HomeMy WebLinkAbout031 - M-3 - LIFT STN SECT & DTLS FORCE MAIN INTERCONNECT AIRIVACUUM RELIEF VALVE TAPPED INTO TEE
PRESSURE GAUGE (NOT NORMALLY USED) AIRIVACUUM RELIEF VALVE 6"90�BEND
(0-100 PSI) (RELIEF LINE PIPED TO EXST FLOOR DRAIN) (RELIEF LME PIPED TO AIRIVACUUM RELIEF VALVE
EXST FLOOR DRAIN)
I I I PRESSURE GAUGE
6"90°BEND 6"SS P 6"TEE 6"90°BEND
6"CROSS (0-100 PSp (BEYOND)
6"SSP
6"90°BEN�
NEW MANIFOLD=4788.44 NEW MANIFOLD=4788.44
6"90�BEND PIPE STAND(TYP.)
6"ROW
6"90°BEND 6"90°BEND O O
EXISTING 6"EXTERIOR 6"V405 METER
- 6"V405 6"V405 BYPASS CONNECTION CONNECT TO EXST PIPING FE/FI
NORMALLY CLOSED (PRESERVE)� (NORMALLY CLOSED) 100_2. 6"90°BEND
EXST.MANIFOLD=4785.77 O O EXST.MANIFOLD=4785.77 �
�
CONNECTTOEXST6" 3-716� 2'-S"
6"V405
OUTLET PIPE
�-�i 6��
FF=4783.14 FF=4783.14
� � I I I I I I I I EXST BLDG FOUNDATION(TYP.) EXST BLDG . �I I� .�
EXST BLDG " � � CONCRETE PIPE I I I I I I FOUNDATION(TYP.)� ' I I-'�
FOUNDATION(TYP.) I I ENCASEMENT(TYP.) I I I I I I ��I I. EXISTING 4"PIPING
-:I I �SEE DETAIL 3014 i II i �I II ��� ��- (PLUG AND ABANDON IN PLACE
I I ` i i �� �� PER SPEGFICATIONS)
',� �
� � � � ,
� � �t��� ��,t��, ���t��� ! ��� � �
� � � � � � � � � .
� � � � � � � �
FLEXIBLE �� I -� I I I I I I I �
COUPLING .I I: , , I I I I I I �. ` I I ��
NEW 6"PIPING � I I 6"90°BEND I I I I I I CONCRETE PIPE - I I
DISCHARGE TO 8" ��I I (MJ X MJ) I I I I I ENCASEMENT(TYP.) �-I I'� �
FORCE MAW .� � I I I I I I I I SEE DETAIL 3014� -�I I
I I I I I EXST 6"FORCE MAIN I I
� , I I I I I I I �DISCHARGE NEW YARD PIPING=4775.50 -���,,�
—— ——— � � �—
�❑� r_ �I—�I�J� � �..-� ��� /�--� �—�1iL-- _ --� :.�\��.
�--- w�--- ' � � � � ` � ���j
-- , . , � / �- ---�
1'MIN �� � �� EXSTPIPWG-4775.15
EXST 6"INLET PIPING�' EXST 6"INLET PIPING
FROM WET WELL FROM WET WELL (CONTRACTOR TO VERIFY)
�A� SECTION �B� SECTION
SCALE:1"=2' SCALE:1"=2'
AIR/VACUUM RELIEF VALVE pRESSURE GAUGE(0-100 PSI)
(RELIEF LINE PIPED TO EXST FLOOR DRAIN)
6"90�BEND
PRESSURE GAUGE
6"90°BEN� 6"SS P (0-100 PSI)
EXST GATE VALVE
NEW MANIFOLD=4788.44
PIPE STAND(TYP.)O EXST SWING CHECK VALVE
GENERALNOTES
6"FLOW METER 2 1.ALL MANIFOLD PIPING AND FITTINGS SHALL BE PER PROJECT
O SPEGFICATIONS,UNLESS OTHERWISE NOTED.
6"90°BEND FEIFI EXST PRESSURE GAUGE 2.SOME ITEMS LOCATED IN THE BACKGROUND OF SECTION VIEWS
100-1♦ WERE OMITTED FOR CLARITY.
EXST.MANIFOLD=4785.77 3.VALVES SHOWN ARE NORMALLY OPEN UNLESS OTHERWISE
0 � INDICATE�.
EXST 90°FITTING(TYP.)
3�_Z"
� coNNecrroexsr KEY NOTES
0 6"OUTLET PIPE
15 1O PROVIDE STANDON MODEL C92 ADJUSTABLE PIPE SADDLE CLAMP
_ �-��g�
SUPPORT FOR 6"DIP.SUPPORT SHALL BE CLAMPE�AROUND
FF=4783.14 THE ENTIRE PIPE AND SECURED TO THE FLOOR VIA THE HOLES IN
THE BASE PLATE.
W� 2 FLOW METER SHALL BE BADGER ELECTROMAGENTIC FLOW
1 I I I I EXST BLDG FOUNDATION(TYP.) O
N I I METER MODEL M5000 WOTH 6"FLANGED CONNECTIONS. REFER
o I EXISTING 4"PIPING I I TO ELECTRICAL FOR CONNECTION TO CONTROLS.
F (PLUG AND ABANDON IN PLACE
LL PER SPECIFICATIONS) �I I I ENSURE THAT THE STRAIGHT PIPING REQUIREMENT UPSTREAM
I�I AND DOWNSTREAM OF THE FLOW METER MEET MANUFACTURER
RECOMMENDATIONS.
� I
` I I I
a I I I
� I I I
' I I I
II II II EXST 6"SS P INLET
� I I I PIPING FROM WET
z �WELL
0 I
¢ Fi-i= �y—� E i�
y
EXSTPIPING-4775.15 ���� ���� , I�I �
LL
� (CONTRACTOR TO VERIFY) � �L
---- _--_
z �EXST 6"FORCE MAIN � � 0 � 4
q� DISCHARGE
SCALEINFEET
� �� SECTION AGENCY REVIEW (REVISION 2)
_ scn�er�=r JUNE2025
J REVISIONS
J veaiFv SCn�e�. DRAWN BY: KJS PROJECT NUMBER
� _,al�'�A�J �>>
NO. DESCRIPTION BY DATE y' --C�` � �� 10678.001
mesePrzmrsnnnvserzeouceo. MOI �ISO� � 2880TechnologyBlvdWest DSGN.BY: LRH NORTONRANCHLIFTSTATIONUPGRADES
a LINE BELOW MEASURES ONE INCH ■■ �^� ����
oN orziciNn�oanwiNc. � Bozeman,MT 59718 , qppR.BY: LRH SHEET NUMBER
,� BOZEMAN MONTANA 3�
�--F � M a i e r I e 406 58�0�2, �A W.
� No.48 6 PE=J DATE: O6/2025 DRAWWG NUMBER
�'r� q o/zv/zozs
MooiFvscn�enccoaowc�v� � www.m-m.net ��ssp��57EREo�G� q.C.REVIEW LIFT STATION SECTIONS&DETAILS M��
engineers surveyors planners scientists ��'4�ONAL`�` BY�
a PLOTTED BV:LEE HAGEMAN ON JUN04/2025 COPVRiGHT�OMORRISON-MAIERLE,2025 DATE: