A. LOCATIONS AND DIMENSIONS OF EXISTING FACILITIES IDENTIFIED ON THIS
oRAW ING ARE APPROXIMATE AND REPRESENT THE BEST AVAILABLE
INFORMATION BASED ON A COMBINATION OF FIELD INVESTIGATIONS AND
VARIOU S DESIGN AND RECORD DRAW INGS AVAILABLE AT THE TIME OF THE
oESIGN.RELD VERIFY LOCATIONS AND DIMENSIONS PRIOR TO AND DURING
PERFORMANCE OF THE WORK.PROVIDE DEMOLITION WORK NECESSARY TO
COMPLETE THE SCOPE OUTLINED IN THE CONSTRUCTION DOCUMENTS.
B. EXIS7ING MECHANICAL EQUIPMENT,DUCTWORK,AND PIPING SHOWN AS
DARK AND DASHED SHALL BE DEMOLISHED.EXISTING MECHANICAL
EQUIPMENT,DUCTWORK,AND PIPING SHOWN LIGHT SHALL REMAIN
UNCHANGED.
C.THE MECHANICAL CONTRACTOR SHALL COORDINATE SALVAGE OF
REMOVED EQUIPMENT IN GOOD CONDITION WITH THE OWNER.THE
MECHANICAL CONTRACTOR SHALL DISPOSE OF UNWANTED EQUIPMENT.
D. COORDINATE UTILIN OUTAGES W ITH THE GENERAL CONTRACTOR
THROUGHOUT THE DURATION OF CONSTRUCTION.NOTIFICATION MUST BE
GIVEN TO THE OWNER AT LEAST A WEEK PRIOR TO ANY PLANNED OUTAGES.
E. COORDINATE W ITH THE GENERAL CONTR4CTOR TO PATCH AND REPAIR
ROOF,WALL,CEILWG,OR FLOOR PENETRATIONS ASSOCIATED WITH THE
DEMOLITION OF THE EXISTING MECHANICAL SYSTEMS.
00
#; KEY NOTES:
� 1. DEMOLISH OUTSIDE AIR LOWER.COORDINATE EXTENTS OF DEMOLITION
WITH NEW WORK.
2. DEMOLISH DUCTWORK FROM GENERATOft CONNECTION TO LOUVER
� CONTROL DAMPERS.EXISTING LOUVER AND DAMPERS ADJACENT TO
LOWER TO REMAIN FOR REUSE.
�� ��, , 3. GEN SET AND ASSOCIATED EXHAUST SYSTEM,FUEL PIPE VENTS,AND FUEL
/� i LINE TO BE RELOCATED.COORDINATE EXTENTS OF DEMO AND RELOCATION
� O ��"� ���� ���I WITH NEW WORK.
�ir'
' fDl LV � �,✓�I 4 (E)LV4 AND A990CIATED CONTROL DAMPERS TO REMAIN.
�p . � ��i i � ' I 5. EXISTING TSTAT TO REMAIN.COORDINATE EXTENTS OF SYSTEM
;✓'�, MODIFICATION WITH NEW CONTROLS DETAIL.
��e � I�i�i � '��'�, 6. EXISTING CRITICAL CLASS MUFFLER AND 1-1/2'0 WELD-O-LET W/
� '� CONDENSATE LEG AND 3/4"S.S.DRAIN VALVE TO BE SAVED AND REUSED IN
�Y�I NEW CONSTRUCTION.COORDINATE EXTENTS OF DEMOLITION AROUND
j''�J ' -�i'�i -�� MUFFLER WITH NEW WORK.
'�:-__.�i il
� y
� i f �y $���
�T�'�P�p�i I��
��;t t=`�'�7����E
I� ':,r�:vd; �-�
�� �
(E1 E F-1 i i�.�S."�-��.F����.�I
- �� 0 -�i�T'T_�_uT.,__��,.�I
I --IJ�'� 'i I���
� r �
--� i—=- „is,. _1�_���
L_1_— 1 i Fa�p�_--- --�1
(gj i ..r �2,, LL-
o � � , _----_-__--_--o �0 0
r, � ________
4
' HVAC DEMOLITION PLAN
� ' ,�z =,._o.
z
�
�
� AGENCY REVIEW (REVISION 2)
JUNE 2025
veaiFv scn�et REVISIONS ,.•"N T�q'• DRAWN BY: CMH PROJECT NUMBER
THESEPRINTSMAVBE NO. OESCRIPTION BY �ATE :�O �•� �9q DSGN.BY: CMH 10678.001
Morrison ;* JOSEPHR *� SHEETNUMBER
`s ��' . NORTON RANCH LIFT STATION UPGRADES
m Reouceo.uNe se�ow v 2880 Technology Blvd West •
o MEoriiclNn�oaawMc�N ■■ Bozeman,MT 59718 BOZEMAN MONTANA 3�
GH S APPR.BY: JRH
� � �► �-o No.41135 PE���; DRAWING NUMBER
8 — M a i e r I e .� � �. DATE: O6/2025
MooiFvscn�encmRoiNc�v ^�1' www.m-m.net 's,�-c �/CENSE;/\2`"? QC.REVIEW HVAC DEMOLITION PLAN
o engineers surveyors planners scientists tiF,g G f BY: JRH H-4
Q
PLOTTEDON:529I20253�.2]:28PM CO�vRIGHTOMORRI50N�Mni�.-viF�u�3 ~ti•..�NA��'�•f DATE�. 1I27I2025