OXXXXEXHIBIT 2XXXXCJM2/17/25RE LLCBOZEMAN 7ATWELL SUITESBOZEMAN, MTFIGURE:BY:DATE:OWNER FILE NUMBER:DRAWING INFORMATION:OFFICE PROJECT NUMBER:ASSOCIATED PROJECTS:CADD FILE NAME:PROJECT NAME:SHEET TITLE:LAND SURVEYORS - ENVIRONMENTAL SPECIALISTS1324 13th Ave. SWP.O. BOX 3625GREAT FALLS, MT 59403(406)727-2185 OFFICE(406)727-3656 FAXwww.bigskyce.comENGINEERS - PLANNERS - DESIGNERS -PROFESSIONAL SEALOWNER:0' 30' 60'C-STORE(POST-DESIGN)
Atwell Suites – Bozeman, MT – Storm Drainage Engineering Report
Appendix A – Calculations
Project:23O - Atwell Suites Hotel - Bozeman MT
Subject:Storm Drainage Calculations
Date:6/11/2024
Engineer:Kevin May, P.E.
Drainage Basin Information
Land Use Commercial
Drainage Area (ac)2.754 (Includes Hotel Property & Shared Parking Area)
Slope (%)2
Runoff Coeff.0.8 (Per CoB Design Stds Table I-1)
Frequency Adjust. Factor (Cf)1.0 (10-yr Rainfall Frequency)
Time of Concentration Calculations - Developed Site
Flow Length (ft)125 (Ridge to Inlet B-3)
Slope (%)2.0
Time of Concentration (min)5.0 (Per Figure I-1)
Flow Length (ft) =450 (Inlet B-3 to Ret. Pond)
Slope (%) =0.005
n =0.013
R =0.08
V =1.54 ft/sec 12" Area 0.131 ft2
Time of Concentration (min)4.88 12" WP 1.571 ft (50% full)
R = A/WP
Total Tc =9.88 min
Peak Flow Calculations
Design Storm 10-year (Per CoB Design Stds Table I-3)
Intensity @ Tc (figure I-2)2.07 in/hr
Peak Runoff Rate (cfs)4.56
Retention Pond Sizing Calculations
Given: Q=CiA & V = 7200Q
C-Factor 0.8
I (in/hr)0.41
A (ac)2.754
Q (cfs) =0.903
V (cf) =6504
Overland Flow
Channelized/Pipe Flow
𝑉=1.486
𝑛𝑅2/3𝑅1/2
Tc = 5 min
Tc=9.88 min
23O - Atwell Suites Hotes
Retention Pond Capacity
2/17/2025
Elevation Area Volume (ft3)Total Pond Depth 2.0 ft
4720 5835
4765 Total Pond Volume 7524 cf
4719 3695
1606 Req'd Pond Volume 6504 cf
4718.5 2727
1153
4718 1885
Total Volume 7524 Cubic Feet
23O - Atwell Suites Hotel
Retention Pond Overflow Capacity
5/23/2024
Retention Pond Overflow
Pond Overflow Design*
10-yr Peak Runoff 4.56 cfs
Rectangular Weir Design (DEQ 8 Appendix D.2)
Q =5.180 cfs Q=3.33*(h^1.5)*(L-0.2h)
h =0.5 ft
L =4.5 ft
*Note: Rectangular Weir Calculation Conservative as overflow
will have sloped side walls
23O - Atwell Suites Hotel
Pipe Capacity Calcs
5/20/2024
Open Channel Flow mannings n:
0.01 Glass, Copper, Plastic - Smooth
Trapezoid Geometry:0.012 Steel or Wood - smooth
Input:0.013 Painted Steel or coated cast iron
Calculated:0.014 uncoated steel, clay pipe
0.015 brick cement mortar, float fin. Concrete
Bot. Wdth b =feet 0.017 unfinished concrete
Side Sl z =feet 0.022 clean excavated earth
Depth y =feet 0.024 corrugated metal pipe
Slope S =ft/ft 0.05 earth with light vegetation
Mannings n ={see table}0.1 earth with heavy vegetation
A =0
WP =0
R =#DIV/0!
Q =#DIV/0!cfs
V =#DIV/0!fps
Circular Geometry:
D =1.0 ft
y =0.9 ft
S =0.0050 ft/ft
n =0.01 {see table}
=4.99618309 {calculated}
T =0.6 {calculated}
A =0.744522886 {calculated}
WP =3.098091545 {calculated}
R =0.240316619 {calculated}
Q =3.032050725 cfs
Q =1360.784365 GPM
V =4.072474845 fps
23O - Atwell Suites Hotel
Pipe Capacity Calcs - MH A-1 to Pond
5/20/2024
Open Channel Flow mannings n:
0.01 Glass, Copper, Plastic - Smooth
Trapezoid Geometry:0.012 Steel or Wood - smooth
Input:0.013 Painted Steel or coated cast iron
Calculated:0.014 uncoated steel, clay pipe
0.015 brick cement mortar, float fin. Concrete
Bot. Wdth b =feet 0.017 unfinished concrete
Side Sl z =feet 0.022 clean excavated earth
Depth y =feet 0.024 corrugated metal pipe
Slope S =ft/ft 0.05 earth with light vegetation
Mannings n ={see table}0.1 earth with heavy vegetation
A =0
WP =0
R =#DIV/0!
Q =#DIV/0!cfs
V =#DIV/0!fps
Circular Geometry:
D =1.0 ft
y =0.9 ft
S =0.0200 ft/ft
n =0.01 {see table}
=4.99618309 {calculated}
T =0.6 {calculated}
A =0.744522886 {calculated}
WP =3.098091545 {calculated}
R =0.240316619 {calculated}
Q =6.06410145 cfs
Q =2721.568731 GPM
V =8.144949689 fps
Atwell Suites – Bozeman, MT – Storm Drainage Engineering Report
Appendix B – Storm Drainage Operation
& Maintenance Manual
Storm Drainage Maintenance Plan Page 1 of 2
ATWELL SUITES
BOZEMAN, MT
STORM DRAINAGE OPERATION & MAINTENANCE PLAN
JUNE 2024
General Information:
The project is being completed by Bozeman 7 RE LLC and the project owner shall be responsible for
operation and maintenance of the storm drainage system. Owner contact information is as follows:
Bozeman 7 RE LLC
PO Box 6000
Butte, MT 59701
Storm Sewer System Maintenance
The storm sewer system serving the subject project is a privately owned and maintained storm water
treatment and retention system. It is the responsibility of the property owner to operate and maintain the
system. If personnel should notice any portion of the system that has been damaged or is not of the
original characteristics, the deficiencies or damages in the system should be brought to the attention of the
Owner immediately.
The Owner shall provide routine maintenance on an as-needed basis to maintain the integrity of the
system by constant repair of minor problems when they occur. Routine inspections shall be conducted at a
minimum of biannually to determine if any of the storm drainage features or roadways are in need of
repair. Routine maintenance includes, but is not limited to the following:
Curb & Gutter and VG Cleaning – maintain clean flow line through the onsite grading structures. Sweep
collected sediments and remove from site/properly dispose.
Manhole Cleaning – clean debris and/or sediment deposits in manholes. Remove accumulated sediment
from manhole sumps.
Storm Sewer Piping Cleaning – maintain clean inlet, outlet, and flow line through the onsite piping.
Outlet Structure – clean debris from area, ensure outlet structure is in good working condition, repair
damage to outlet structure as necessary.
Retention Pond – clean debris from area, remove sediment deposits from base of pond structure in the
event infiltration rates are reduced due to clogging.
Seasonal Inspection:
An authorized representative for the Owner shall conduct at a minimum, seasonal inspection of the storm
sewer system including the retention pond and other onsite improvements. Maintain records of all
inspections and any corrective measures taken, as applicable.
The inspection shall consist of a visual inspection throughout the system. The following is a list of items
that require immediate corrective measures, if encountered:
Plugged/Damaged Piping – Piping should be inspected and cleaned if the inlet/outlet side is plugged by
sediment, debris buildup, or other obstructions. Clean pipe ends to maintain conduit capacity and flow
Storm Drainage Maintenance Plan Page 2 of 2
characteristics. Replacement of piping may be warranted if they are damaged (crushed or deteriorated) to
a level that they cannot function at their intended capacity.
Manholes/Inlets – Manholes and inlets should be inspected and cleaned if debris buildup is present within
the structure. Manholes and inlets should be inspected to note integrity of structure and repair concrete
sidewalls as needed.
Grading Structures – Onsite valley gutter and curbing should be inspected and cleaned if debris is noted
within the structures that is obstructing the flow of storm water runoff. Damage to curbing or valley gutter
due to traffic should be noted and repaired if it is affecting the flow of water.
Parking Lot Asphalt – Onsite asphalt should be inspected and areas of deterioration should be noted.
Asphalt patching may be necessary in areas where pot-holing has occurred. Note areas of storm water
ponding during inspections for potential maintenance.
Retention Pond – The onsite pond shall be visually inspected and any bank erosion noted shall be
remedied immediately. The overflow structure shall be reviewed and any damage to, erosion around, or
deterioration of the overflow structure shall be remedied immediately. Weed growth within the pond area
shall be remedied immediately. Accumulated sediments within the retention storage area should be
removed periodically to maintain effective infiltration rates.