Loading...
HomeMy WebLinkAbout025 - S-5 -N & S ELEVSA S-6NEWCONSTRUCTIONEXISTINGCONSTRUCTION 9'-0"4'-8" 4"TOP OF FOUNDATIONWALLTOP OF SLAB4'-0"8"NOTES1.CANEXEL SIDING COLOR AND PATTERNTO BE VERIFIED W/ OWNER PRIOR TOINSTALLATION.5S-74S-76S-7PRESERVE EXST. LOUVRE FOR BUIDINGVENTILATION (SEE HVAC SHEETS)WEAVE AND STAGGERSHINGLES TO MATCHEXISTINGGENERATOREXHAUSTLOUVRE (SIZE PER HVAC DRAWINGS)INSTALL (2) KING STUDS AND(1) JACK STUD (EACH SIDE)HEADER (3) - 2x6 (1/2)PLYWOOD SPACERSSEE DETAIL 4 ON S-8GAS TANK VENT WITHVENTED CAPSTAGGER SIDING JOINTS TOMATCH EXISTINGEXISTINGCONSTRUCTIONNEWCONSTRUCTION9'-0"4'-8"4"TOP OF FOUNDATIONWALLTOP OF SLAB4'-0"8" A S-66S-74S-7DOUBLE DOORSEE DETAIL 3 ON S-8INSTALL (2) KING STUDS AND (1)JACK STUD (EACH SIDE)WEAVE AND STAGGERSHINGLES TO MATCHEXISTINGSTAGGER SIDING JOINTS TOMATCH EXISTINGFUEL FILL W/ CAPGENERATOREXHAUSTGAS TANK VENT WITHVENTED CAPEXHAUST FANHEATER EXHAUSTVERIFY SCALE!THESE PRINTS MAY BE REDUCED.LINE BELOW MEASURES ONE INCHON ORIGINAL DRAWING. MODIFY SCALE ACCORDINGLY!2025COPYRIGHT © MORRISON-MAIERLE,SHEET NUMBERPROJECT NUMBERDRAWING NUMBERDATEDESCRIPTIONNO.BYP:\10678-LAUREL PARKWAY LLC\001 - NORTON RANCH LIFT STATION\ACAD\SHEETS\2-STRUCTURAL\S-X_STRUCTURALPLANS&DETAILS.DWGREVISIONS DRAWN BY:DSGN. BY:APPR. BY:DATE:Q.C. REVIEWDATE:BY:2880 Technology Blvd WestBozeman, MT 59718406.587.0721www.m-m.netengineers surveyors planners scientistsMorrisonMaierlePLOTTED BY:LEE HAGEMAN ON Jun/04/2025 NORTON RANCH LIFT STATION UPGRADES BOZEMANMONTANANORTH AND SOUTH ELEVATIONS10678.00125S-5KJSLRHLRH06/2025 24120SCALE IN FEETAGENCY REVIEW (REVISION 2)JUNE 20252NORTH ELEVATION VIEWSCALE: 1"=2'1SOUTH ELEVATION VIEWSCALE: 1"=2'KEY NOTESCONTRACTOR SHALL PROVIDE SAMECOLOR AND ROOFING TYPE. WEAVEPROPOSED MATERIALS INTO EXISTING.WATERPROOFING MATERIALS ON ROOFSHALL BE LAPPED FROM BOTTOM TOTOP FOR WATER SHEDDING.WATER RESISTANT BARRIER SHALL BELAPPED ONTO EXISTING WITHVERTICAL SEAMS TAPED.= EXISTING1NOTE: HEADER (3) - 2x6 (1/2)LINTEL SIZENO. OF TRIMMERS UNDEREACH END OF LINTELNO. OF FULL HEIGHT WALLSTUDS EACH SIDE OF OPENING2305/29/2025E13121312EEE24120SCALE IN FEETBUILDING NOTES1.PAINT ALL DOOR AND WINDOW FRAMES. COLOR TO BE VERIFIED BYOWNER AND MATCH EXISTING MATERIALS.2.ALL WINDOWS AND DOORS SHALL BE OF METAL CONSTRUCTIONWITH THE MANUFACTURER PROVIDING ALL LOCKSETS, THRESHOLDS,CLOSERS, WEATHERSTRIPPING/FLASHING, CAULKING, TRIM, AND ALLOTHER INCIDENTAL ITEMS NECESSARY FOR PROPER INSTALLATION.3.ALL KEYING OF DOORS SHALL BE AS PER THE OWNER'SPREFERENCE.GENERAL NOTES1.THE CONTRACTOR SHALL TRIM ALL WINDOWS DOORS, LOUVRES,ETC. TO MATCH THE EXISTING BUILDING.6.26'