HomeMy WebLinkAboutResolution 3347 Authorize City Manager to sign Change order 4 for Oak COMMISSION RESOLUTION NO. 3347 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH JTL GROUP, INC., BELGRADE, MONTANA. WHEREAS, the City Commission did, on the 7th day of June 1999, authorize award of the bid for construction of Oak Street between North 7th Avenue and North Rouse Avenue to JTL Group, Inc., Belgrade, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and JTL Group, Inc., as contained in Change Order No.4, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change orders for and on behalf of the City; and the Clerk of the Commission is authorized and directed to attest such signature. PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 7th day of February 2000. M~1~aYor ATTEST: @Z~ ROBIN L. SULLIVAN Clerk of the Commission --.-.. -. -.----- 2<1 d.tJ. CfCJ_ '" THE CITY OF BOZEMAN [](J[@rcUMEij! 20 E. OLIVE. P.O. BOX 640 BOZEMAN, MONTANA 59771-0640 "j r "'I . j . ( . j f ,,"" ~'.. 1999 (1 i !, "1" 1 U "V .' J ~:! j : !~ --,,, j,... t ENGINEERING DEPARTMENT i:f;,.,;.'; "';:"'lW PHONE: (406) 582-2380. FAX: (406) 582-2363 ,j w t.....: ",c>' ,\" .." ',.; {-J L.J I:'. ,." _ __ _ _._ __.._~_......___..._ MEMORANDUM November 12, 1999 j To: Clark V. Johnson, City Manager Through: Patricia Day-Moore, Staff Attorney;' ,t From: James R. Nickelson, Project Engineer Re: Oak Street (North Seventh to North Rouse) Project - Change Order No.4 Attached are 4 original signature copies (Robin Sullivan's cc only) of Change Order No, 4 for the Oak Street (North Seventh to North Rouse) contract with JTL Group, Inc.. The change order consists of the installation of 2 culverts to allow for city maintenance vehicles to service the sewer main in the Fifth Street right of way. The work was not included in the original contract since the sewer main was not installed at the time the plans were completed. The change order increases the contract amount from $548,791.82 by $2,428.80 to a total of $551,220.62. No change in contract time is included in the change. This change reduces the construction contingency from $41,394.75 to $38,965.95. The final price for this change is reasonable and commensurate with the involved work. I recommend that upon the concurrence of the City Attorney, the Change Order be presented to the City Commission for approval. cc: Debbie Arkell, DPS (w/encl) Robin Sullivan, (wi 4 orig. encl) ERF Project File Enclosures HOME OF MONTANA STATE UNIVERSITY GATEWAY TO YELLOWSTONE PARK _.. ..__.__.__.__. ._______..___. ._______________.." ._.___m.__ ____._ __._...__... --.-.--...--- . . CHANGE ORDER ORDER NO.: 4 PROJECT TITLE: Oak Street - North 7th Avenue to Rouse Avenue PROJECT NO.: C.o.B. Project MNI #4 CONTRACT DATE: July 2, 1999 OWNER: City of Bozeman CONTRACTOR: JTL Group, Inc. Change Orders must be accompanied by an itemized cost breakdown. You are hereby requested to comply with the following changes from the Contract Documents. ITEM DESCRIPTION OF CHANGES TOTAL NO. ESTIMATED UNIT UNIT COST QUANTITY COST 1 2"12" X 28' CMP CULVERTS @ 23+20 LEFT 2 EACH $800.00 (+) $1600.00 AND RIGHT, INCLUDING F.E.T.S. 2 1 1/2" ROAD MIX 29.6 C.Y. $28.00 (+) $828.80 TOTAL COST (+) $2,428.80 GRAND TOTAL" THIS CHANGE ORDER (+\ $2,428.80 Original Contract Price $527,186.57 Current Contract Price Adjusted by Previous Change Order $548,791 .82 Cost this Change Order (+ or -) (+) $2428.80 New Contract Price including this Change Order $551,220.62 The completion date as set forth in the Contract Documents shall be (~'n;~~;ig;,!'it, increased, decreased) by 0 calendar days. The date for completion of all work will be: November 30. 1999(unless weather prohibits Davina operations). CO-4 Rev. 11/99 -.-.---.------- ...___....___....__..._.u_._.. , . , Description and Justification for Change: 1. These new 12" CMP culverts are for the sanitary sewer access road that run north and south from this station. By doing this work now, the city trucks will be able to access the sanitary sewer line to do any repairs neccessary. 2. See note number 1. Surety consent is required if the net increase exceeds 20% of the Original Contract Amount. SURETY CONSENT The Surety hereby consents to the aforementioned Contract Change Order and agrees that its bond or bonds shall apply and extend to the Contract as thereby modified or amended per this Change Order. The Principal and the Surety further agree that on or after execution of this consent, the penalty of the applicable Performance Bonds or Bonds is hereby increased by $ (100% of the Change Order amount) and the penalty of the applicable Labor and Material Bond or Bonds is hereby increased by $ (100% of the Change Order amount). COUNTERSIGNED BY MONTANA RESIDENT SURETY AGENT By: Seal Recommended by: ~d'" ;z- ~~5#' 1/-09 -crt L2~/~ Date /1..--- 7--77' Accepted by: . .. Contractor Date Approved by: Owner Date f:lhighways\newoak\construct\change_ 4. wp6 CO-4 Rev. 11/99