Loading...
HomeMy WebLinkAbout215-CapacityDeterminationOutlook RE: [EXTERNAL]Norton Ranch Lift Station - Proposed Site Configuration From Lance Lehigh <llehigh@BOZEMAN.NET> Date Fri 10/18/2024 2:49 PM To Lee Hageman <lhageman@m-m.net>; Shawn Kohtz <SKohtz@BOZEMAN.NET>; Nick Pericich <NPericich@BOZEMAN.NET>; Cody Flammond <CFlammond@BOZEMAN.NET> 2 attachments (2 KB) ATT00001.txt; ATT00002.htm; ***This message originated from an External Source.*** Please use proper judgment and cauon when opening aachments, clicking links, or responding to this message. Lee, I was able to sit down with Shawn (Director of Ulies) and Nick P (Water/Sewer Superintendent) to discuss your email. The following comments are in relaon to the conceptual layout and provide general feedback as you connue to move into dra design. Design Feedback 1. Keep force main in City ROW as much as possible. 2. Limit amount of piping as much as possible, nong there are constraints you are working around such as the electrical and gas mains, etc. 3. The City is ok with the wet well located on the east side of the property as present. 4. The City would like to limit the number of future manholes. The direcve was to limit the amount of manholes vs placing mulple manholes in the BLVD space. This would require reconfiguraon of the exisng manholes in the Laurel Parkway, which may require regrading to achieve the desired flow results. 5. The City is ok ulizing the 30 foot easement to the south of the structure to maintain proper ulity spacing requirements and future access. 6. The proposed Revised Manifold – Isometric drawing – Is the intent to split the flow between the 6-inch and 8-inch force main. A second closed gate valve may be necessary on the downstream side of the six-inch jockey pump feed for isolaon. Based on our discussion it sounds like you ancipate using the 6 – inch main during low flows and the 8-inch during peak periods. I was also able to discuss the downstream evaluaon and model results with Shawn and Nick. Downstream Capacity analysis Director Determinaon 1. The ancipated flow associated with the Norton Ranch Li staon upgrades have adequate downstream capacity in the near-term to handle the expected Peak Flows at the future e-in point on the 18-inch main within Coonwood Road a. No downstream upgrades are required as part of these improvements. Please let us know if you any quesons. Lance City of Bozeman MT Lance Lehigh, PE, CFM | Engineer III From: Lee Hageman <lhageman@m-m.net> Sent: Thursday, October 10, 2024 2:46 PM To: Shawn Kohtz <SKohtz@BOZEMAN.NET>; Nick Pericich <NPericich@BOZEMAN.NET>; Lance Lehigh <llehigh@BOZEMAN.NET>; Cody Flammond <CFlammond@BOZEMAN.NET> Subject: [EXTERNAL]Norton Ranch Li Staon - Proposed Site Configuraon CAUTION: This email originated from outside of the organizaon. Do not click links or open aachments unless you recognize the sender and know the content is safe. Shawn, Lance, and Nick, Lance was kind enough to jump on a quick screen share with me yesterday to look at the lift station site and the proposed configuration. Based on our chat, I prepared a conceptual layout to get additional feedback from everyone on this email so everyone is comfortable and I can move this conceptual plan forward into draft design documents. The attached exhibit shows our proposed configuration of the site and piping with the new wet well. A couple of notes on this site and configuration: The proposed wet well location (east of the existing building) is the most constructable to avoid undermining the existing wet well, existing building, and a proposed expansion of the existing building. The site is constrained to the south between the building and the property line. There is not sufficient space to accommodate the gravity main to the new wet well and the buried wet well underground piping while providing adequate separation distances from the existing property lines, the existing building, and between the buried piping and gravity main. An existing sewer easement on the property to the south can help resolve this issue (see image below and attached easement). There is a manhole in Laurel Parkway and 8" stub that was previously installed to service that property that we could reconfigure to provide an alignment for the new gravity main to the wet well. We are proposing to abandon those plans in favor of rerouting the effluent from the inlet pipe to the existing wet well to the new wet well location. The proposed manholes would be installed outside of the existing banks of the stormwater pond to avoid inundation in the existing conditions. The existing pond shown is proposed to be abandoned when that lot is developed based on conceptual site plan we are working on. The site still gravity main service for the subdivision/lot. Manholes in the boulevards could be made accessible with curb cuts and approaches (if needed). The wet well will have a concrete access driveway, plus include a gravel access route to the south property line. Proposed Manifolding I've also drafted a proposed manifold configuration for the building that would prevent the issues with the flow meters. Here's a few images of the existing configuration and the proposed configuration for reference. EXISTING WET WELL - SECTION VIEW Proposed Revised Manifold - Plan Proposed Revised Manifold - Isometric Please reach out with any questions or suggestions at your earliest convenience. I'm happy to jump on a quick call if that's easier. I appreciate your feedback on this. Thank you, Lee Hageman, PESenior Engineer, Morrison-Maierle +14069226734 direct | +14062091948 mobile 2880 Technology Blvd W, Bozeman, MT 59718 A 100% Employee-Owned Company