Loading...
HomeMy WebLinkAbout036 - H-3 - HVAC DETAILS CONTROL DRAWING LEGEND �` g�,�o,N�WA�� -LV3 � LV-2-. maEa co sn /�_ CAULK ALL AROUND TO O FAN �� SUPPORT WI7H STEEL�� MAKE WEATHER TIGHT DAMPER WITH ACTUATOR ANGLE AS NEEDED OUTSIOE AIR � � � onMaEaco-a � -. HEAD SECTION(JAMB SIMILAR) ANCHOR SECURELY TO WALL ► EXHAUSTAIR GENERATOR BIRDSCREEN � 1" CONSTRUCTION � VARIABLE TEMPERATURE FREQUENCY n , oaMaeacoa rn 0 DRIVE v SENSOR i f EXTRUDEDALUM.OR IMMERSION TVPE �i CAULK / .- GALV.STEELLOUVER MODULATING 2-WAY �-'��- "- 7 M CONTROLVALVE M onmveacoze \ �� (SEESPECIFICATIONS) DUCTTEMPERATURE � WITH T��O ROOMTHERMOSTAT ��� //� � SENSOR-SWGLE ACTUATOR ------ --.-�----- SHEET METAL� � �/ POINT MODULATING3-WAY ' SLEEVE \� .- SILLEXTENSION � CONTROL VALVE �H 2 120V' � � WITH SUPPLY � � ACTUATOR CONTROLLER EF-2 - TILT DUCT AND MOTORIZED DAMPER DUCTTEMPERATURE . SENSOR- 0 UC-1 MOT�ORIIONINTERLOCK / SLIGHTLYFORDRAINAGE AVERAGING V-NG / ELEMENT PUMP WITH EXHAUSTFAN MANUALRE-SET � M FREEZE � ` wA�� ---`�..LOUVER WITH CONTROL DAMPER DETAIL STAT I� COIL '���� % N T.S. SEQUENCE OF OPERATION FOR NEW DIESEL/GENERATOR ROOM: � WHEN DIESEL GENERATOR IS RUNNING: _ a DUCTPRESSURESENSOR THERMOSTAT MANUAL RESET HIGH O ENABLING SIGNAL FOR DIESEL/GENERATOR START SHALL CAUSE CONTROL oAMPERS CD-2A,CD-2B,AND CD-4 TO GO FULL SUSPEND FROM LIMIT ^ OUTSIDE AIR OPEN.CONTROL DAMPER CD-3 SHALL REMAIN CLOSED. ABOVE7URE � TEMPERATURE HEATING: —THREADED SUPPORT RODS � , SENSOR CONTROL DAMPER CD-2A SHALL MODULATE FROM 100%OPEN TO 100%CLOSED AND CONTROL DAMPER CD-3 SHALL i f I DUCT STATIC — PRESSURE MODULATE FROM 100%CLOSED TO 100%OPEN TO MAINTAIN HEATING SETPOINT.CONTROL DAMPER CD-2B SHALL REMAIN FACTORY SUPPLIED �. SENSOR O TEMPERATURE SENSOR 100%OPEN. SEPAR4TED COMBl15T10N TERMINAL KIT COOLING: � FILTER FLOOR SLAB CONTROL DAMPERS CDQAAND CD-2B SHALL MODULATE OPEN AND CONTROL DAMPER Co3 SHALL MODULATE CLOSED TO �'� DIFFERENTIAL O TEMPERATURE MAIN7AIN COOLING SETPOINT. PRESSURE SENSOR SENSOR —GAS SUPPLY WHEN DIESEL GENERATOR IS OFF: H HUMIDISTAT �,��� NG i � GAS-FIRED UNIT � � � ❑ THERMOSTAT(T2)SATISFIED:ALL CONTROL DAMPERS SHALL BE FULLY CLOSED. I i HEATER DUCT SMOKE DETECTOR � WALL MOUNTED HEATING: GAS COCK � �c CO2 UNIT HEATER UH-2 SHALL OPERATE TO MAINTAIN HEATMG SETPOINT. ���--' SENSOR FLEX PIPE � COOLING: � DUCT MOUNTED CURRENT CONTROL DAMPER CD-4 SHALL GO FULLY OPEN AND EXHAUST FAN EF-1 SHALL RUN TO MAINTAIN COOLING SETPOINT. DIRT LEG � NOTE: CO2 TRANSDUCER MAINTAIN CLEARANCE FROM COMBUSTIBLES SENSOR NOTES: PER MANUFACTURERSRECOMMENDATIONS � INITIAL THERMOSTAT COOLING SETPOINT SHALL BE 85"F AND INITIAL HEATING SETPOINT SHALL BE 60�F.PROVIDE CONTROL CONTROLLEDASNOTEDINABOVECONTROLSEQUENCE. �qF AIR FLOW RELAY MEASURING o STATION MAN�A�SW�T�H ;' --��'��,CONTROLS- NEW DIESEUGENERATOR ROOM '"�O---�'��•.,UNIT HEATER DETAIL � � � / N.T.S. '� `� I N.T.S. DEFINITIONS: �� AI = ANALOG INPUT AO = ANALOG OUTPUT BI = BINARY INPUT BO = BINARY OUTPUT AV = ANALOG VALUE BV = BINARY VALUE —EXTEND THIMBLE ADJ = ADJUSTABLE 9"BEYOND WALL SCH. = SCHEDULE FLASH UP SIDES OF THIMBLE THIMBLE SHALL BE 12" TRD. = TREND MINIMUM 1/8"WELDED �RGER IN DIAMETER ALM. = ALARM STAINLESS STEELCLAMP STEELTHIMBLE THAN EXAUSTPIPE DISP. = DISPLAY ' MOD = MOTOR OPERATED DAMPER � �= �: EXHAUST PIPE— � � PIPE MSULATION MODIFIED SEQUENCE OF OPERATION FOR EXISTING DIESEL/GENERATOR ROOM �-- THERMOSTATlT11 SATISFIED: �� EXHAUST PIPE ALLCONTROLDAMPERS SHALLBE FULLY CLOSED. - - ----- - - - - -- �� '_-.: HEATING: �- ��_1 -_- UNIT HEATERS EH-1 AND UH-1 SHALL OPERATE TO MAINTAIN HEATMG SETPOINT. 1"VENTILATION _ _____ _ _ _ _ __ � HOLES IN TOP AND CONTROL DAMPERS(E)CD-1A AND(E)CD-1B SHALL GO FULLY OPEN AND EXHAl15T FAN EF-1 SHALL RUN TO MAINTAIN PIPE INSULATION �� � (_; ,') � BOTTOM PLATES � COOLING SETPOINT. SPACERS `� � � � �. —EXHAUSTPIPE 1/4"X6"LONG NOTES: / _�� � `, STEELSPACERS INITIAL THERMOSTAT COOLING SETPOINT SHALL BE 85°F AND INITIAL HEATING SETPOINT SHALL BE 60°F. EXTEND THIMBLE ;�'� �-a " ���—PIPE WSULATION WELDED TO 9"BEYOND WALL � �,-<��� EXAUST PIPE -.,..- � ESCUTCHEON 'z � - CONTROLS- EXISTING DIESEUGENERATOR ROOM -'•GENERATOR EXHAUST WALL THIMBLE DETAIL ��4 i N.T.S. � 5 i N.T.S. � � � AGENCY REVIEW (REVISION 2) JUNE 2025 veaiFv scn�et REVISIONS ,.•"N T�q'• DRAWN BY: CMH PROJECT NUMBER THESEPRINTSMAVBE NO. OESCRIPTION BY �ATE :�O �•� �9q DSGN.BY: CMH 10678.001 Morrison ;* JOSEPHR *� SHEETNUMBER `s ��' . NORTON RANCH LIFT STATION UPGRADES m Reouceo.uNe se�ow v 2880 Technology Blvd West • o MEoriiclNn�oaawMc�N ■■ Bozeman,MT 59718 BOZEMAN MONTANA 3s GH S APPR.BY: JRH � � �► �-o No.41135 PEf��; DRAWING NUMBER 8 — M a i e r I e .� � �. DATE: O6/2025 MODIFvscn�encmRoiNc�n '� www.m-m.net �5,�-c �/CENSEf\2�? Q�C.REVIEW HVACDETAILS o engineers surveyors planners scientists tiF,g G f BY: JRH H-3 Q PLOTTEDON:529I20253�.2]:03PM CO�vRIGHTOMORRI50N�Mni�.-viF�u�3 ~ti•..�NA��'�•f DATE�. 1I27I2025