A. VERIFY THE LOCATION OF THERMOSTATS AND SENSORS wI7H 7HE
ARCHITECTAND ENGINEER PRIOR TO INSTALLATION.INSTALL
THERMOSTATS 48"ABOVE FINISHED FLOOR PER ADA REQU IREM ENTS.
B. PROVIDE AND INSTALL SEISMIC BRACING FOR EQUIPMENT,DUCTWORK AND
PIPING PER THE RE�UIREMENTS OF THE CURRENTLY ADOPTED
INTERNATIONAL BUILDING CODE.
Q FLEXIBLE DUCTWORK BETWEEN BRANCH DUCTS AND GRILLES,REGISTERS,
OR DIFFUSERS SHALL BE LIMITED TO 5 FT.FLEXIBLE DUCT SHALL NOT BE
USED IN PLACE OF ELBOW S.
D. PROVIDE AND INSTALL FIRE,SMOKE,OR COMBINATION FIRE/SMOKE
DAMPERS WHERE DUCTWORK PASSES THROUGH RATED ASSEMBLIES.
ASSOCIATED DUCT DETECTORS SHALL BE ADDRESSABLE.SMOKE DAMPERS
AND COMBINATION SMOKE/FIRE DAMPERS SHALL WCLUDE A KEYED
\ REMOTE TEST SW ITCH LOCATED IN AN ACCESSIBLE LOCATION.FIELD
COORDINATE THE LOCATION OF TEST SWITCHES W ITH THE ARCHITECT AND
ENGINEER PRIOR TO INSTALLATION.
E. SEAL�UCT AND PIPE PENETR4TION5 THROUGH FIRE RATED ASSEMBLIES
��.2,; �,..�6'.,., W I7H A UL-APPROVEo FIRE STOP SYSTEM.
� F. MAINTAIN THE INTEGRITV OF DRAFTSTOPPING WHERE DUCTWORK AND
I PIPING PENETRATE DRAFTSTOPPING MATERIALS.
G. PROVIOE ACCESS DOORS TO ALLOW SERVICE AND INSPECTION OF
� ��. �________ _ EQUIPMENT,VALVES,DAMPERS AND DEVICES INSTALLED IN INACCESSIBLE
___".t
LOCATIONS.COORDINATE SUCH INSTALLATIONS WITH THE ARCHITECT AND
3/4"NG-------------------------------------5 2"FUEL FILL LWE ; ENGWEER.
� ' H. DUCTWORKDIMENSIONSINDICATETHECLEARWIDTHMEIGHTANDHAVE
� � NOT BEEN INCREASED TO ACCOMMODATE DUCT LMER.INSTALLED DUCT
� 3\
� SHALL BE INCREASED TO ACCOMMODATE LWER THICKNESS WHERE LWER
�H_3 � EF-2 IS INDICATED IN THE DRAWINGS OR SPECIFICATIONS.
,.."�., I. EXPOSED DUCTWORK TO BE HOT DIPPED GALVANIZED STEEL AND PAINTED
' � CD 2A �, ' PER ARCHITECTURAL CONTRACTOR TO CLEAN AND DRY DUCTWORK PRIOR
; -L—___—,—I
, UH-2 �-- �.. , - . TO PAINTING.
I �---- -'� � CD_28 �..`� I J. GAS PIPING TO BE WELDED IN CONCEALED SPACES.
I t----------------- -----------------1k K. PIPING SHALL BE IDENTIFIED WITH PIPE LABELS MARKED AT A MAXIMUM OF
� ` EVERY 25 FT.VALVES SHALL BE IDENTIFIED WITH BRASS OR ALUMINUM
� ��� � C��CD-3 VALVETAG9.
� ------°-` ' "--'-- L PROVIDE AND INSTALL PIPE GUIDES,EXPANSION JOINTS,AND HANGERS PER
e O I! � MANUFACTURER'S RECOMMENDATIONS.
, M.PIPING WALL PENETRATIONS SHALL SHALL BE FINISHED WITH A CHROME
�I /2�� ESCUTCHEON PLATE.
, � ��_Z N. MINIMUM TERMINAL DEVICE BRANCH PIPE SIZE IS 3/4"m UNLESS OTHERWISE
-�, �'�H3% - NOTED.
� �------ ��'� o • O. PROVIDE HIGH POINT AIR VENTS,LOW POINT DRAINS(WITH CAPPED HOSE
T� CONNECTIONS),AND SLOPE PIPING AS NECESSARY TO ALLOW FOR
/;d COMPLETE DRAINAGE OF THE HYDRONIC SYSTEMS.
�] �IUC-1 ' ______z_. -- _
�- � 4���
I ,,,� _ ;_ _�'��, _ � ��� KEY NOTES:
�
� r-� �� 1. RELOCATED GEN SET AND ASSOCIATED EXHAUST SYSTEM,FUEL PIPE
_�
�� '�-------� VENTS,AND FUEL LINE.
�' � 5� 2. FACTORY Sl1PPLIED HORIZONTAL SEPARATED-COMBUSTION CONVERSION.
�� �H„ ; 3. RELOCATED CRITICAL CLASS MUFFLER AND 1-1/2'0 WEL0.0.LET W/
� CONDENSATE LEG AND 3/4"S.S.DRAIN VALVE,SPILL TO FLOOR.
', 4. 4"0 STAMLESS STEEL FLEX PIPE.INSULATE MUFFLER AND INTERIOR
EXHAUST PIPING.
5. SHEET METAL CONNECTIONS ON RADIATOR COWLING SHALL BE BOLTED
(El UH"1 TYPE JOINING SYSTEM SIMILAR AND EQUAL TO DUCT-MATE.
6. RELOCATED FUEL FILL SLEEVE 2"0 FUEL FILL LINE THROUGH WALL.
(El EF 1 7. 2"0 VENT,SLEEVE THROUGH WALL.
0 -
(EIEH-1 ��H��
� ��
r � '
(E)3/4"NG� � -� CD-4
,!y vk-___3/4"NG.______________TF,_________________""'___________________________________"""'__________________________"""'__ �
.__
�� }' � , (E)GD-�A (EILV_l LV-3
� ----i� cY���a iE�Co-1s ��. ..
��`�HVAC PLAN
1 ,�2��_,�_���
'z
�
�
� AGENCY REVIEW (REVISION 2)
JUNE 2025
veaiFv scn�et REVISIONS ,.•"N T�q'• DRAWN BY: CMH PROJECT NUMBER
THESEPRINTSMAVBE NO. OESCRIPTION BY �ATE :�O �•� �9q DSGN.BY: CMH 10678.001
Morrison ;* JOSEPHR *� SHEETNUMBER
`s ��' . NORTON RANCH LIFT STATION UPGRADES
m Reouceo.uNe se�ow v 2880 Technology Blvd West •
o MEoriiclNn�oaawMc�N ■■ Bozeman,MT 59718 BOZEMAN MONTANA 3s
GH S APPR.BY: JRH
� � �► �-o No.41135 PEf��; DRAWING NUMBER
8 - M a i e r I e .� � �. DATE: O6/2025
MODIFvscn�encmRoiNc�n '� www.m-m.net �5,�-c �/CENSEf\2�? Q�C.REVIEW HVAC PLAN
o engineers surveyors planners scientists tiF,g G f BY: JRH H-5
Q
PLOTTEDON:6/4/20251�.55�.0]PM COf'YRIGHT OO MORRISON�MHi�.-Hi F ~ti,���NA�JN'f DATE�. 1I27I2025