Loading...
HomeMy WebLinkAbout217-DevelopmentReviewApplication ;�:i; Community Development ._ �. _.., _.- . _ � ., �_;� .. __ .. ...._-�� _ �. � Remember to o6tain owner signature on ti►is form prior to uploading with d�e rest of yo�r su6mitta! PROJECT INFORMATION Project Name: Norton Ranch Lift Station Upgrades Project Type(s): Site Plan SP Street Address: Lift station property.Lot 1 of Norton East Ranch Subdivision Phase 6. NORTON EAST RANCH SUB PH 6,S09,T02 S,R05 E,Lot 1,ACRES 0.157,PLATJ-694 Legal Description: Due to increased sewerflows,the installation of largerforce main,wet well,pumps,electrical controls,and upgrades to the Description of Project: existing building are required to adequatelyserve the service area to ultimate buildout. CurrentZoning: R-4 Residential High DensityDistrict E�sting Use: Commercial Proposed Use: Commercial Gross Lot Area: 6851 Number of Buildings: 0 Type and Number of Dwellings: 0 Building Size(SF): 62g �i Non-Residential Building Size(SF): 628 Building Height(ft): 13 Affordable Housing(Y/N): Departure/Deviation Request(Y/N): Yes Zoning Verification E�edited(Y/N): No Wetlands Activity(Y/N): Traffic Study or Waiver: Waiver(Issued by Engineering) Is there a pre-application pertaining to this project?: No Project Name and Project Number: PROPERTY OWNER Company Name: City of Bozeman . Name: Shawn Kohtz Full Address: PO BOX 1230,Bozeman,MT 59771 Email: Phone: APPLICANT Company Name: Morrison-Maierle Inc. Name: Lee Hageman Full Address: 2880 Technology Blvd W. ,Bozeman,Montana 59718 E mai l: Phone: REPRESENTATNE Company Name: Morrison-Maierle Inc. Name: Lee Hageman _ Full Address: 2880 Technology Blvd W. ,Bozeman,Montana 59718 Email: Phone: CERTIFICATIONS AND SIGNATURES Applicant signature is captured electronically at time of application submittal.This application PDF must also be signed by the property owner(s)for all application types before the submittal will be accepted.The only exception to this is an informal review application that may be signed by the applicant(s)only.The applicant(s)and property owner(s)submit this application for review under the terms and provisions of the Bozeman Municipal Code. It is further indicated that any work undertaken to complete a development approved bythe City of Bozeman shall be in conformance withthe requirements ofthe Bozeman Municipal Code and anyspecial conditions established by the approval authority.I acknowledge that the City has an Impact Fee Program and impact fees may be assessed for my project.Further, I agree to grant City personnel and other review agency representative's access to the subject site during the course of the review process(Section 38.200.050,BMC). I(We)hereby certify that the above information is true and correct to the best of my(our)knowledge. Certification of Completion and Compliance-I understand that conditions of approval may be applied to the application and that I will complywith any conditions of approval or make necessary corrections to the application materials in orderto complywith municipal code provisions. Statement of Intent to Construct According to the Final Plan-I acknowledge that construction not in compliance with the approved final plan may result in delay�6flpccupancy or costs to correct noncompliance. �i Property Owner Signature: .;�� � — Printed Name: Shawn Kohiz � � CONTACT US Alfred M.Stiff Professional Building phone 20 East Olive Street fax406-582-2263 Bozemn,MT 59715 www.bozeman.net/planni ng