HomeMy WebLinkAbout217-DevelopmentReviewApplication ;�:i;
Community Development
._ �. _.., _.- . _ � ., �_;� .. __ .. ...._-�� _ �. �
Remember to o6tain owner signature on ti►is form prior to uploading with d�e rest of yo�r su6mitta!
PROJECT INFORMATION
Project Name: Norton Ranch Lift Station Upgrades
Project Type(s): Site Plan SP
Street Address: Lift station property.Lot 1 of Norton East Ranch Subdivision
Phase 6.
NORTON EAST RANCH SUB PH 6,S09,T02 S,R05 E,Lot
1,ACRES 0.157,PLATJ-694
Legal Description:
Due to increased sewerflows,the installation of largerforce
main,wet well,pumps,electrical controls,and upgrades to the
Description of Project: existing building are required to adequatelyserve the service
area to ultimate buildout.
CurrentZoning: R-4 Residential High DensityDistrict
E�sting Use: Commercial
Proposed Use: Commercial
Gross Lot Area: 6851
Number of Buildings: 0
Type and Number of Dwellings: 0
Building Size(SF): 62g �i
Non-Residential Building Size(SF): 628
Building Height(ft): 13
Affordable Housing(Y/N):
Departure/Deviation Request(Y/N): Yes
Zoning Verification E�edited(Y/N): No
Wetlands Activity(Y/N):
Traffic Study or Waiver: Waiver(Issued by Engineering)
Is there a pre-application pertaining to this project?: No
Project Name and Project Number:
PROPERTY OWNER
Company Name: City of Bozeman .
Name: Shawn Kohtz
Full Address: PO BOX 1230,Bozeman,MT 59771
Email:
Phone:
APPLICANT
Company Name: Morrison-Maierle Inc.
Name: Lee Hageman
Full Address: 2880 Technology Blvd W. ,Bozeman,Montana 59718
E mai l:
Phone:
REPRESENTATNE
Company Name: Morrison-Maierle Inc.
Name: Lee Hageman _
Full Address: 2880 Technology Blvd W. ,Bozeman,Montana 59718
Email:
Phone:
CERTIFICATIONS AND SIGNATURES
Applicant signature is captured electronically at time of application submittal.This application PDF must also be
signed by the property owner(s)for all application types before the submittal will be accepted.The only exception
to this is an informal review application that may be signed by the applicant(s)only.The applicant(s)and property
owner(s)submit this application for review under the terms and provisions of the Bozeman Municipal Code. It is
further indicated that any work undertaken to complete a development approved bythe City of Bozeman shall be
in conformance withthe requirements ofthe Bozeman Municipal Code and anyspecial conditions established by
the approval authority.I acknowledge that the City has an Impact Fee Program and impact fees may be assessed
for my project.Further, I agree to grant City personnel and other review agency representative's access to the
subject site during the course of the review process(Section 38.200.050,BMC). I(We)hereby certify that the
above information is true and correct to the best of my(our)knowledge.
Certification of Completion and Compliance-I understand that conditions of approval may be applied to the
application and that I will complywith any conditions of approval or make necessary corrections to the application
materials in orderto complywith municipal code provisions.
Statement of Intent to Construct According to the Final Plan-I acknowledge that construction not in
compliance with the approved final plan may result in delay�6flpccupancy or costs to correct noncompliance.
�i
Property Owner Signature: .;�� � —
Printed Name: Shawn Kohiz
� �
CONTACT US
Alfred M.Stiff Professional Building phone
20 East Olive Street fax406-582-2263
Bozemn,MT 59715
www.bozeman.net/planni ng