HomeMy WebLinkAbout022 - S-2 - STRL DEMO ELEVS �u���u���u���u���u���u���u���u�� — \ a4
/
II I �--� � —.—.�,— — ��� —._ .y � — � ,�— .�i y � —.—.y�i r-- �'— i — — — — —
III_---------- III �
BUILDING NOTES
I I I I DEMO GABLE
ROOF OVERHANG 1.PAINT ALL DOOR AND WINDOW FRAMES.COLOR
TO BE VERIFIED BY OWNER.
��� ���
2.ALL WINDOWS AND DOORS SHALL BE OF METAL
I I I I I CONSTRUCTION WITH THE MANUFACTURER
i PROVIDING ALL LOCKSETS,THRESHOLDS,
I I I � CLOSERS,WEATHERSTRIPPING/FLASHING,
� m CAULKING,TRIM,AND ALL OTHER INCIDENTAL
I I I ITEMS NECESSARY FOR PROPER INSTALLATION.
3.ALL KEYING OF DOORS SHALL BE AS PER THE
I I I OWNER'S PREFERENCE.
I I I�I TI LOUVRE TO REMAIN O
�I I I I I I I SEE HVAC
IIIIII II II I
�III II II III µj
I I I I I I I I I I I I I I I I TOP OF FOUNDATIONO
TOP OF FOUNDATION - WALL
� WALL O �I I I I I I I I I I� � TOP OF SLAB
TOP OF SLAB ��I I I I I I I I I I���
0
� a
= v a
0
' — — — — — �
�� SOUTH ELEVATION VIEW 2 ' ° 2 ° KEY NOTE
2 ' ° 2 4 �2� WEST ELEVATION VIEW OO =�ISTING
SCALE 1"=2' SCALE W FEET SCALE IN FEET SCALE:1"=2'
DEMO GABLE �RIDGE VENT(TYP.)OE
ROOFOVERHANG
12
44 REMOVE EXISTING SIDING
AND VAPOR BARRIER
_.—.��— — ��� —.— �� � — � ��— — ��� _.—.�� — �`. � . I . • - �
I � III /
I II
II III
O DOWNSPOUT
(TYP OF 4)� ��� i i�
0
DOUBLE DOOR OE o � I I � DEMO 48"x48"LOUVER,
o - L-2,AND REPLACE WITH
_ � �
DOOR
TRILOGY PADLOCK SYSTEM. O ' _
COORDINATE WITH BOZEMAN TI
ENSURE LOCK IS KEYED SAME I I I �
ASNEW DOORWAY O CONCRETE II I III
SPLASH BLOCK CONCRETE SPLASH
' II I BLOCK O
I��
¢ TOP OF FOUNDATIONO I I I
- WALL
� TOP OF SLAB
a _ — —
, DEMO 2x6 CRIPPLE WALL AND(2)2x6 DEMO FOUNDATION WALL
w TOP PLATES.INSTALL a'DIA.x 6" 6"BELOW FINISHED FLOOR
w EMBE�DED WE�GE ANCHOR BOLTS ELEVATION
7'-0"x4'-0"x4"
%' EO a EACH SIDE OF NEW DOOR OPENING.
U o CONCRETESLAB � �
3 � a �
o �
¢
� — — — _ '
UQ - OJ
K �
� 3 NORTH ELEVATION VIEW Z ' o Z 4 �� EAST ELEVATION V�E�w��.
° �� 2 ' ° 2 ' �Y REVIEW (REVISION 2)
SCALE:1"=2' SCALE IN FEET SCALE:1"=2'
SCALE IN FEET JUNE 2025
J veRiFvscn�enNoco�oR! REVISIONS l'�b�'j'q��' DRAWNBY: KJS PROJECTNUMBER
y� THIS SHEET MAV BE REOl10ED AND IS • �j'''���� 10678.001
�NTeNoeoToee�Nco�oR THEOAR NO. DESCRIPTION sv onTe M O I 1 I SO� DSGN.BY: LRH NORTON RANCH LIFT STATION UPGRADES
ee�owwa�mensuReoNeiNCHnr � 2880TechnologyBlvdWest �� �y'�� SHEETNUMBER
a ORIGINALDESIGNSCALEANDRED, ■■ �� Bozeman,MT 59718 (-o NATE J. �'; APPR.BY: LRH gOZEMAN MONTANA 2z
GREEN,ANO BLl1E WILL BE VISIBLE IF •
REPRODUCE�TLV. 4OS.5B7.O7Z'I i�J MENUEZ
� M a i e r e � %� No 15739 PE _� DATE O6/2025 DRAWWG NUMBER
� www.m-m.net �rF P o�z9�zozs� .. q_C.REVIEW
MooiF sca�enccoRON��v� engineers surveyors planners scientists �'�,,ss���STER`���'= BY STRUCTURAL DEMOLITION ELEVATIONS c��
�i<<�NAL��.��� V
a PLOTTED BV'.LEE HAGEMAN ON JUN04/2025 COPVRiGHT�OMORRISON-MAIERLE,2025 DATE: