Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
041 - E-3 -ELECT SITE PLAN
GNGNGNG NGSSSSGNGNGNG NGSSSS15S15S15SEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEESSSSSSFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEBPBPBPBPBPBPBPBPBPBPBPBPBPBPBP BP BP BP BP BPVERIFY SCALE!THESE PRINTS MAY BE REDUCED.LINE BELOW MEASURES ONE INCHON ORIGINAL DRAWING. MODIFY SCALE ACCORDINGLY!2025COPYRIGHT © MORRISON-MAIERLE,SHEET NUMBERPROJECT NUMBERDRAWING NUMBERDATEDESCRIPTIONNO.BYP:\10678-LAUREL PARKWAY LLC\001 - NORTON RANCH LIFT STATION\ACAD\SHEETS\7-ELECTRICAL\E-3_ELECTRICAL_SITE-PLAN.DWGREVISIONS DRAWN BY:DSGN. BY:APPR. BY:DATE:Q.C. REVIEWDATE:BY:2880 Technology Blvd WestBozeman, MT 59718406.587.0721www.m-m.netengineers surveyors planners scientistsMorrisonMaierlePLOTTED BY:LEE HAGEMAN ON Jun/04/2025 NORTON RANCH LIFT STATION UPGRADES BOZEMANMONTANAELECTRICAL SITE PLAN10678.00141E-3MBHBCLBCL06/2025 361.530SCALE IN FEETAGENCY REVIEW (REVISION 2)JUNE 2025GENERAL NOTESA.THE COMPLETED INSTALLATION SHALL CONFORM TO ALL APPLICABLE FEDERAL,STATE, AND LOCAL ORDINANCES AND REGULATIONS. CONTRACTOR SHALL OBTAINNECESSARY PERMITS AND INSPECTIONS REQUIRED BY THE GOVERNINGAUTHORITIES. ALL WORK SHALL BE DONE IN A NEAT, WORKMANLIKE, FINISHED, ANDSAFE MANNER, ACCORDING TO THE LATEST PUBLISHED N.E.C.A. STANDARDS OFINSTALLATION, UNDER COMPETENT SUPERVISION.B.THIS PROJECT CONSISTS OF NEW AREAS OF THE NORTON RANCH LIFT STATION INBOZEMAN, MT. VISIT THE SITE PRIOR TO BIDDING TO BECOME FAMILIAR WITHEXISTING CONDITIONS AND ALL FACTORS/INCIDENTAL WORK WHICH MAY AFFECTTHE EXECUTION OF THIS WORK.C.ALL MATERIALS SHALL BE NEW AND OF THE BEST QUALITY, MANUFACTURED INACCORDANCE WITH NEMA, ANSI, U.L., OR OTHER APPLICABLE STANDARDS. THE USEOF MANUFACTURERS NAMES, MODELS AND NUMBERS IS INTENDED TO ESTABLISHSTYLE, QUALITY, APPEARANCE, USEFULNESS AND BID PRICE. PROPOSEDSUBSTITUTIONS SHALL BE SUBMITTED DURING THE SUBMITTAL PROCESS INWRITING AND REVIEWED BY THE ENGINEER PRIOR TO ORDERING THE EQUIPMENT.D.PROTECT ALL ELECTRICAL MATERIAL AND EQUIPMENT INSTALLED UNDER THISDIVISION AGAINST DAMAGE BY OTHER TRADES, WEATHER CONDITIONS OR ANYOTHER CAUSES. EQUIPMENT FOUND DAMAGED OR IN OTHER THAN NEW CONDITIONWILL BE REJECTED AS DEFECTIVE.E.LEAVE THE SITE CLEAN, REMOVE ALL DEBRIS, EMPTY CARTONS, TOOLS, CONDUIT,WIRE SCRAPS AND ALL MISCELLANEOUS SPARE EQUIPMENT AND MATERIALS USEDIN THE WORK DURING CONSTRUCTION. ALL COMPONENTS SHALL BE FREE OF DUST,GRIT, AND FOREIGN MATERIALS, LEFT AS NEW BEFORE FINAL ACCEPTANCE OFWORK. PRIME AND REPAINT ALL STRUCTURAL SURFACES THAT HAVE BEEN DRILLEDOR WELDED.F.THERE SHALL NOT BE MORE THAN THE EQUIVALENT OF THREE QUARTER BENDS(270 DEGREES TOTAL) BETWEEN PULL POINTS, FOR EXAMPLE CONDUIT BODIES,JUNCTION BOXES (ABOVE GRADE WIRING), OR HAND HOLES (UNDERGROUNDWIRING.)G.UTILITIES AND LOCATIONS SHOWN ARE NOT SURVEYED, THE CONTRACTOR ISRESPONSIBLE FOR ALL LOCATES FOR THIS PROJECT AND FOR PROTECTINGEXISTING UNDERGROUND UTILITIES.H.CONTRACTOR TO COORDINATE ALL UTILITY WORK. OWNER TO PAY ALLASSOCIATED UTILITY FEES FOR THE UTILITY WORK.EXST SCADA PANELNOR-101NEW FLOW METERREMOTE TRANSMITTERSEXST BUILDINGSEE E-4MCC-01NEW 320A UTILITY METER,METER BASE BY CONTRACTOR,METER BY UTILITYEXHAUST THIMBLEGEN EXHAUSTFUEL FILLNEW AIR GAP PANEL,SEE DETAIL ON E-8NEW GENERATOR ROOM,SEE E-5ATS-0110KVA TX-01AND LP-01COMBO UNITP-100-1-3LAG PUMP**P-100-1-2LEAD PUMP**P-100-1-1DUTY PUMP**WETWELL,SEE E-6RELOCATED INDOORGENERATORNEW INTAKELOUVERNEW INTAKELOUVERUTILITY POWERFUEL TANK VENTTOMCC-01TONOR-101RELOCATED ANTENNA, COORDINATEEXACT PLACEMENT AND AIMING OFANTENNA WITH OWNER.NEW UTILITY TRANSFORMER(SCHEMATIC LOCATION)SEE OVERALL SITE PLAN FORACTUAL LOCATION - SHEET C-505/29/2025TONOR-101TRANSFORMER 10'HOT-STICK KEEP OUT AREANEW SE RATED DISCONNECTSWITCH, SW-01