HomeMy WebLinkAboutCC Mass and Scale Tools Work Session 6-24-2025City Commission June 24, 2025
UDC Update
Mass and Scale Work Session
Engage.bozeman.net/udc
Project Resource
Bozeman Development Code
Timeline
2020 2021 2022 2023 2024 2025 2026
Jan 2021 - Oct 2022: BCP implementation -
affordable housing
Nov 2020: Bozeman Community Plan (BCP)
July 1, 2022: UDC update project begins
Aug 11, 2022: Website goes live
Sep 13, 2022 -
May 1, 2023: City
/Board sessions,
neighborhood
meetings
July - Aug 2023: Community Development Board Commission Overview
Aug 14, 2023: Draft code publicly available
Aug 2023: Public open houses and code overview, public hearings begin
Oct 2023 - Sep 2024: Review
pauses, presentations to
neighborhood/ community
Sep 2024: Supplemental Engagement Plan approved
Dec 2024 - May
2025: Open houses,
workshops,
meetings, surveys,
toolkits
May 20, 2025: Supplemental engagement
concludes
May 21, 2025: Revisions begin, public review /
hearings, final decision by Commission
May 17, 2026:
State deadline
for adoption
Sep 12, 2022 - Ongoing: In person public engagement begins
Activities We are here!
Work Session Outline
•Presentation by staff on mass and scale
conceptual approaches
•Questions by City Commission
•Public Comment
•Direction by City Commission regarding
which mass and scale conceptual
approaches to rely on in the updated UDC
Mass and Scale Tools Interactions Example
Note: Lot Size
●Lot Size: 50’ x 130’
●6,500 sq ft
Note: Setbacks
●Setbacks create a buildable
area of 4,400 sq ft
Note: Building Coverage
●40% Maximum Building
Coverage reduces the
buildable area to 2,600 sq ft
Note: Amenity Space
●150 sq ft required (min)
●500 sq ft provided
Note: Height
●Maximum of 3 stories
●6,200 sq ft floor area
(including garages and
porches)
Note: Massing
●Maximum Wall Plate height
of 25’ ensures that the third
story is within the roofline of
the building
Note: Windows and Entrances
●15% - 20% transparency
●Porches and other covered
entry features
●Duplex is compatible with
existing Single Unit homes
Mass and Scale 2D Concepts
Lot setback *^
Lot area *
Lot aggregation (maximum lot size)
Lot coverage *^
Mass and Scale 3D Concepts
Minimum dwelling floor area *^
Height *^
Stories and vertical massing *^
Wall plate ^
Floor Area Ratio (FAR) *
Graduated square footage cap
Building width/size ^
Step backs and planes *^
Zone edge transitions *^
Elevation design requirements *^
Division 38.260. - RULES OF INTERPRETATION
Provides additional details to understand standards and
address the complexities of sites with many different
features and uses.
B2-M
R-A
HOUSING
•Lots of housing variety – including all these kinds of
housing -- already exist in Bozeman
COMMERCIAL
Style, size, and use vary greatly and may
include a residential component.
Style, size, and use vary greatly.
INDUSTRIAL
2D Concepts
Setback *^
Note: Setbacks
●Setbacks create a buildable
area of 4,400 sq ft out of
6,500 sq. ft.
Setback
Lot Area *
Current Code Lot Area Requirements Ranges
Residential: None – 5,000 sq. ft. per dwelling
Industrial: None – 43,560 sq. ft.
Commercial: None – 5,000 sq. ft.
Mixed Use: None – 5,000 sq. ft. per dwelling
Proposed draft does not include this standard
Lot Aggregation
Lot Coverage *^
Note: Building Coverage
●A 40% Maximum Building
Coverage reduces the
buildable surface area to
2,600 sq. ft. from 6,500 sq. ft.
3D Concepts
Minimum Dwelling Size *^
Height *^
Data as of July 1, 2022
Stories/Vertical Massing *^
Measured
floor to floor
Wall Plate Height ^
Roof Type: Front Gable
Total Height: 40’
Max wall plate height:
25’
Note: 3rd floor is within
the roofline of the
building, meets new R-B
requirements
25’
Wall
Plate
Roof Type: Gambrel
Total Height: 40’
Max wall plate height:
25’
Note: 3rd floor is within
the roofline of the
building, meets new R-B
requirements
25’
Wall
Plate
Roof Type: Shed
Total Height: 40’
Max wall plate height:
25’
Note: Wall plate exceeds
25’. Not permitted under
new code
25’
Wall
Plate
NOT PERMITTED
UNDER NEW CODE 25’
Wall
Plate
Roof Type: Shed
Total Height: <40’
Max wall plate height:
25’
Note: Wall plate height
now meets new code
25’
Wall
PlatePERMITTED UNDER NEW CODE
Dormers may
exceed wall plate
(<50% of façade)
25’
Wall
Plate
25’
Wall
Plate
Dormers exceed
50% of façade
NOT PERMITTED
Dormers may
exceed wall plate
(<50% of façade)
25’
Wall
Plate
25’
Wall
Plate
Wall Plate
exceeded
with rear
bump-out
NOT
PERMITTED
Floor Area Ratio *
FAR = Area of structure divided by land area
Graduated Square
Footage Cap for Homes
Building Width ^
Building Width
RA
B2-M
Building Size *^
Building Size
RA
RB
Step Backs &
Planes *^
Step Back
Plane
Note: Existing Code
●6 floors on same wall
plane building pulled
up to streetscape
Note: Example
●Building pulled up to
streetscape
●10’ step-back at 4th
floor
Transitions *^
S Black AveE Olive St
Existing Zoning Map
Draft Zoning Map
B-3
Building Design Standards *^
Commission Discussion & Direction
1.Which combination of tools does the Commission want
to see in the UDC?
Commission Discussion & Direction
1.Continuing to rely on stories for building height?
2.Reducing story height maximum of upper stories?
3.Deleting maximum building size in RA and RB districts
4.Adjusting maximum wall plate height in RB district
5.Continue to leave out minimum lot area and FAR from draft?
6.Apply step backs district wide to districts allowing 4 stories or more?
a.If yes, then are zone edge transitions duplicative?
b.If no, what adjustments do you wish to make to zone edge transitions?
7.Lot aggregation (max lot size)?
8.Graduated square footage cap?