July 3, 2025; 11:00am
(Please post this comment in the Fowler Ave Connection public comment folder. Thank
you.)
Nick Ross, Director of Transportation, City of Bozeman:
Last summer's (2024) walkthrough of the Fowler Ave Connection (FAC) road project wasmuch appreciated and especially helpful because survey stakes were used to mark where
the road, boulevards, shared-use paths, and other construction effects would be located.Consequently, for the upcoming July 9, 2025, FAC 60% design walkthrough, please:
(1) Set survey stakes to show the road width, boulevards, and shared-use paths on both
sides, especially where the FAC is near the riparian corridor and to residences;
(2) Ensure the survey stakes show not only the road and paths but also the limits ofdisturbance from earth-moving (grading) and impacts from storm-water infrastructure; and
(3) Mark those trees to be removed with ribbon tape or tree-marking paint to allow the
public to visualize the proposed tree loss.
Thank you for scheduling an FAC 60% design walkthrough on July 9, 2025, and thank youfor considering this request.
Sincerely,
Daniel Carty