Loading...
HomeMy WebLinkAbout003 - G-3 - GEN NOTES & ABBREV GENERAL NOTES: GENERAL UTILITY NOTES: AB B R EV I AT I O N S 1. STANDARDSYMBOLSANDLINETVPESARESMOWNINTHELEGEND.SOMESVMBOLSORLINETVPESSHOWNMAVNOTBESMOWNONTHEPLANS. 1. THELOCATION,�EPTH,AN�SIZEOFEXISTINGUTILITIESSHOWNONTHESEPLANSISAPPROXIMATE.THECOMRACTORSHALLFlEL�VERIFVTHEEXISTENCE, 2. INGENERAL,EXISTINGSTRUCTURESAN�FACILITIESARENOTE�AS"EXISTING"AN�ARESHOWNINLIGHTLINEWEIGHTSORASSCREENEDBACKGROUN�. LOCATION.DEPTH,SIZE,LINE,ANDGRA�EOFE%ISTINGUTILITVCONNECTIONSPRIORTOCONSTRIICTION.THECONTRACTORSHALLBESOLELVRE5PON51BLE NEWSTRUCTURESORFACILITIESARESHOWNINHEAWLINEWEIGHTSAN�EMPHASIZE�FORINDNI�l1ALDRAWINGPl1RPO5E5. FORANVDAMAGETOTHEEXISTINGFACILITIES�UETOFAILURETOLOCATEORPROVIDEPROPERPROTECTIONWHENLOCATIONISKNOWN. /jg ANCHORBOLT FC FLEXIBLECOUPLING PNL PANEL 2 �ocnnoNOFsiTEununEssHnueEVEaiFiEoevcENEan�coNTancroanNOTHEunuTvcoManNvaaoviowcsEavicE.nNvaaoaoSEono�uSTMENTs ABDN ABANDON FCA FLANGECOUPLINGADAPTER PRCST PRECAST CONSTRUCTIONNOTES: rooevuTwrv�ocnnoNsnnueecooaoiNnreowirnuTwrvcoManwes. ABV ABOVE FD FLOORDRAIN PREFAB PREFABRICATED 1. ALLIMPROVEMENTSONTHISPROJECTSHALLBECOMPLETEDINACCORDANCEWITHTHEMONTANAPUBLICWORKSSTANDARDSPECIFICATIONS.CURRENT 3. PRIORTOPROVIDINGSUBMITTALSFORANVNEWPIPETHATISTOCONNECTTOANEXISTINGPIPEORSTRUCTURE,THECONTRACTORSHALLEXPOSETHE eoinoN(MPwss�;rnecitvoFaozeMaNMooiFicnnoNSTomeMawss;coeoesicNSTnNonRosnNosPeaFicnrioNs;nNomePRaecr exisrwcPiPeoesrRucruRetoveaiwirsexnct�ocnnoN,srze,mnteein�s,wveRte�evnnons,nNocanoe. AC ASPHALTICWNCRETE,ALTERNATINGCURRENT FDN FOUNDATION PRELIM PRELIMINARY sPeaFicnnoNs. a. rnecoNTRnctoRsnnuNonwrneMONrnNnoNecnuceNtee@aiioe�eoo�ssve3aaFORon�-siteurwiv�ocnnoN.nuKNowNexisnNcununes ADDL ADDITIONAL F.EXT FIREEXTINGUISHER PREP PREPARE,PREPARATION 2. CONTRACTORSHALLCOMPLVWITHALLAPPLICABLE�IVISIONOFIN�USTRIALREGIILATI0N5�O5HA�5AFETYSTAN�AR�S.IFRE0l1E5TEDBYTHEINSPECTOR. SHALLBEMARKEDBEFOREDIGGING.CONTRACTORSHALLBEREOUIREDTOREFRESHONECALLLOCATESASREOl11REDBVSTATELAW. ADJ ADJACENT,ADJUST FF FINISHEDFLOOR PROP PROPERN THECONTRACTORSHALLPROVIDEPROOFOFAPERMITFROMSAI��IVISION. � 5. SRETOBEROUGHGRADEDPRIORTOINSTALLATIONOFUTILITIESTOASSURE60FEET(]21NCHES�OFMINIMIIMCOVERONBURIE�FORCEMAINPIPINGOR /aDPTR ADAPTER FG FINISHGRADE PRV PRESSUREREDUCINGVALVE DEEPER AS SPECIFIED.IF 6 0 FEET OF MINIMUM COVER CANNOT BE OBTAINE�.INSIILATION OF PIPING SHALL BE REpl11RED.INSULATION SHALL BE REpl11RE�IF 3. THECONTRACTOR'SOPERATIONSSHALLBECONFINEDWITHINTHEPROJECTLIMRS.MATERIALSANDEpl11PMENTSHALLBESTORE�ONTHEPROJECT5ITE "OPENAIRFACILITIES"�1.E.,STORMDRAIN,IRRIGATIONCULVERTS)CROSSMAINSPERTHENPICALDETAILINCLUDED. AFF ABOVEFINISHEDFLOOR FL FLOOR,FLOW PS PRESSURESWITCH,PIPESUPPORT wHEaEnPPRovEoevrHEowNEaoawirwNOEoicnrEo�ocnnoNswiTHTEMvoanavcoNSTaucnoNEnsErnENTs.irsr+n��eEUNOEasT000THnTrHE s. TRncERwiaEisaEouiREOToeEiNSTnuEon�oNceuaiEOFoacEMnwsnNOTERMiNnTEonsaEouiaEoevTHEciTvoFeozEMnN AHR ANCHOR FLEX FLEXIBLE PT POINT,POINTOFTANGENCY RESPONSIBILITY FOR PROTECTION AN�SAFEKEEPING OF E�UIPMENT AND MATERIALS ON OR NEAR THE SITE WILL 6E ENTIRELV THAT OF THE CONTRACTOR nNornnrNocu�iMsnnuaeMnoencnwsrineowNeRevRensoNOFnNvnctoFnNeMa�oveeoRraesPnssea. �. cENERA�comTRncroRSHnuHnvEAavRovA�oFAL�covERNINCACENaESHAviNCJuaisoicnoNovERANvuiluTvsvSTEMpRIoaTOWSTALLnnoN. ALUM ALUMINUM RG RANGE PVC POLYVINYLCHLORIDE 4. CONTRACTORSHALLVERIFYE%ISTINGCON�ITIONSPRIORTOCONSTRUCTION.ANVDISCREPANCIESFOIINDARETOBEBROUGHTTOTHEENGINEER'S 8. ANVEXISTINGORNEWVALVESWHICHCONTROLTHECITYOFBOZEMAN'SWATERSUPPLYSHALLBEOPERATED6YCOBPERSONNELONLV. ALT ALTERNATE FLL FLOW LINE PVMT PAVEMENT nTTENnoNaaioRTOCornMEUCEMENTORCONnuUnnoNOFCONSTaUCnoNnCrivinES. s. mECONTRnCrORSnnuNonFVTnEwnrEROEPaaTMENTnMiNiMUMOFza-noua5aRi0RtoeEGwNwGnNvwoarc. ANSI AMERICANNATIONALSTANDARDSINSTITUTE FIN. FINISH RAD RADIUS 5. REFERENCEALLSURVEYMONUMENTS.SECTIONCORNER5,1I4CORNERS,ANOPROPERTVCORNERSPRIORTOBEINGDISTURBEDBYCONSTRUCTION.ANY 10. SEWERAN�WATERCONNECTIONSTOBUILDINGSSHALLBEPERFORME�BYALICENSE�PLUMBER. APPROX APPROXIMATE FLR FLOOR RC REINFORCEDCONCRETE MONUMENTSANDCORNERSDISTURBED�URINGCONSTRUCTIONSHALLBEREPLACEDBYAPROFESSIONALLANDSURVEVOR�PLS�REGISTEREDINTHESTATE 11. GENERALCONTRACTORWILLBERESPONSIBLEFORALLTAPANpTIE�INFEESRE�UIRED,ASWELLASTHECOSTOFUNDERGROUNDSERVICECONNECT10NST0 oFMONinNn. rneeui�omc. APVD APPROVED FO FIBEROPTIC RCP REWFORCED-CONCRETEPIPE 6. APRE-CONSTRIICTIONMEETING�ASREpUIRE��SHALLBEHELDWITHTHEGENERALCONTRACTOR,51TE5UBCONTRACTOR,CINOFBOZEMAN,OWNER, 12. ALLGRAVITVSANITARVSEWERMAINPIPINGSHALLBESOR35PVCINACCOR�ANCEWITHASTM03034,UNLESSOTHERWISENOTED.SANITARYSEWER ARCH ARCHITECTURE,ARCHITECTURAL FOC FACEOFCONCRETE RD ROAD,ROOFDRAIN MoaRisou�mniEa�E,iNc.,nNonNvorHEa�uRisoicTioNn�ncENciEsaRioaTOTHESTnRTOFcoNSTaucnoN. sERvicEssnnuaEsoazsiNnccoRonNCEwitnnsrMo3osa. ASPH ASPHALT FRP FIBERGLASSREINFORCEDPLASTIC RDCR REDUCER �. THEcoNTancroasHnuNonFVTHEENciNEEanNorHEciTv,couNrv,nNoioasTnTEiNSPECToaaaHouRsaaioaTocoMMENauccousraucnoNnNo �3. oiMENsioNssnowNnRETocENrERUNEOFaiaEORFinwc. AVG AVERAGE FSTL FABRICATEOSTEEL REBAR REINFORCEMENTBAR 2JHOURSINADVANCEOFSPECIFICINSPECTIONNEEDSDURINGTHECOURSEOFTHEWORK.ALLWORKSHALLBEPERFORMEDDURINGNORMALWORKING 14. THE�ISPLAYE�PIPELENGTHINPLANBPROFILEDRAWINGSREFLECTSTHE�ISTANCEFROMINSI�E-E�GE-0E-MANHOLETOINSIDE-E�GEOF-MANHOLEONALL AT FT FOOT,FEET REF REFERENCE HOURSAN�SUBJECTTOTHEAVAILABILITYOFANINSPECTORANDAPPROVEDBVTMEENGINEER.THECONTRACTORWILLBEBILLE�FORSAIDINSPECTION GRAVITYPIPING.THEPIPEGRADESSHOWNARECALCIILATE�FROMACTUALDISTANCES. C� SERVICESASPROVI�EDINTHEMOSTRECENTLVA�OPTE�FEESFORSIICHSERVICES. 15. CONTRACTORSHALLLAVGRAVITVAN�PRESSUREPIPEATl1NIFORMGRADEBETWEENIN�ICATEDELEVATI0NP01NTS. BD BOARD FTG FOOTING,FITTING REINF REINFORCE,REINFORCING 0. THECONTRACTORSHALLPERFORMALLCONSTRIICTIONACTIVITIE5INAMANNERTOMINIMIZEINCONVENIENCETOADJACENTBlI51NES5E5. 16. SIZEOFFITTINGSSHOWNONDRAWINGSSHALLCORRESPON�TOA�JACENTSTRAIGHTRIINOFPIPE,l1NLE550THERWISEINDICATE�.TYPE0FJ01NTAND BETW BETWEEN FTOF FACETOFACE RELOC RELOCATE,RELOCATION 9. THECONTRACTORSHALLBERESPONSIBLEFORPROTECTINGALLPIIBLICAN�PRIVATEPROPERTYIN50FARASITMAVBEAFFECTEDBYTHE5E0PERATIONS, FITTINGMATERIALSHALLBETHESAMEASSHOWNFORADJACENTSTRAIGHTRUNOFPIPE. BF BOTTOMFACE GA GAGE,GAUGE REQD REQUIRED n��CoStSFoapaOTECTING,REMowNG,ANoaeSToawGExiSTwGiMvaovEMENrSSHq�LBEBoameSo�ELVBVTHECONrRACTOR. n. THRuSTe�oCnSnRENOTGen�eanuvSHowNomTHEoapWiNGS.auFiTTINGS,waUoiNGBeNOSeoUA�TooaGaenTeerHnme�evEmpNDONE-ounRTea gLDG BUILDING GAL GALLON RST REWFORCINGSTEEL 10. THECONTRACTORSHALLATALLTIMESTAKEWHATEVERMEASURESARENECESSARYTOASSURETHEPROPERCONTAINMENTANDOISPOSALOFPOLLUTANTS DEGREES(11.25"),TEES,ANOPLUGS,SHALLBEMECHANICALLYRESTRAINEOAN�HAVEBELLRESTRAINTSWITHINTHEDISTANCESHOWNONTHEINCLUOE� JOINTRESTRAINTTABLE.CONTRACTORMAVELECTTOINSTALLTMRUSTBLOCKSINCONFORMANCEWITHMPWSSAN�THECRYOFBOZEMANMO�IFICATIONS BLK BLOCK GALV GALVANIZED RNV RIGHT-OF-WAY ON THE SITE IN ACCOR�ANCE WITH ANV AN�ALL APPLICABLE LOCAL,STATE.AN�FE�ERAL REGIILATI0N5. TO THE MPWSS IF APPROVE�IN A�VANCE BY THE ENGINEER. BLW BELOW GALVS GALVANIZED STEEL SAN SANITARY 11. THECOMRACTORSHALLIMMEDIATELVCLEANUPANYCONSTRUCTIONMATERIALSINADVERTENTLV�EPOSITEDONEXISTINGSTREETS,SI�EWALKS,OR �g, ALLVALVESSHALLBEMECHANICALLYRESTRAINE�AN�HAVEBELLRESTRAINTSWITHINTHEDISTANCESHOWNONTHEINCLU�EDJOINTRESTRAINTTABLE. BM BEAM,BENCHMARK GND GROUND SCHED SCHEDULE OTHER PIIBLIC RIGHTS�OF-WAV AND MAKE SURE STREETS AND WALKWAYS ARE CLEANED AT THE EN�OF EACH WORKING DAV. ALTERNATIVELY,VALVES MAV BE INSTALLEO WITH THRUST BLOCKING.VALVE 80%ES SHALL BE PROVIDED IN ACCORDANCE WITH CITY OF BOZEMAN STANOAROS 12. CONSTRIICTIONWORKZONETRAFFICSIGN55HALLBEFIIRNISHED,INSTALLED.ANDMAINTAINE�INACCOR�ANCEWITHAPPLICABLEREpl11REMENT50FTHE ANDMPWSS. BOT BOTTOM GRTG GRATING SDWK SIDEWALK REGULATORVAGENCIESHAVWGJURISOICTION.ATRAFFlCCONTROLPLAN,PREPAREDBVTHECONTRACTOR,MAVBERE�UIREDBYTHECITVORSTATE. 19. VALVEBOXESARERE�UIREDFORALLVALVESINBURIEDFORMAINSANDSERVICES. BRG BEARING GSKT GASKET SECT SECTION °coNsrRucnoNnnEno°wnRNwcsicNsnREroroeEwsTnuEoa�oNcno�ncENTaonosoRORivEwnvs.F�nsnERswimcnuTioNtaaEnREroeE zo. REFEaTosui�owca�nNFORcooRowanoNOFSEwEa,00MEsnc,FiaE,RooFORniN�nsnaaucne�E�,alloiRRicanoNcoNNEcnoNs. BRKT BRACKET GSP GALVANIZEDSTEELPIPE SHT SHEET INSTALLE�WHEREANVCONSTRUCTIONACTIVITYCROSSESASIDEWALKORPE�ESTRIANPATHINACCOR�ANCEWITHTHESPECIFICATIONSAN�ANYORALL Z�, GENERALCONTRACTORSHALLINSTALLCONDUITSBENEATHROA�WAVSFORDRYUTILITIES�NATURALGAS.POWER,CABLE,PHONE.ETC)ANOINOTHER �oCn�aeGU�nnoNa � CHAN CHANNEL GVL GRAVEL SIM SIMILAR AREASSHOWNONTHEPLANS.DRVUTILITIESARETOBEINSTALLEDASNOTEDINAGREEMENT�S)WITHTHEUTILIiVCOMPANVORCOMPANIES. 13. AREASONTHESITET08EGRADE�SHALLBECLEAREDANOGRUBBEDOFALLVEGETATIONANDOEBRIS.THESEMATERIALSSHALLBEREMOVEDFROMTHE 22, THECONTRACTORSHALLADJUSTALLNEWAN�EXISTINGVALVEBOXES,CURBBOXES,AN�MANHOLESTOFINALGRA�EUPONCOMPLETIONOFALL CHK CHECK GWB GYPSUM WALLBOARD SLP SLOPE SITE9YTHECONTRACTOR. CONSTRUCTION.ANYBOXESORMANHOLES�AMAGE�OROTHERWISE�ISTURBEDBYTHECONTRACTORORANVSUBCONTRACTORSHALLBEREPAIRE�AT CI CASTIRON HAS HEADEDANCHORSTUD SP SPACE,SPACED 14. SURFACESOILSWITHINTHEPROJECTLIMITSCONTAININGROOTSANDORGANICMATTERSMALLBESTRIPPE�DOWNANDSTOCKPILE�ORDISCARDEDAS THEE%PENSEOFTHECONTRACTOR.THISWORKSHALLBEINCI�ENTALTOTHEPROJECT.SEPARATEPAYMENTWILLNOTBEMA�E. CIMJ CAST-IRONPIPEMECHANICALJOINT HB HOSEBIB SPEC SPECIFICATION �IRECTE�BVTHEOWNERORENGINEER.�EEPERSTRIPPINGWHEREREOl11REDTOREMOVEWEAK501L50RACClIMULATI0N50RORGANICMATTER,SHALL 23. GENERALCONTRACTORWILLBERESPONSIBLEFORALLELECTRICALPERMITS/FEES. CIP CAST-IRONPIPEFLANGEDJOINT HD HUBDRAIN SPA,SPG SPACING BE PERFORMED WHEN�ETERMINE�BV THE ENGINEER OR OWNER'S AIITHORIZE�REPRESENTATIVE.STRIPPING SHALL BE REMOVED FROM THE SITE OR STOCrccI�EOATA�oCnnoNDESIGmqTEDBVTHEOwNER. CIPC CAST-IN-PLACECONCRETE HDW HARDWARE SPRT SUPPORT 15. THEGROUNDSURFACEEXPOSEDBYSTRIPPINGSHALLBESCARIFIEOTOAMINIMUMDEPTHOFEIGHTINCHES�B"),MOISTURECONDITIONEDTOTHEPROPER CIRC CIRCULAR HDR HEADER SQ SQUARE MoistuaecoNreNrwecoMPncnoN,nNocoMancreonsaeouiaeoFoacoMancreoFiu.aecoMancrioNsnnueeaPPRoveoevrneeNcweeR CJ CONSTRUCTIONJOINT,CONTROLJOINT HK HOOK SQFT SQUAREFOOT PRIORTO PLACING FILL. is. NosTOPawc.anRaNc,oasroaiNcoFcoNsreucrioNMnTeRin�swrnePuaucsrReers�Ronos,wcnrs�oF-wnv,oenNvoRmewnnsnuoweo. CL CENTERLINE HM HOLLOWMETAL SQIN SQUAREWCH i�. THEcoNTancTORSHnuREsroaEnuaonownvsuaFncESTOEQun�oReETTERcouoinoNTHnNExisTEoaRioaTOExcnvnnoNnsoETEaMwEoav CLDI CEMENTLINEDDUCTILEIRON HORIZ HORIZONTAL SST STAINLESSSTEEL nGENCv,owmeRpNDioaEmGwEER. CLG CEILING HP HORSEPOWER STA STATION ie. coNrRncToasnnuResroRenNrveceraTivecoveRoisTUReeoouRwccoNsrRucrioNacTiviivusiNGaseeoMixruaeaaPRoveoerrneatvoF CLR CLEAR,CLEARANCE HR HOSERACK,HOUR STD STANDARD eozEMnN,nNosnaueEREouiREoroENsuaEirsa�nNiEoouRiNcnNnPPaoPRinTESEnsoNnNowniEREOFORsuFFiciENrnMEroEsineusnRoor CMP CORRUGATEDMETALPIPE HT HEIGHT,HEATTRACE STIF STIFFENER MASS.LATEFALLAN�WINTERPLANTINGMAVBEALLOWEDIFAPPROVEDBYTHECITYAN�ENGINEER.�ISTIIRBEDAREASTHATCONVEYSIIRFACEWATER CMU CONCRETEMASONRYUNITS HV HOSEVALVE STL STEEL SHALL REQUIRE THE INSTALLATION OF EROSION CONTROL MATTING. i9. nSaHn�T,CONCaeTeCueenNoSioewn�KSHnueeSnwCUTOeNeaTCUTnSncaeoveoevaGeNCvnNoioaeNGweea. CO CLEANOUT HVAC HEATING,VENTILATING,ANDAIRCONDITIONWG STRUCT STRUCTURE 20. rHEComTRnCroRSHnuunuZECOMpqCTIONEouIVMEmTSUITnBLEFORTHESOI�TvaE5AND5uRFACEMqTEaiq�SENCOUNTEREooNTHEaRaeCT. COL COLUMN HWY HIGHWAY SYM SYMMETRICAL 2i. SUBGRAOESUB�BASEBASE,ANDSUaFnCECOUaSECOMvnCrioNSHAUCONFoaMToquppauCnBLESPECiFiCATIONSNorEDwTHEMPwSSnNOCiTvoF COMB COMBINATION ID INSIDEDIAMETER T&B TOPANDBOTTOM eozeMnNMooiFicnnoNsrorneMPwss. CONC CONCRETEORCONCENTRIC IE INVERTELEVATION TF TOPFACE DUCTILEIRON MINIMUM RESTRAINTLENGTHSFOR101NT RESTRAINT NOTES zz. coNcaeresnnueec�nssM-aooauN�essoTneRwisesaeaFieo. 1.EBAARESTRAINTLENGTHSFOR CONN CONNECT,CONNECTION IF INSIDEFACE TEMP TEMPORARY,TEMPERATURE za. coNrRncrioN�oiNrssnnuaecoNsraucteoevsnwwcoRscoRiNc.wneNscoewc,ntoo�snnueeuseornniwiu�envecoRNeRSRouNoeonNo (INFEET) PHASE1ASSUMEA7.0'BURY CONSTR CONSTRUCTION IN. INCH THK THICK TooesTRovnccaecnreiNTea�ocKFORsaeciFieoMiNiMUMoearH. DESCRIPTION A B DEPTHINGRAVELSWITHSAND CONT CONTINUE,CONTINUED,CONTINUOUS WFL WFLUENT THRU THROUGH za. canoee�evnTioNsiNoicnTeoev•xxxx��oNaiausnae+��a�oo�roaeaecTonruM. (GPjWITH2O0P51TEST CONTR CONTRACTOR INSTL INSTALL,INSTALLATION LQ TOPOF zs. SioeS�oae5Fa0MoamenmoanaKimGnaen55r+nuaea:iMaeuN�e55oTr+eRwi5e5aeCiFieo. 6��x6"rEE Z 1� PRESSUREANDASAFETY COORD COORDINATE INSTR INSTRUMENT T.O.C. TOPOFCONCRETE,TOPOFCURB 26. CONTRACTORISRESPONSIBLEFORVERIFYINGTHATTHEREISACONSTRUCTIONPERMITAPPROVEDBYTHEMONTANADEPARTMENTOFENVIRONMENTAL 6"HORIZONTAL90°BEND�EACHSIDEOFBEND) 12 FACTOROF2.ASSUMEMEGALUG CORR CORRUGATED INSUL INSULATE T.O.F. TOPOFFOOTING ounuTv�MOEa)ort�ocn�covErtNiNc ncENcv ns aaartoaaiaTE Fort rnE coNrrto�oF sToaM warErt rzuNOFF.iF rnERE is Nor nN nPPRovEo aERmir, OR EQU NALENT FITTI NGS AT ALL THECOMRACTORSHALLBERESPONSIBLEFOROBTAININGTHENECESSARVAPPROVALSFROMM�EpORTHELOCALGOVERNINGAGENCV. 6"VERTICAL90°BEND�EACHSIDEOFBEND) 12 CP CONTROLPANEL INT INTERIOR T.O.SL. TOPOFSLAB RESTRAINTS REQUIRED.ALL z�. coNrRncroRisaesaoNsis�eFoaaeaectousrcoNteo�. e•xs•rzeouceR is JOINTSWITHINTHERESTRAINT CPLG COUPLING INVT INVERT T.O.S. TOPOFSTEEL za. necessie�eRouTessnnunnvenMnxiMUMRUNNiNcs�oPeoFS/. LENGTHMUSTALSOBE CTOC CENTERTOCENTER JB JUNCTIONBOX LO.W. TOPOFWALL s"Hoa¢oNTn�n.zs°aeNo(ena sioe oF aeNo� z CTR CENTER JST JOIST TYP TYPICAL DIGITAL FILES AND MACHINE CONTROL RESTRAINED.IF THE DISTANCE s"HOR¢oNTn�zzs�eeNo�eacHsioeoFeeNo) a BETWEENFITTINGSISLESS CTSK COUNTERSWK JT JOINT UBC UNIFORMBUILDWGCODE 1. IFTHECONTRACTORUTILIZESACOMPUTERIZEDGRAOECONTROLSVSTEMWHENGRA�INGIFINISHINGSUBGRADE.SUB-BASECOURSEANDBASECOURSE, THANOREQUALTOTHE CU CUBIC L ANGLE UG UNDERGROUND UTILITIES.WRBANOGUTfER,ORFORCONSTRUCTINGANVOTHERFEATUREORFORANYOTHERPURPOSE,THENTHECONTRACTORISRESPONSI9LEFOR S"HORIZONTAL65°BEND(EACHSIDEOFBEND) 8 oEVE�oPmcinEiRowNMncwNEcoNrRo�Fi�Es.TnEconrRncroRMnvcREnrErwsontaFaoMsuaa�EMENTn�caomFORMnnoNallornE CALCULATEDRESTRAINT CUFT CUBICFEET LBS POUNDS ULT ULTIMATE wFORMnnoNaRovioEooNrnEa�nNsiNTnEcoNTRncroocuMENrs.rnEENciNEERMnvaaovioETnEcoNrRncroRsuaa�EMENTn�cnoiNFORManoN LENGTH,RESTRAINALLJOINTS CUIN CUBICINCH LF LINEARFEET V VALVE,VOLT iNTHEFoarnoFnNxM�suaFncEnNoioacnouNEwoaK(oEaivEOFaoMnuTocnocivi�ao�.THExM�suaFncEnNoioacnouuEwoRKOEVE�oaEoev BETWEENSAIDFITTINGS. CULV CULVERT WTL LINTEL VERT VERTICAL THE ENGINEER WAS PREPARED SOLELV FOR THE PURPOSE OF OEVELOPING THE PRINTE�PLANS AND WAS NOT DEVELOPED FOR ANY OTHER USE. E�EcrRONiconrnaaovioEorornEcoNrnncroRiscuRRENinsoFrnETiMEranNSMitrEorornEcoNTRnctoRnNOMnvNoriNcwoE�ntER 2.IFJOINTRESTRAINTISNOT CUYD CUBICYARD LONG LONGITUDINAL VOL VOLUME REwsioNSMnoEnNocoMMUNicnrEooNTHEcoNSTaucTioNa�nNs. D DRAIN LP LOCALPANEL VRFV VERIFY 2. THECONTRACTORSHALLSIGNAN�PROVIDEANMMI�SPECIFICELECTRONICINFORMATIONRELEASEFORMWHENREpUESTINGTHESIIPPLEMENTALCAD FEASIBLE-INSTALLTHRUST wFoaMnnoNnNosHnuREcocNrzEiNnrrHEvawTEocaNsnNosPEaFicnnoNsnNowFoaMnnoNFouNOTHEaEwnaETHEcoNTancroocurnENTs BLOCKSPERMPWSS. d PENNY(NAILSIZE) LR LONGRADIUS VTR VENTTHROUGHROOF nNonssucn,TnEvcovEallovERnNvcnoiNFORMnnonaaovioEo.TnEENcwEERsnauNOTeEaEsaoNsie�EFORaNvusEOFTniscnomFoaMnnoN DBA DEFORMEDBARANCHOR LVL LEVEL W WIDTH oRMooiFicnnoNSMnoerneRero. 3.WSTALLPERCITYOFBOZEMAN DBL DOUBLE LVR LOWER WD WOOD CONSTRUCTIONCOORDINATION (COB)STANDARDS,MONTANA DET DETAIL MATL MATERIAL W/ WITH � PUBLIC WORKS STANDARD DI DUCTILE IRON,DRAIN INLET MAX MAXIMUM W�O WITHOUT 1. THECONTRACTORSHALLSENDONLVCIVILRELATEDITEMSTOMORRISON-MAIERLE,INC.THROIIGHEMAIL.PROCORE,ORSIMILARPROGRAMS. SPECIFICATIONS(MPWSS),AND � 2. CONSTRIICTIONITEMSSHALLBESENTTOASINGLEP0INTOFCONTACTATMORRISON-MAIERLE,INC.THISSHALLBEESTABLISHEDATTHEPRECONSTRIICTION DIA DIAMETER MB MACHINEBOLT WL WATERLINE o COB MODIRCATIONS TO MPWSS. DIAG DIAGONAL MCC MOTOR CONTROL CENTER MeeriNc. WM WIRE MESH - 4.ALL HYDRANT LEADS SHALL BE DIM DIMENSION MCP MOTOR CONTROL PANEL WS WATERSTOP,WATER SURFACE FULLY RESTRAINED. DIMJ DUCTILE-IRON MECHANICAL JOINT MECH MECHANICAL WSTL WELDED STEEL,WROUGHT STEEL DIR DIRECTION MFD MANUFACTURED WT WEIGHT y DN DOWN MFR MANUFACTURE,MANUFACTURER WTR WATER DR DOOR MH MANHOLE WWF WELDED WIRE FABRIC � DWG DRAWING MIN MINIMUM WWM WELDEDWIREMESH � EA EACH MISC MISCELLANEOUS XFMR TRANSFORMER EF EACH FACE,EXHAUST FAN MJ MECHANICAL JOINT YD YARD � EL,ELEV ELEVATION NIC NOT IN CONTRACT � ELB ELBOW NO NUMBER NOTE: � ELEC ELECTRIC,ELECTRICAL NOM NOMINAL 1. FOR ABBREVIATIONS NOT LISTED,SEE"ABBREVIATIONS FOR ENCL ENCLOSE NTS NOT TO SCALE USE ON DRAWINGS AND TEXT",PUBLISHED BY THE � ENGR ENGINEER OC ON CENTER AMERICAN NATIONAL STANDARDS INSTITUTE INC.(ANSI) - EP EDGE OF PAVEMENT OD OUTSIDE DIAMETER OR CONTACT THE ENGWEER. A A y�A q EQL EQUAL,EQUALLY OF OUTSIDE FACE �1 '9 2. THIS IS A STANDARD ABBREVIATION LIST.THEREFORE,NOT I- T EQLSP EQUALLYSPACED OPNG OPENING U � I H I A � EQUIP EQUIPMENT P&ID PROCESS AND INSTRUMENTATION DIAGRAM ALL ABBREVIATIONS ARE USED ON THE PLANS. z EQUIV EQUIVALENT PC POINT OF CURVE 3. ADDITIONAL ABBREVIATIONS FOR SPECIALIZED WORK DIVISIONS o EW EACH WAY PCP PLANTCONTROLPANEL TEE BEND DEAD END VERTICAL QNSTRUMENTATION AND CONTROL,ELECTRICAL,ETC.)ARE ¢ EXC EXCAVATE PE PLAIN END OFFSET SHOWN ON OTHER LEGEND SHEETS. RESTRAINT LENGTH LOCATION FIGURE EXH EXHAUST PEN PENETRATION - EXP EXPANSION PERP PERPENDICULAR � EXP JT EXPANSION JOINT PH PIPE HANGER � EXST EXISTING PI PRESSURE INDICATOR,POINT OF INTERSECTION �11 DI MECHANICAL JOINT RESTRAINT TABLE EXT EXTENSION,EXTERIOR PJF PREMOLDED JOINT FlLLER ° scn�e.NTs F FLANGE PL PLATE,PROPERTY LINE ° FAB FABRICATE PLYWD PLYWOOD AGENCY REVIEW (REVISION 2) FB FLAT BAR,FACE BRICK PMP PLANT MONITORING PANEL JUNE 2025 J REVISIONS J veaiFv SCn�e�. DRAWN BY: KJS PROJECT NUMBER � _,al�'�A�J �>> NO. DESCRIPTION BY DATE y' � --C�` � �� 10678.001 mesePrzmrsnnnvserzeouceo. MOI �ISO� � 2880TechnologyBlvdWest DSGN.BY: LRH NORTONRANCHLIFTSTATIONUPGRADES a LINE BELOW MEASURES ONE INCH ■■ �^� ���� oN orziciNn�oanwiNc. � Bozeman,MT 59718 , qppR.BY: LRH SHEET NUMBER ,� BOZEMAN MONTANA 3 �--F � M a i e r I e 406 58�0�2, �A W. � No.48 6 PE=J DATE: O6/2025 DRAWWG NUMBER �'r� q o/zv/zozs MooiFvscn�enccoaowc�v� � www.m-m.net ��ssp��57EREo�G� q.C.REVIEW GENERALNOTES&ABBREVIATIONS G�� engineers surveyors planners scientists ��'4�ONAL`�` BY� a PLOTTED BV:LEE HAGEMAN ON JUN04/2025 COPVRiGHT�OMORRISON-MAIERLE,2025 DATE: