HomeMy WebLinkAbout23O - 3 Storm Calcs - HotelProject:23O - Atwell Suites Hotel - Bozeman MT Subject:Storm Drainage Calculations Date:4/22/2025 Engineer:Kevin May, P.E. Drainage Basin Information Land Use Commercial Drainage Area (ac)2.685 (Includes Hotel Property & Shared Parking Area) Slope (%)2 Runoff Coeff.0.720 (See Below) Frequency Adjust. Factor (Cf)1.1 (25-yr Rainfall Frequency) Hotel Drainage Basin: C-Factor Calculation Item Area (sf)C-Factor Imperv. Surfacing 90569.6 0.9 Landscaping Area 26369.9 0.1 Total Area 116939.5 Composite C Factor 0.720 Contributing Area (sf)116939.5 Contributing Area (ac)2.685 Time of Concentration Calculations - Developed Site Flow Length (ft)125 (Ridge to Inlet B-3) Slope (%)2.0 Time of Concentration (min)5.0 (Per Figure I-1) Flow Length (ft) =450 (Inlet B-3 to Ret. Pond) Slope (%) =0.005 n =0.013 R =0.08 V =1.54 ft/sec 12" Area 0.131 ft2 Time of Concentration (min)4.88 12" WP 1.571 ft (50% full) R = A/WP Total Tc =9.88 min Peak Flow Calculations Design Storm 25-year (Per CoB Design Stds II.A.3.e) Intensity @ Tc (figure I-2)2.47 in/hr Peak Runoff Rate (cfs)5.25 (with C-factor adjustment of 1.1) Retention Pond Sizing Calculations Given: Q=CiA & V = 7200Q C-Factor 0.720 I (in/hr)0.41 A (ac)2.685 Q (cfs) =0.792 V (cf) =5703 Overland Flow Channelized/Pipe Flow 𝑉=1.486 𝑛𝑅2/3𝑅1/2