009 - C-2 -CONST MGMT PLAN
G IPWWBPBPEWWBPBPXXXXGIPXXXXWWBPBPW BABCOCK STDURSTON RDCOTTONWOOD RD LAUREL PKWY VAUGHN DRLEGENDCONSTRUCTION TRAFFIC - ENTERINGCONSTRUCTION TRAFFIC - EXITINGOPTION 1OPTION 2CONSTRUCTION TRAFFIC - ENTERINGCONSTRUCTION TRAFFIC - EXITINGG IPNGSDWSWWWWSSS BP BP BP BP BP E8S15S15S15SSSESDWSW W W W BP BP BP BP BP FMFMEEXXXXXXXXXG IPNG XXXXXXXXXSDWSW W W WSSS BP BP BP BP BP TEMPORARY JOB SITE DUMPSTERMATERIALS STORAGEAND STAGING LOCATIONTEMPORARY SPOILS LOCATIONXXXXXXTEMPORARY JOB SITE TRAILERSFSFSFSFSFSFSFSFSFSFSFSFCONCRETE WASHOUTFACILITYSILT FENCESFSFSFSFSF2025COPYRIGHT © MORRISON-MAIERLE,SHEET NUMBERPROJECT NUMBERDRAWING NUMBERDATEDESCRIPTIONNO.BYP:\10678-LAUREL PARKWAY LLC\001 - NORTON RANCH LIFT STATION\ACAD\SHEETS\1-CIVIL\C-XX_EROSION_CONTROL-ROUTE_MAP.DWGREVISIONS DRAWN BY:DSGN. BY:APPR. BY:DATE:Q.C. REVIEWDATE:BY:2880 Technology Blvd WestBozeman, MT 59718406.587.0721www.m-m.netengineers surveyors planners scientistsMorrisonMaierleVERIFY SCALE AND COLOR!THIS SHEET MAY BE REDUCED AND ISINTENDED TO BE IN COLOR. THE BARBELOW WILL MEASURE ONE INCH ATORIGINAL DESIGN SCALE AND RED,GREEN, AND BLUE WILL BE VISIBLE IFREPRODUCED CORRECTLY.MODIFY SCALE ACCORDINGLY!PLOTTED BY:LEE HAGEMAN ON Jun/04/2025 NORTON RANCH LIFT STATION UPGRADES BOZEMANMONTANACONSTRUCTION MANAGEMENT, ROUTE, AND EROSION CONTROL PLAN10678.0019C-2KJSLRHLRH06/2025 3006001503000SCALE IN FEETAGENCY REVIEW (REVISION 2)JUNE 202505/29/20251.ALL IMPROVEMENTS ON THIS PROJECT SHALL BE COMPLETED IN ACCORDANCE WITH THE MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS, 6TH EDITION DATED APRIL 2010(MPWSS); THE CITY OF BOZEMAN MODIFICATIONS TO THE MPWSS; THE CITY OF BOZEMAN DESIGN STANDARDS & SPECIFICATIONS; AND THE PROJECT SPECIFICATIONS.2.CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE DIVISION OF INDUSTRIAL REGULATIONS (OSHA) SAFETY STANDARDS. IF REQUESTED BY THE INSPECTOR, THE CONTRACTORSHALL PROVIDE PROOF OF A PERMIT FROM SAID DIVISION.3.THE CONTRACTOR'S OPERATIONS SHALL BE CONFINED WITHIN THE PROJECT LIMITS. MATERIALS AND EQUIPMENT SHALL BE STORED ON THE PROJECT SITE WHERE APPROVEDBY THE OWNER. IT SHALL BE UNDERSTOOD THAT THE RESPONSIBILITY FOR PROTECTION AND SAFEKEEPING OF EQUIPMENT AND MATERIALS ON OR NEAR THE SITE WILL BEENTIRELY THAT OF THE CONTRACTOR AND THAT NO CLAIM SHALL BE MADE AGAINST THE OWNER BY REASON OF ANY ACT OF AN EMPLOYEE OR TRESPASSER.4.CONTRACTOR SHALL STRIVE TO MINIMIZE LARGE VEHICLE TRAFFIC THROUGH EXISTING RESIDENTIAL NEIGHBORHOODS TO THE EXTENT POSSIBLE. LARGE TRUCK TRAFFICSHALL USE THE ROUTES SHOWN IN THE GRAPHIC OR ADDITIONAL COUNTY ROADS THAT AVOID HIGH-DENSITY RESIDENTIAL NEIGHBORHOODS. THIS RESTRICTION SHALL NOTAPPLY TO LIGHT VEHICLE TRAFFIC INCLUDING TRADE VEHICLE TRUCKS AND PICKUP TRUCKS LESS THAN OR EQUAL TO 1 TON HAUL CAPACITY.5.THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND THE CITY, COUNTY, AND/OR STATE INSPECTOR 48 HOURS PRIOR TO COMMENCING CONSTRUCTION AND 24 HOURS INADVANCE OF SPECIFIC INSPECTION NEEDS DURING THE COURSE OF THE WORK. ALL WORK SHALL BE PERFORMED DURING NORMAL WORKING HOURS AND SUBJECT TO THEAVAILABILITY OF AN INSPECTOR AND APPROVED BY THE ENGINEER. THE CONTRACTOR WILL BE BILLED FOR SAID INSPECTION SERVICES AS PROVIDED IN THE MOST RECENTLYADOPTED FEES FOR SUCH SERVICES.6.THE CONTRACTOR SHALL PERFORM ALL CONSTRUCTION ACTIVITIES IN A MANNER TO MINIMIZE INCONVENIENCE TO THE ADJACENT BUSINESSES.7.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL PUBLIC AND PRIVATE PROPERTY INSOFAR AS IT MAY BE AFFECTED BY THESE OPERATIONS, ALL COSTS FORPROTECTING, REMOVING, AND RESTORING EXISTING IMPROVEMENTS SHALL BE BORNE SOLELY BY THE CONTRACTOR.8.THE CONTRACTOR SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARE NECESSARY TO ASSURE THE PROPER CONTAINMENT AND DISPOSAL OF POLLUTANTS ON THE SITE INACCORDANCE WITH ANY AND ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS.9.THE CONTRACTOR SHALL IMMEDIATELY CLEAN UP ANY CONSTRUCTION MATERIALS INADVERTENTLY DEPOSITED ON EXISTING STREETS, SIDEWALKS, OR OTHER PUBLICRIGHTS-OF-WAY AND MAKE SURE STREETS AND WALKWAYS ARE CLEANED AT THE END OF EACH WORKING DAY.10.CONSTRUCTION WORK ZONE TRAFFIC SIGNS SHALL BE FURNISHED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH APPLICABLE REQUIREMENTS OF THE REGULATORYAGENCIES HAVING JURISDICTION. A TRAFFIC CONTROL PLAN, PREPARED BY THE CONTRACTOR, MAY BE REQUIRED BY THE CITY OR STATE. "CONSTRUCTION AHEAD" WARNINGSIGNS ARE TO TO BE INSTALLED ALONG ADJACENT ROADS OR DRIVEWAYS. FLASHERS WITH CAUTION TAPE ARE TO BE INSTALLED WHERE ANY CONSTRUCTION ACTIVITYCROSSES A SIDEWALK OR PEDESTRIAN PATH IN ACCORDANCE WITH THE SPECIFICATIONS AND ANY OR ALL LOCAL REGULATIONS.11.NO STOPPING, PARKING, OR STORING OF CONSTRUCTION MATERIALS IN THE PUBLIC STREETS /ROADS, RIGHTS-OF-WAY, OR ANY DRIVEWAY IS ALLOWED.12.CONTRACTOR IS RESPONSIBLE FOR VERIFYING THAT THERE IS A CONSTRUCTION PERMIT APPROVED BY THE MONTANA DEPARTMENT OF ENVIRONMENTAL QUALITY (MDEQ) ORLOCAL GOVERNING AGENCY AS APPROPRIATE FOR THE CONTROL OF STORM WATER RUNOFF. IF THERE IS NOT AN APPROVED PERMIT, THE CONTRACTOR SHALL BERESPONSIBLE FOR OBTAINING THE NECESSARY APPROVALS FROM MDEQ OR THE LOCAL GOVERNING AGENCY.13.CONTRACTOR IS RESPONSIBLE FOR PROJECT DUST CONTROL.GENERAL NOTES:PROJECT LOCATION1.CONSTRUCTION DEBRIS WILL BE STORED ANDCOLLECTED IN A DEBRIS BOX SIMILAR TO THE ONESHOWN BELOW. THE LOCATION OF SAID DEBRIS BOXDURING CONSTRUCTION IS SHOWN ON C200 EROSIONAND SEDIMENT CONTROL PLAN. THE TYPE OFMATERIALS STORED AND COLLECTED WILL BE NORMALCONSTRUCTION MATERIALS SUCH AS WOOD, METAL,DRYWALL, STONE AND BRICK.2.RENTAL SIZES: 10 CUBIC YARDS - 12' X 8' X 3' | 4 TONWEIGHT LIMITTEMPORARY DEBRIS BOX NOTES:Know what'sbelow.before you dig.CallRNOTES BY SYMBOL:INSTALL TRACKOUT CONTROL SYSTEM PER DETAIL 3 ON SHEET SD-4 ORAS RECOMMENDED BY MANUFACTURERINSTALL CONCRETE WASHOUT FACILITY PER DETAIL 5 ON SHEET SD-4.INSTALL SILT FENCE PER DETAIL 5 ON SHEET SD-4.EROSION & SEDIMENT CONTROL NOTES:1.EROSION AND SEDIMENT CONTROL ON THIS PROJECT SHALL BE COMPLETED IN ACCORDANCE WITH THE CITY OF BOZEMAN'SBEST MANAGEMENT PRACTICE (BMP) MANUAL FOR CONSTRUCTION SITES. MARCH 1, 2019.2.ALL REQUIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBINGACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). DURING THE CONSTRUCTION OF UNDERGROUND STORMWATERFACILITIES, ALL CONTRIBUTING INLETS SHALL BE PROTECTED WITH STRAW WATTLES OR FABRIC INLET-BAGS TO MITIGATESEDIMENT ACCUMULATION. ALL OTHER REQUIRED EROSION CONTROL MEASURES SHALL BE INSTALLED AT THE APPROPRIATETIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, ANDSTORMWATER MANAGEMENT PLAN.3.AT ALL TIMES DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING AND CONTROLLINGON-SITE EROSION INCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED SO AS TO MINIMIZE WIND BLOWN SEDIMENT.THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR INSTALLING AND MAINTAINING ALL EROSION CONTROL FACILITIESSHOWN HEREIN.4.PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OFEXISTING VEGETATION SHALL BE LIMITED TO THE AREA(S) REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FORTHE SHORTEST PRACTICAL PERIOD OF TIME.5.CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES IN ADDITION TO WHAT IS SHOWN ON THESE PLANS.THE CONTRACTOR SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY TO CONTROL ON-SITE EROSION.6.ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY APPROPRIATE EROSION CONTROL METHODS.ANY SOIL STOCKPILE THAT WILL BE DORMANT FOR OVER THIRTY (30) DAYS SHALL BE SEEDED.7.THE CONTRACTOR SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARE NECESSARY TO ASSURE THE PROPERCONTAINMENT AND DISPOSAL OF POLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND ALL APPLICABLE LOCAL, STATE,AND FEDERAL REGULATIONS.8.THE CONTRACTOR SHALL IMMEDIATELY CLEAN UP ANY CONSTRUCTION MATERIALS INADVERTENTLY DEPOSITED ON EXISTINGSTREETS OR OTHER PUBLIC RIGHTS OF WAY, AND MAKE SURE STREETS ARE CLEANED AT THE END OF EACH WORKING DAY.9.GENERAL CONTRACTOR WILL BE RESPONSIBLE FOR ALL ELECTRICAL PERMITS/FEES.10.CONTRACTOR IS RESPONSIBLE FOR VERIFYING THAT THERE IS A CONSTRUCTION PERMIT APPROVED BY THE MONTANADEPARTMENT OF ENVIRONMENTAL QUALITY (MDEQ) OR LOCAL GOVERNING AGENCY AS APPROPRIATE FOR THE CONTROL OFSTORM WATER RUNOFF. IF THERE IS NOT AN APPROVED PERMIT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAININGTHE NECESSARY APPROVALS FROM MDEQ OR THE LOCAL GOVERNING AGENCY.1235010025500SCALE IN FEET32113-CONSTRUCTION MANAGEMENT PLANSCALE: 1" = 50'1-CONSTRUCTION ROUTE MAPSCALE: 1" = 300'2-TEMPORARY DEBRIS BOXSCALE: 1" = NTS