Loading...
HomeMy WebLinkAbout042 - E-4 - EXST BLDG ELECT PLANOSSSSVERIFY SCALE!THESE PRINTS MAY BE REDUCED.LINE BELOW MEASURES ONE INCHON ORIGINAL DRAWING. MODIFY SCALE ACCORDINGLY!2025COPYRIGHT © MORRISON-MAIERLE,SHEET NUMBERPROJECT NUMBERDRAWING NUMBERDATEDESCRIPTIONNO.BYP:\10678-LAUREL PARKWAY LLC\001 - NORTON RANCH LIFT STATION\ACAD\SHEETS\7-ELECTRICAL\E-4_EXST_BLDG_ELECTRICAL_PLAN.DWGREVISIONS DRAWN BY:DSGN. BY:APPR. BY:DATE:Q.C. REVIEWDATE:BY:2880 Technology Blvd WestBozeman, MT 59718406.587.0721www.m-m.netengineers surveyors planners scientistsMorrisonMaierlePLOTTED BY:LEE HAGEMAN ON Jun/04/2025 NORTON RANCH LIFT STATION UPGRADES BOZEMANMONTANAEXISTING BUILDING ELECTRICAL PLAN10678.00142E-4JACBCLBCL06/2025 120.510SCALE IN FEETAGENCY REVIEW (REVISION 2)JUNE 2025EXISTING BUILDING ELECTRICAL PLANSCALE: 1" = 1'-0"GENERAL NOTESA.RECONNECT ALL LIGHTING AND RECEPTACLES TORELOCATED LOAD PANEL, LP-01, RECONNECT ALLHVAC TO RELOCATED LP-01.B.COORDINATE WITH OWNER AN REFER TO EXISTINGSCADA PLC DRAWINGS FOR ADDITIONAL INFORMATIONONE EXISTING PROCESS SYSTEM NEEDED TOCOORDINATE UPGRADING PLANT PROCESS ANDCONTROL EQUIPMENT. EXISTING SCADA PLCDRAWINGS ARE INTEGRATED PROCESS SOLUTIONSPROJ. NO. 2146.KEY NOTESPROVIDE FLOW METER POWER FROM SCADAPANEL, NOR-101.GND ALL PIPING WITH A #2 GND BACK TO SERVICEATS ENTRANCE GROUND BAR.ROUTE CONDUIT UP FROM METER TO CEILING ANDOVERHEAD TO FLOW METER REMOTETRANSMITTERS.1MCC-01EXST EUH-01, ELECTRIC UNITHEATERFE101-2FE101-1TIT101CKT 5EXST UH-01 GAS FIREDUNIT HEATEREXST EF-01 EXHAUST FANCKT 7MSEXST SCADA PANEL,NOR-101FIT101-2FIT101-1EXST OCCUPANCY SENSOR2112(TYP)FIT-101-1FIT-101-2(TYP)NOR-101205/29/20253332