Loading...
HomeMy WebLinkAbout023 - S-3 - FOUNDATION PLANNEWCONSTRUCTION8" STEM WALL1'-6"x8" DEEP FOOTING1S-71S-820'-6"20'-0"16'-0" 4'-0"6'-0"DOUBLE DOOREXISTINGCONSTRUCTION3S-73S-7AS-6PROPOSED CONCRETE SLAB TOMATCH EXISTING SLAB ELEVATIONIN DOORWAY2x6 STUD WALL ON TOP OF 2x6 TREATED SILLPLATE W/ STUDS @ 16" O.C. AND DOUBLETOP PLATES (TYP.)MATCH EXISTING TOP OFSLAB ELEVATION10" REINFORCED SLABEXTERIOR SLAB(SEE CIVIL PLANS)2025COPYRIGHT © MORRISON-MAIERLE,SHEET NUMBERPROJECT NUMBERDRAWING NUMBERDATEDESCRIPTIONNO.BYP:\10678-LAUREL PARKWAY LLC\001 - NORTON RANCH LIFT STATION\ACAD\SHEETS\2-STRUCTURAL\S-X_STRUCTURALPLANS&DETAILS.DWGREVISIONS DRAWN BY:DSGN. BY:APPR. BY:DATE:Q.C. REVIEWDATE:BY:2880 Technology Blvd WestBozeman, MT 59718406.587.0721www.m-m.netengineers surveyors planners scientistsMorrisonMaierleVERIFY SCALE AND COLOR!THIS SHEET MAY BE REDUCED AND ISINTENDED TO BE IN COLOR. THE BARBELOW WILL MEASURE ONE INCH ATORIGINAL DESIGN SCALE AND RED,GREEN, AND BLUE WILL BE VISIBLE IFREPRODUCED CORRECTLY.MODIFY SCALE ACCORDINGLY!PLOTTED BY:LEE HAGEMAN ON Jun/04/2025 NORTON RANCH LIFT STATION UPGRADES BOZEMANMONTANAFOUNDATION PLAN10678.00123S-3KJSLRHLRH06/2025 24120SCALE IN FEETAGENCY REVIEW (REVISION 2)JUNE 20251FOUNDATION PLANSCALE: 1"=2'BUILDING NOTES1.PAINT ALL DOOR AND WINDOW FRAMES. COLOR TO BE VERIFIED BYOWNER.2.ALL WINDOWS AND DOORS SHALL BE OF METAL CONSTRUCTIONWITH THE MANUFACTURER PROVIDING ALL LOCKSETS, THRESHOLDS,CLOSERS, WEATHERSTRIPPING/FLASHING, CAULKING, TRIM, AND ALLOTHER INCIDENTAL ITEMS NECESSARY FOR PROPER INSTALLATION.3.ENSURE LOCKS ARE KEYED SAME AS EXISTING DOORWAY.4.PROVIDE DAMP PROOFING ON EXTERIOR SURFACE OF CONCRETEWALLS PER SECTION 07 11 13 OF THE PROJECT SPECIFICATIONS.05/29/2025KEY NOTE= EXISTINGKEY NOTE= EXISTINGEE