RE:[EXTERNAL]Norton Ranch Lift Station-Proposed Site Configuration
From Lance Lehigh< >
Date Fri 10/18/2024 2:49 PM
To Lee Hageman< >;Shawn Kohtz< >;Nick Pericich< >;Cody Flammond< >
� 2 attachments(2 KB)
ATT00001.txt;ATT00002.htm;
***This message originated from an External Source.***Please use proper judgment and caution when opening attachments,clicking links,or responding to this message.
Lee,
I was able to sit down with Shawn(Director of Utilities)and Nick P(Water/Sewer Superintendent)to discuss your email.The following comments are in relation to the
conceptual layout and provide general feedback as you continue to move into draft design.
Design Feedback
1.Keep force main in City ROW as much as possible.
2.Limit amount of piping as much as possible,notlng there are constraints you are working around such as the electrical and gas mains,etc.
3.The City is ok with the wet well located on the east side of the property as present.
4.The City would like to limit the number of future manholes.The directive was to limit the amount of manholes vs placing multiple manholes in the BLVD space.This
would require reconfiguration of the existing manholes in the Laurel Parkway,which may require regrading to achieve the desired flow results.
5.The City is ok utilizing the 30 foot easement to the south of the structure to maintain proper utility spacing requirements and future access.
6.The proposed Revised Manifold—Isometric drawing—Is the intent to split the flow between the 6-inch and 8-inch force main.A second closed gate valve may be
necessary on the downstream side of the six-inch jockey pump feed for isolatlon.Based on our discussion it sounds like you anticipate using the 6—inch main during low
flows and the 8-inch during peak periods.
I was also able to discuss the downstream evaluation and model results with Shawn and Nick.
Downstream Capacity analysis Director Determination
1.The anticipated flow associated with the Norton Ranch Lift station upgrades have adequate downstream capacity in the near-term to handle the expected Peak Flows at
the future tle-in point on the 18-inch main within Cottonwood Road
a.No downstream upgrades are required as part of these improvements.
Please let us know if you any questions.
Lance
City of Bozeman MT
Lance Lehigh, PE,CFM � Engineer III
From:Lee Hageman< >
Sent:Thursday,October 10,2024 2:46 PM
To:Shawn Kohtz< >;Nick Pericich< >;Lance Lehigh< >;Cody Flammond
< >
Subject:[EXTERNAL]Norton Ranch Lift Station-Proposed Site Configuration
CAUTION:This email originated from outside of the organization.Do not click links or open attachments unless you recognize the sender and know the content is safe.
Shawn,Lance,and Nick,
Lance was kind enough to jump on a quick screen share with me yesterday to look at the lift station site and the proposed configuration. Based on our chat,I
prepared a conceptual layout to get additional feedback from everyone on this email so everyone is comfortable and I can move this conceptual plan forward into
draft design documents. The attached exhibit shows our proposed configuration of the site and piping with the new wet well.
A couple of notes on this site and configuration:
• The proposed wet well location(east of the existing building)is the most constructable to avoid undermining the existing wet well,existing building,and a
proposed expansion of the existing building.
• The site is constrained to the south between the building and the property line. There is not sufficient space to accommodate the gravity main to the new
wet well and the buried wet well underground piping while providing adequate separation distances from the existing property lines,the existing building,
and between the buried piping and gravity main.
o An existing sewer easement on the property to the south can help resolve this issue(see image below and attached easement).
..•��• .• .•�.•�.•�.•�.• .�.�.•�••�:
II I I � �I R=170_00'
L-269
I } — �=o"5`OF
f�I �i I __ -._--
t�' �: c -
� H=2.I ,
' = VAUGHN DRIVE (60')��R�SEwER -- ; � , '��
�Ii� � r�� - — � - EASEMENI ��`"�
—_- � III�IIl�1T see oerna az sHeEr s- -_ _ _
•� _ —�
_-- ,
r �j'u — _. — �\
r.. e
�
� � � �� � �
�� —-- -_ - --- �P` `�_��r.
�
�,I� �°as�o�E i2o o _ -
+ —s<
I ---- � \ T �
i I 3o.00snNiraHvsEwEH � � I }��
�'� EASEME�r —r� �o����.�o�sroR�,,��.,�v � i ,
' IN SEEDETAILb2SHEETS � �AS�noLNT I 300f1'WIDEP�DESTRIAN&
yi I' � , StED��ni�..'�SN_�i5 STORMSEWER
I1 II EA52MENT
I �L� SEE DETA14p�SHEEt 5
I �
i�i�ll '�. N � ----� .� � � I � .
I ` ---- MWRIM6__ � _ � I i
i, � I ,
� � I iI I
Ii�li � �I�iN� I I I I .
�
II I I I''i I }� � � .. - � I I I I -M\
p . ql�'•II..I�_ I� RI(1(`If 1 i I II
■ There is a manhole in Laurel Parkway and 8"stub that was previously installed to service that property that we could reconfigure to provide an
alignment for the new gravity main to the wet well.
• We are proposing to abandon those plans in favor of rerouting the effluent from the inlet pipe to the existing wet well to the new wet well
location.
• The proposed manholes would be installed outside of the existing banks of the stormwater pond to avoid inundation in the existing
conditions.
o The existing pond shown is proposed to be abandoned when that lot is developed based on conceptual site plan we are working
on.
• The site still gravity main service for the subdivision/lot.
• Manholes in the boulevards could be made accessible with curb cuts and approaches(if needed).
• The wet well will have a concrete access driveway,plus include a gravel access route to the south property line.
Proposed Manifolding
I've also drafted a proposed manifold configuration for the building that would prevent the issues with the flow meters. Here's a few images of the existing
configuration and the proposed configuration for reference.
""'"'""'""'""'"""_"_'"""_..._'_""""""'_"_'"'"""'""""'""""'""'"��' PVC .__"'"'""_'""""""'
SOR-26
"'"""'"""""'""'"""""""'""'"""'""'"'""""'"'""""""'"""""""""'"""""""'""""""'"""""""""""'"""'""'"'""'"""` I�
_______________________________________________�.___-"'_ QAS55�3EDUCTI�RaN ` ��
�-6 PYC � l� I �
3R-26 TO SOR 28 P4C�
�OVC7ILE IRON
6'WCTIF iRCN � DSO��RGE PPINC
pSCHARGE PIPMG ,
� �I
___________________�_� __ '�_ _____ ____________________,
1 �
� �j �
�_*___ �_________________________
r_�___________ l I
16'BADGER YAG-
f'N�iEL�ER I I ' �MEIER'MM PRIMO � �
2J60 SE91E5 � I ;ELECTRONICS � �
kt4UAN1 NEDGE � ' (� �t � �
I/'��`, G�IE V�L`�E I ` I� v 1 I
�% { WC LE IRON fi'OUC'ILE IRON I � 1 1
qSC�IAR�E PIFING I - • IWRA 1 1
DISCN�R�PIPING � �pqESSJRE ` I I
I ^ '� ����nop�c
�'__-__ --�'----�_�- �__ � • i G�UGt `1 I 1
'__' ______ '
I -_-_- /:" - I 1 I 1
_�_ -_'"_ I. �+r�_ \1 I I
' 1 I
'� + �"v6'R(IX1 i I I 1
'� 1 I I 1�4�NJAL�IF I 1
_}___ __________________ — 1 ___ qrll_�I�OAl_ I 1
'�""'
_+—_ _______________ � � I • Y41 vF I I
"-'---'..__""�'_" -"r -'•i i i
i i i i
MKA
' ���6�REOU 8�WCiIE INON i
---' `"'-- pSCM�R4E�IPMC i I� GAUQ � � I 1
�_-----_ -y _ * N]._' )� N 36' I I
' ______'____-____"__ 1___ 1____ � '� I I
�\ AEEYE COU7UNG(M.�__'i � � I�+� I, 1 1
��_� (RES�AMED; � I � 1 I
I I GENER�TOR 1 I
i..E'RC��CCR-� !'BADCER NAG-
I � NEfER W7N PRINO SITE 11]'vr0'c56' 1 I
ELECIRONKS ���CiWLAL/
I I MECIANIC�L�UNS� �
� ________ _____ ___________________FOR OETRILS�__J 1
1
6aaK6 lEE �
I
' _ __________________________J
_________�________
6�MULLER I�•MUELIER 4J80 SE�IES
� 2]fiG YRIES
RESILiMt RESIUAVT N£DCE GATE
V.EDCE �w�
CnTE V�LVE
Figure 1.Existing Norton Ranch Lift Station Piping
EXISTING WET WELL-SECTION VIEW
A�OTION VENT TIiROUCN
DETECIOR '�ROOF
MOUNT
IAANUA. A R
RELI['F 1"
PARKING (3)fi" MUELLER 8001 SERI:S BAI� VAIVF q" VUELLER
BOLLARD SW1NG CHECK VALVES-FLxFL 6'HUELLER RES�LIANTIEWEDGE
(T7P.) 2360 SERIES CATE VALVE
RESIUANT NEDGE
z. GATE VALVE 4"BADCER YAG-
METER WITH PRiMO
�M ELEC7RONICS
�H CONDUIT TO PUM'DSCCN�EC' 6" DIA OJCi1LE
�N CONTROL PANEL MOUNTING ASSEMBLY IRON PIPINC N 15'
IN S.S'-
JUNCTION UNI-STRUi OR EWAL AN
BO% 'h1TMIN IRRIGA710N BOX OUT
FLYCT UPPER 15 GENERATOR
GUIDE BAR BLIND FLANGE SIIE 112"z40�x5�
BRACKET VATH 8'INSIDE-GRI7PER PLUG, �1e� r � (SEE ELEC7RiCAl
OR APPRDVED EOUAL VAKA gppE� MECHANICAL
ao PRESSURE FLOOF2 PLANS FOR
�E ����.y..•r,;•• �� WRB BO% GAUGE ��RAIN T, DEtAlLS)
MOUNTING - _-- - ,�
BRAp(Ei 3
�� 6" 3ADGER MAG-
TO GENERATOR � MEiER N1TM PftIYO
BUILDING ELECTRONICS �µ O 12"0/C
ACH WAY
�'� TOP h BOTTOM
"FLAPPER�STYLE 2 CORPORATION STOP �+
CHEpC VAL�E W/FITlINGS 2' SCH 80 PVC BALL F
CHECIC ORAIN TO NET I�
KOR-N-SEAL NELL 41N. SLOPE AT Yi/FT. �
OR APPROVED 90'SKEEP GENFRATOR P
EOUAL(TYP.) 5'-0'x10'-6'M
fER ....... .
�ER ....' 'w'--"
87 R
4'x6"REDUCER 1� Sp1 80 `4'PVC
' PVC. IAIN SLOPE� SDR-26
�-,.,� 4'OUCTIIE IRON SLEEVE COUPLING AT 1/4'/FT. �6 Pvc
DISCHARGE PIPING (TYP.)(RES7RAINED) SDR-26
STAINlE55$TEEL 6� DUCnIE IRON
INTERMEDIATE DISCHARGE PIPING
DISCHARGE PIPE
ANCHOR BRACKET
AS NECESSARY NOiE:
Proposed Revised Manifold -Plan
n
C �,'�:;;;:,:;�,-
- � �
C �,� :■�-
C- ..,��. I
��� ;.., �
' �=�1
��� `�. , _ � _�_1
�
1
� ''�
::,
Proposed Revised Manifold -Isometric
f��l',—.�C��RG�PIPE FROM
...,..�...,PUMP iPUk1PS �..F�,,�;. . . ..F..
'-L � � .�.1 L�l�— ..
, ,
� , - . ,-=xis iru;�, F�:k i , �:
Ili�d , _ ,.".TV�I�/�LL'�''.
� l �� � �
���. �
� .� ( �I �
\ '�` r �\�JI� �� �\ �
�� (� _!�\ ...., �I �\ �
�`�� �(�� . I � .
�����`�'- �'� �� ��r' �_� � (�\
�- ��
� \ . � �
- � � �'
- -�
� '
t� ' � - � �
�� ., � � ; � �
Please reach out with any questions or suggestions at your earliest convenience. I'm happy to jump on a quick call if thaYs easier.
I appreciate your feedback on this.
Thank you,
Lee Hageman,PE
�� Senior Engineer,Morrison-Maierle
-
+14069226734 direct � +14062091948 mobile