Loading...
HomeMy WebLinkAbout025 - S-5 -N & S ELEVS GAS TANK VENT WITH O PRESERVE EXST.LOUVRE FOR BUIDING VENTED CAP E VENTILATION(SEEHVACSHEETS) BUILDING NOTES —` � � � I I I I I I I 1.PAINT ALL DOOR AND WINDOW FRAMES.COLOR TO BE VERIFIED BY OWNER AND MATCH EXISTING MATERIALS. WEAVE AND STAGGER SHINGLES TO MATCH 5 2 ALL WINDOWS AND DOORS SHALL BE OF METAL CONSTRUCTION STAGGER SIDING JOINTS TO EXISTING iO 2O WITH THE MANUFACTURER PROVIDING ALL LOCKSETS,THRESHOLDS, MATCH EXISTING — — S� CLOSERS,WEATHERSTRIPPING/FLASHWG,CAULKWG,TRIM,AND ALL �OOO OTHER INCIDENTAL ITEMS NECESSARY FOR PROPER WSTALLATION. II I � � � ��� ��� � � L J 1 '—'��— — '�� —'— " � — J �— — 'J � —'—i1 � ' ' �� 3.ALL KEYING OF DOORS SHALL BE AS PER THE OWNER'S PREFERENCE. I I HEADER(3)-2x6(V2) PLYWOOD SPACERS I I I I I SEE DETAIL 4 ON S-8 LWTEL SIZE NO.OF TRIMMERS UNDER I I I I I �EACH END OF LMTEL I I I I I NOTE:HEADER(3�(1/2) I I I I I GENERATOR III II EXHAUST NO.OF FULL HEIGHT WALL I I I I I _ STUDS EACH SIDE OF OPENING 0 III II � III II in KEY NOTES LOUVRE(SIZE PER HVAC DRAWINGS) I I I I I 1O CONTRACTOR SHALL PROVIDE SAME I I I I I COLOR AND ROORNG TYPE.WEAVE PROPOSED MATERIALS INTO EXISTING. IIIIII II II IIIII O2 WATERPROOFING MATERIALS ON ROOF I I I I I I I I I I I I I�I INSTALL(2)KING STUDS AND SHALL BE LAPPED FROM BOTTOM TO I I I I I (�)�ACK STUD(EACH SIDE) TOP OF FOUNDATION . WALL a TOP FOR WATER SHEDDING. TOP OF SLAB O WATER RESISTANT BARRIER SHALL BE LAPPED ONTO EXISTING WITH 6 VERTICAL SEAMS TAPED. S-7 OE = EXISTING a n NOTES 4 0 1.CANEXELSIDINGCOLORANDPATTERN S-7 "v � GENERAL NOTES "v OTO BE VERIFIED W/OWNER PRIOR TO 1.THE CONTRACTOR SHALL TRIM ALL WINDOWS DOORS,LOUVRES, E EXISTING NEW INSTALLATION. CONSTRUCTION CONSTRUCTION ETC.TO MATCH THE EXISTING BUILDING. m 2 1 0 2 4 �� SOUTH ELEVATION VIEW SCALEINFEET SCALE 1"=2' GAS TANK VENT WITH VENTEDCAP I I � I I I I I � I WEAVE AND STAGGER �O ZO SHINGLES TO MATCH EXISTING il �� . . � �.—.— � � — —� � — � � _.— �� — —,�.—.— � .—.�,— — ��� �._ � � — � �_ — � � _.—.y � _ �� � I I I I III III III III I GENERATOR HEATER EXHAUST I I I I I I � EXHAUST I o STAGGER SIDING JOINTS TO I I I I I I MATCH EXISTING � EXHAUST FAN � O III III o � 61 626' I I I I I I I III ° III O I FUEL RLL W/CAP I I I I I I � I�II �I� � � � TOP OF FOUNDATION I I I I I I WALL I � TOP OF SLAB I I I I I I DOUBLEDOOR ¢ SEE DETAIL 3 ON S-8 g o g Q cq o � a S� � y � INSTALL(2)KING STUDS AND(1) 4 JACK STUD(EACH SIDE) NEW EXISTING EO S-7 CONSTRUCTION CONSTRUCTION 2 1 0 2 4 U �a SCALE IN FEET 0 � ° �� NORTH ELEVATION VIEW AGENCY REVIEW (REVISION 2) scn�e r�-r JUNE 2025 J REvisioNs ,,�b11�'Ai�a,, J veaiFv SCn�e�. DRAWN BY: KJS PROJECT NUMBER � NO. DESCRIPTION BY DATE y' _ �'i� 10678.001 mesePrzmrsnnnvserzeouceo. MOI �ISO� 2880Techno�o s��dwest DSGN.BY: LRH NORTONRANCHLIFTSTATIONUPGRADES auNE eE�ow MEnsurzEs oNE iNcn 9Y �� ��'�, SHEET NUMBER oNorziciNn�oanwiNc. ■■ � � Bozeman,MT 59718 (-o NATE J. �; APPR.BY: LRH gOZEMAN MONTANA Zs �� �A �� MENUEZ /� PY P � �� No.15739 PE _� DATE: O6/2025 DRAWWGNUMBER � 1 � 1��V 1 V � www,m-m.net �rF P o�z9�zozs� 4C.REVIEW MooiFvscn�enccoaowc�v� engineers surveyors planners scientists �'�,,ss���STER`���'= BY NORTH AND SOUTH ELEVATIONS c�� �i<<�NAL��.��� V a PLOTTED BV:LEE HAGEMAN ON JUN04/2025 COPVRiGHT�OMORRISON-MAIERLE,2025 DATE: