Loading...
HomeMy WebLinkAbout07-03-25 Public Comment - D. Carty - Fowler Ave Connection, 60% Design Walkthrough, July 9, 2025From:Daniel Carty To:Nicholas Ross Cc:Bozeman Public Comment Subject:[EXTERNAL]Fowler Ave Connection, 60% Design Walkthrough, July 9, 2025 Date:Thursday, July 3, 2025 10:58:25 AM CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. July 3, 2025; 11:00am (Please post this comment in the Fowler Ave Connection public comment folder. Thank you.) Nick Ross, Director of Transportation, City of Bozeman: Last summer's (2024) walkthrough of the Fowler Ave Connection (FAC) road project wasmuch appreciated and especially helpful because survey stakes were used to mark where the road, boulevards, shared-use paths, and other construction effects would be located.Consequently, for the upcoming July 9, 2025, FAC 60% design walkthrough, please: (1) Set survey stakes to show the road width, boulevards, and shared-use paths on both sides, especially where the FAC is near the riparian corridor and to residences; (2) Ensure the survey stakes show not only the road and paths but also the limits ofdisturbance from earth-moving (grading) and impacts from storm-water infrastructure; and (3) Mark those trees to be removed with ribbon tape or tree-marking paint to allow the public to visualize the proposed tree loss. Thank you for scheduling an FAC 60% design walkthrough on July 9, 2025, and thank youfor considering this request. Sincerely, Daniel Carty 213 N. 3rd Ave Bozeman, MT 59715 cc: comments@bozeman.net for the public record