HomeMy WebLinkAbout021 - S-1 - STRL DEMO PLAN 2x BEVELED BLOCKING ALTERNATING IN BETWEEN
TRUSS GAP LOCATIONS,NAILED THROUGH EACH O
SIDE OF TRUSSES(TYP.)
O PRE-ENGINEERED
PLATEDTRUSS
� � � � � � o
--- _=�—:� ___�_. �.-- � � � � _�
- • • • r --------1----------1------- --�
I N
' r ___L__________�_______" ______ __
I I �
I I �il I I I
il r_________ r I
� i r______�__________I_______ ________}_________�_________1__________�__________
I
I I
�I r------
� ' i I i i i i I
O DEMO LOUVER,L-2,AND I � I I I I I I
8��WIDE STEMWALL OE REPLACE WITH DOOR � �I � i i i I I I
O 1'-6"x8"DEEP FOOTING I I ' I I I DEMO OVERHANG FOR BUILDING
I I EXTENSION ROOF TIE-IN I
� I
� —_—I-T-� I I I I I
� � TOP OF SLAB� � � � i � � � � � � 3
I ELEV.=4783.14 I I i i i �
I I I ---� �- i
I I I I ��
I I I �
I I I - �� ' �
I I I '�
I I I � I � O I' I - -
I I I , E I I i �I F o 0
I I I I �I I � I CO N
I i I I j ' '�
FLOORPENETRATIONSOE I I I - I I i
(TYP.) I I OE RIDGE VENT i �i
I I —_— I i T_I_
� � I � �i I
� �
� � i
OE 10"THICKENED SLAB I I
I I 2x6 OUTLOOKERS @ 2'-0"O.C.OE I � li�l
�E FAN,EF-1 � � �i
� � I I � ii
O2x6 STUDWALL ON TOP OF 2x6 TREATED SILL O I • I _ I � �� _ II� I
PLATE WI STUDS @16 O.C.AND�OUBLE TOP� � I
i
PLATE(TYP.) _----- ------------------------------ _—� i I I I I I
i �
--------_ • _______ __________I L_________I �� ____� i
I —}---------�---------'-------- ----- -- -
�' � ' �
0 LOUVER,L-1�
20�_6,� `�---------- � � � �� o
�1� FOUNDATION DEMO PLAN Z ' ° Z 4 N
SCALE:1"=2' SCALE W FEET
O2 LAYERS OF NO.15 FELT PAPER AND HEAVY O a��CDX PLYWOOD SHEATH WG OVER
WEIGHT MODIFIED 3-TAB ASPHALT SHINGLE TRUSSES
OVER PLYWOOD-INSTALL PER
e'CDX PLYWOOD MANUFACTURER
HEAVY DUTY 3-TAB 20�-6��
ASPHALT SHINGLES
24,_6"
LINE OF DEMOLITION
2x6 BLOCKING BETWEEN
� OVERHANGJOISTS �2� ROOF FRAMING DEMO PLAN Z ' ° Z '
o RIDGE VENT
2x60UTLOOKERS
- 2 LAYERS OF 15 LB FELT PAPER SCALE:1"=2'
— �@ 2'-0"O.C. SCALE IN FEET
2X RIM BOARD SIMPSON U26
PRE-FINISHED METAL FLASHWG� JOIST HANGERS
DRIP EDGE FLASHING SIMPSON H1 PRE-ENGINEERED WOOD
SEISMIC TIE 2x6 BLOCKING @ 16" TRUSSES @ 2-0"O.C. KEY NOTE
PRE-FLASHING PERFORATED O.C.THIS TRUSS
METAL SOFFIT RE-ENGINEERED SPACE ONLY
GA LE DROP TRUSS OE =EXISTING
a
SIMPSON A34 ANCHORS @ 16"O.C. �q381NSULATION
(ATTACH GABLE DROP TRUSS TO STUD
WALL) e"GYPSUM BOARD
� CANEXEL VINYL SIDING COLOR AND 1 �—RNISHED CEILING
PATTERN SELECTED BY OWNER i ATTACH BLOCKING TO
W ADJACENTTRUSSES WITH
U 2'-0" L 6 MIL PE VAPOR BARRIER SIMPSON A35 ANCHORS
_�VINYL WALL FINISH
g i"CDX PLYWOOD
� ��6 MIL.PE VAPOR BARRIER
� INFILTRATION BARRIER
_�2x6 WOOD STUDWALL WI STUDS @ 16"O.C.
W/R-19 BATT INSULATION BETWEEN STUDS
_ �� OVERHANG DETAIL uNeoFoennourioN
�
0
SCALE:NTS
° AGENCY REVIEW (REVISION 2)
JUNE 2025
J veRiFvscn�enNoco�oR! REVISIONS l'�b�'j'q��' DRAWNBY: KJS PROJECTNUMBER
y� THIS SHEET MAV BE REOl10ED AND IS �j'''���� 10678.001
�NTeNoeoToee�Nco�oR THEOAR NO. DESCRIPTION sv onTe M O I 1 I SO� DSGN.BY: LRH NORTON RANCH LIFT STATION UPGRADES
ee�owwa�mensuReoNeiNCHnr � 2880TechnologyBlvdWest �� �y'�� SHEETNUMBER
a ORIGINALDESIGNSCALEANDRED, ■■ �� Bozeman,MT 59718 (-o NATE J. �'; APPR.BY: LRH gOZEMAN MONTANA 2�
GREEN,ANO BLl1E WILL BE VISIBLE IF •
REPRODUCE�TLV. 4OS.5B7.O7Z'I i�J MENUEZ
� M a i e r e � %� No 15739 PE _� DATE O6/2025 DRAWWG NUMBER
� www.m-m.net �rF P o�z9�zozs� .. q_C.REVIEW
MooiF sca�enccoRON��v� engineers surveyors planners scientists �'�,,Ss���STER`���'= BY STRUCTURAL DEMOLITION PLAN c��
�i<<�NAL��.��� V
a PLOTTED BV'.LEE HAGEMAN ON JUN04/2025 COPVRiGHT�OMORRISON-MAIERLE,2025 DATE: