COMMISSION RESOLUTION NO. 3347
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN,
MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT
WITH JTL GROUP, INC., BELGRADE, MONTANA.
WHEREAS, the City Commission did, on the 7th day of June 1999, authorize award
of the bid for construction of Oak Street between North 7th Avenue and North Rouse
Avenue to JTL Group, Inc., Belgrade, Montana; and
WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such
alterations or modifications of the specifications and/or plans of the contract be made by
resolution; and
WHEREAS, it has become necessary in the prosecution of the work to make
alterations or modifications to the specifications and/or plans of the contract.
NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of
Bozeman, Montana, that the proposed modifications and/or alterations to the contract
between the City of Bozeman, a municipal corporation, and JTL Group, Inc., as contained
in Change Order No.4, attached hereto, be and the same are hereby approved; and the City
Manager is hereby authorized and directed to execute the contract change orders for and on
behalf of the City; and the Clerk of the Commission is authorized and directed to attest such
signature.
PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana,
at a regular session thereof held on the 7th day of February 2000.
M~1~aYor
ATTEST:
@Z~
ROBIN L. SULLIVAN
Clerk of the Commission
--.-.. -. -.-----
2<1 d.tJ. CfCJ_
'"
THE CITY OF BOZEMAN [](J[@rcUMEij!
20 E. OLIVE. P.O. BOX 640
BOZEMAN, MONTANA 59771-0640 "j r
"'I . j .
( . j f ,,"" ~'.. 1999 (1 i
!, "1" 1 U "V .' J ~:! j
: !~ --,,, j,... t
ENGINEERING DEPARTMENT i:f;,.,;.'; "';:"'lW
PHONE: (406) 582-2380. FAX: (406) 582-2363 ,j w t.....: ",c>' ,\" .." ',.; {-J L.J
I:'. ,." _ __ _ _._ __.._~_......___..._
MEMORANDUM
November 12, 1999 j
To: Clark V. Johnson, City Manager
Through: Patricia Day-Moore, Staff Attorney;' ,t
From: James R. Nickelson, Project Engineer
Re: Oak Street (North Seventh to North Rouse) Project
- Change Order No.4
Attached are 4 original signature copies (Robin Sullivan's cc only) of Change Order No, 4 for the Oak
Street (North Seventh to North Rouse) contract with JTL Group, Inc..
The change order consists of the installation of 2 culverts to allow for city maintenance vehicles to service
the sewer main in the Fifth Street right of way. The work was not included in the original contract since
the sewer main was not installed at the time the plans were completed.
The change order increases the contract amount from $548,791.82 by $2,428.80 to a total of $551,220.62.
No change in contract time is included in the change. This change reduces the construction contingency
from $41,394.75 to $38,965.95.
The final price for this change is reasonable and commensurate with the involved work.
I recommend that upon the concurrence of the City Attorney, the Change Order be presented to
the City Commission for approval.
cc: Debbie Arkell, DPS (w/encl)
Robin Sullivan, (wi 4 orig. encl)
ERF
Project File
Enclosures
HOME OF MONTANA STATE UNIVERSITY
GATEWAY TO YELLOWSTONE PARK
_.. ..__.__.__.__. ._______..___. ._______________.." ._.___m.__ ____._ __._...__... --.-.--...---
.
.
CHANGE ORDER
ORDER NO.: 4
PROJECT TITLE: Oak Street - North 7th Avenue to Rouse Avenue
PROJECT NO.: C.o.B. Project MNI #4
CONTRACT DATE: July 2, 1999
OWNER: City of Bozeman
CONTRACTOR: JTL Group, Inc.
Change Orders must be accompanied by an itemized cost breakdown. You are hereby requested to comply
with the following changes from the Contract Documents.
ITEM DESCRIPTION OF CHANGES TOTAL
NO. ESTIMATED UNIT UNIT COST
QUANTITY COST
1 2"12" X 28' CMP CULVERTS @ 23+20 LEFT 2 EACH $800.00 (+) $1600.00
AND RIGHT, INCLUDING F.E.T.S.
2 1 1/2" ROAD MIX 29.6 C.Y. $28.00 (+) $828.80
TOTAL COST (+) $2,428.80
GRAND TOTAL" THIS CHANGE ORDER (+\ $2,428.80
Original Contract Price $527,186.57
Current Contract Price Adjusted by Previous Change Order $548,791 .82
Cost this Change Order (+ or -) (+) $2428.80
New Contract Price including this Change Order $551,220.62
The completion date as set forth in the Contract Documents shall be (~'n;~~;ig;,!'it, increased, decreased) by
0 calendar days.
The date for completion of all work will be: November 30. 1999(unless weather prohibits Davina operations).
CO-4 Rev. 11/99
-.-.---.-------
...___....___....__..._.u_._..
,
.
,
Description and Justification for Change:
1. These new 12" CMP culverts are for the sanitary sewer access road that run north and south from this
station. By doing this work now, the city trucks will be able to access the sanitary sewer line to do any
repairs neccessary.
2. See note number 1.
Surety consent is required if the net increase exceeds 20% of the Original Contract Amount.
SURETY CONSENT
The Surety hereby consents to the aforementioned Contract Change Order and agrees that its bond or bonds
shall apply and extend to the Contract as thereby modified or amended per this Change Order. The Principal
and the Surety further agree that on or after execution of this consent, the penalty of the applicable
Performance Bonds or Bonds is hereby increased by $ (100% of the Change Order amount)
and the penalty of the applicable Labor and Material Bond or Bonds is hereby increased by $
(100% of the Change Order amount).
COUNTERSIGNED BY MONTANA RESIDENT SURETY
AGENT
By:
Seal
Recommended by: ~d'" ;z- ~~5#' 1/-09 -crt
L2~/~ Date
/1..--- 7--77'
Accepted by: . ..
Contractor Date
Approved by:
Owner Date
f:lhighways\newoak\construct\change_ 4. wp6
CO-4 Rev. 11/99