HomeMy WebLinkAbout029 Stormwater Management PackageGran Cielo I Block 4 Minor Subdivision Preliminary Plat Application 29 – Stormwater Management City of Bozeman Staff has approved a partial waiver for this section during the pre-application process. Attached is a supplementary Memo. 895 Technology Blvd Suite 203  Bozeman, MT 59718  (406) 586-0262 895 Technology Boulevard, Suite 203, Bozeman, MT 59718 | 406.586.0262 March 18th, 2025 City of Bozeman Planning Department 20 East Olive Bozeman, MT 59715 We have prepared this memo as part of our Preliminary Plat application for Gran Cielo Block 4 Minor Subdivision. This memo hopes to address the comment provided on Gran Cielo Block 4 Minor Subdivision Pre-Application. The comment is provided below: ” - A.10 – Stormwater management. Provide a supplemental memo from a professional engineer registered in the State of Montana demonstrating that adequate stormwater capacity exists to serve the proposed subdivision.” We have provided the previously approved Stormwater report that shows the previously accepted stormwater capacities. We have also provided the following information with supplementary calculations showing the increase in runoff with the addition of 2 lots. By comparing the previously approved reports to the proposed subdivision, this shows that we have adequate stormwater capacity. Stormwater With the addition of two lots, there will be two additional single family detached households. Our calculations were based off the conservative assumptions that Block 4 would be 60% impervious with 5 lots and 80% Impervious 7 lots. The increase of impervious area would come with the addition of two new buildings, driveways, and walkways. A 20% increase a conservative estimate, but was used to demonstrate there would still be adequate stormwater runoff capacity. Refer to Appendix A for existing stormwater plan and layout for Gran Cielo I. Table 1 below shows the previously accepted required volume for the stormwater Pond 1. Block 4 is a part of Basin 13, and all runoff contributes to Pond 1. Page 2 in that report identifies that the required volume for Pond 1 is 12,105 cubic feet. The Basins approximate size is 14,427 cubic feet, meaning Pond 1 could support an additional 2,322 cubic feet of stormwater runoff. Project: Gran Cielo Block 4 Subdivision Page 2 of 4 895 Technology Blvd Suite 203 Bozeman, MT 59718 (406) 586-0262 Our calculations estimated that the addition of two lots would create an increase of 286 cubic feet. Block 4 would contribute 1,267 cubic feet of stormwater runoff with 5 lots and 1,553 cubic feet with the addition of 2 lots. This is a negligible increase compared to the Pond 1’s potential capacity. Attached: Appendix A: Gran Cielo Subdivision Drainage Basin Calculations Appendix B: Previously Accepted Gran Cielo I Stormwater Report WWC/Madison Engineering ______________________ Erik Ringsak, PE Department Manager Project: Gran Cielo Block 4 Subdivision Page 3 of 4 895 Technology Blvd Suite 203 Bozeman, MT 59718 (406) 586-0262 APPENDIX A Gran Cielo I Subdivision Drainage Basin Calculations Gran Cielo I Block 4 Minor Sub Stormwater Detention/Retention Calculations Detention Pond 1 Calculation of Required Volume for Storm Water Retention & Infitration System Design Rainfall Freq.10 10 Year - 2 Hour event IDF coefficient a 0.64 IDF coefficient b IDF coefficient n 0.65 5 Lot Calculations: Total Basin Area:30,152 sf C Areas (ft2): Impervious 18,091 0.90 Landscaped 12,061 0.20 Total:30,152 0.62 Retention Basin Calculation: Q = CIA C =0.62 (post-development) I = 0.41 in/hr (10-yr, 2-hr storm) A = 0.69 acres Qpost =0.18 cfs Required retention storage (ft3) =1,267 ft3 (10-yr, 2-hr storm) 7 Lot Calculations: Total Basin Area:30,152 sf C Areas (ft2): Impervious 24,122 0.90 Landscaped 6,030 0.20 Total:30,152 0.76 Retention Basin Calculation: Q = CIA C =0.76 (post-development) I = 0.41 in/hr (10-yr, 2-hr storm) A = 0.69 acres Qpost =0.22 cfs Required retention storage (ft3) =1,553 ft3 Additional Stroage required with the addition of 2 Lots:286 ft3 Additional Storage available for Pond I:2,322 ft3 * See Gran Cielo I Subdivision Stormwater design report page 2 Detention Pond Requirements.xlsx Project: Gran Cielo Block 4 Subdivision Page 4 of 4 895 Technology Blvd Suite 203 Bozeman, MT 59718 (406) 586-0262 APPENDIX B Previously Accepted Gran Cielo I Stormwater Report