An exemption request has been submitted to the DEQ for this 7-lot Subsequent Minor
Subdivision. Please see a copy of the letter included in this submittal.
Gran Cielo I Block 4 Minor Subdivision
Preliminary Plat Application
M NOW A PART OF
MADISON /.
ENGINEERING '^^WWC
ENGINEERING
895 TECHNOLOGY BOULEVARD,SUITE 203,BOZEMAN,MT 59718 1 406.586.0262
March 24,2025
Department of Environmental Quality
Permitting&Compliance Division
Water Quality Division
P.O. Box 200901
Helena,MT 59620-0901
RE: Gran Cielo I Block 4 Subsequent Minor Subdivision—Preliminary Plat Application
Exemption Request
Dear Reviewer,
WWC Engineering/Madison is requesting an exemption for infrastructure plan and specification review
regarding the proposed 2 lot subsequent minor subdivision legally described S23, T02 S, R05 E, BLOCK
4,Lot 1-7 located in Bozeman,MT. The zoning of these lots are R-3,Residential medium-density district.
The current Block 4 has 5 parcels, and the subsequent minor proposed will add 2 parcels within Block 4.
The property lines will be divided into 7 lots, all lots lay on undeveloped existing platted parcels. There is
no planned construction with this subdivision other than the abandonment and installation of utility stubs
for the new parcels.
There is an existing 8"ductile iron water main and an 8"PVC sewer main that both run north-south on 31 st
Ave that will service these newly created lots. Therefore, there is no proposed water main or sewer main
installation associated with this preliminaa plat. Currently service stubs exist that serve the five platted
lots. SS service stubs will need to be added to the two additional lots(lots 3 and 6).Additionally,due to the
relocation of property lines,water service stubs for lots 3,4&5 will need to be installed,while the existing
service in lot 4 will need to be abandoned. No additional utilities are proposed to be installed with this
minor subdivision.
Enclosed,please find a memo that identifies the existing stormwater retention pond has the ability to
handle two additional lots.
Enclosed, also find a copy of the block 4 layout with service changes for your reference. Please respond at
your earliest convenience with any comments or questions to the address provided below,or feel free to
contact me directly at 406-586-0262 or email at erin sg ak(cr�,wwcen in�g com Thank you for your
consideration.
Sincerely,
WWC Engineering,Inc.
a A- kx:n4�%
Erik Ringsak,PE
enc: Previously approved Stormwater Drainage Plan&Memo
Proposed Subdivision Services& Site Layout
895 Technology Blvd, Ste 203 ♦ Bozeman,MT 59718 ♦ (406)586-0262
K:\Bozeman\Bozeman Haus LLC\2024500 Gran Cielo 1-Block 4 Subdivision\05CAD\Sheets\Services&Site Layout.dwg TEST PIT 3/24/2025 11:55:50 AM
Cn
—S
ALLEY
O
SS `� SS
LOT 1
4047 SQ. FT. LOT 10
MIKAEL AERON
LOT 5
MOORE
BOZEMAN HAUS,LLC
o— SM WS
PROPOSED LOT LINES
PREVIOUS LOT LINES
LOT 2
ws 4048 SQ. FT. LOT 9
JOSEPH M.
ANDERSON
SS SS
LOT 6
BOZEMAN HAUS,LLC sM SEWER SERVICE TO BE INSTALLED
SS LOT 3
ws 4046 SQ. FT. W
WATER SERVICE TO BE INSTALLED 0
LOT 8 Q
ws Op BOZEMAN HAUS,LLC
EXISTING WATER SERVICE TO BE ABANDONED 7�
SS SS
LOT 4 w O
LOT 7 SM ws 4049 SQ.FT. J �^
BOZEMAN HAUS,LLC WATER SERVICE TO BE INSTALLED Q V,
o
LLI
Q W
WATER SERVICE TO BE INSTALLED
LOT 5
ws —Z4050 SQ.FT. O
SS LOT 7 J
?� SS — BOZEMAN HAUS,LLC W
o U
LOT 8 SM z
BOZEMAN HAUS,LLC ws SEWER SERVICE TO BE INSTALLED
LOT 6
SS — 4050 SQ.FT. fL.L
V
PREVIOUS LOT LINES
o
SS SS PROPOSED LOT LINES
LOT 7 LOT 6
LOT 9 C AA ws 5862 SQ.FT. BOZEMAN HAUS,LLC
BOZEMAN HAUS,LLC J�Y�
>-1 X
wv N
w w w w w w w
CIELO WAY
I- 0 15' 30'
V! SCALE: 1"=30'
o 0 o o BOZEMAN HAUS LLC PREPARED BY NO. REVISION BY DATE
1 m D y
m z Z GRAN CIELO I BLOCK 4 SUBDIVISION -,^^^W C ENGINEERING= e mo
m j < m 895 TECHNOLOGY BLVD.,SUITE 203
i SERVICE & SITE LAYOUT BOZEMAN,MT 59718
nn p p (406)624-3910
u A GALLATIN COUNTY, MT www•wwcengineering.com
Now A PART OF
MADISON /►
ENGINEERING �-^-'WWC
-� ENGINEERING
895 Technology Boulevard, Suite 203, Bozeman, MT 59718 1406.586.0262
March 24th, 2025
DEQ Stormwater Memo
Stormwater
With the addition of two lots, there will be two additional single family detached households. Our
calculations were based off the conservative assumptions that Block 4 would be 60% impervious
with 5 lots and 80% Impervious 7 lots. The increase of impervious area would come with the
addition of two new buildings, driveways, and walkways. A 20% increase is a conservative
estimate, and was used to demonstrate there would still be adequate stormwater runoff capacity.
It should be noted that this subsequent minor subdivision is a part of a greater subdivision that has
been previously approved. Refer to Appendix A for existing stormwater plan and layout for Gran
Cielo I. Table 1 below shows the previously accepted required volume for the stormwater Pond 1.
Block 4 is a part of Basin 13, and all runoff contributes to Pond 1. Page 2 in that report identifies
that the required volume for Pond 1 is 12,105 cubic feet. The Basins approximate size is 14,427
cubic feet, meaning Pond 1 could support an additional 2,322 cubic feet of stormwater runoff.
TABLE 1
DETENTION POND VOLUMES
10-yr,2-hr Post Approx.
Required
Contributing Development Proposed
Pond ID Basins* Peak Runoff Volume Volume
cis (C.F.) C.F.
f 1 6,7,8,9,13 8.30 12,105 14,427
uture base)
2 3,4,5,14,15 6.39 8,753 13,385
3 2,12,16,17,18 4.14 7,842 7,846
lure base
Infiltration
Basin 3 1 0.72 487 533
(fieumphase)
4(Meadow I 1 0.54 450 1,505
Creek Phase 1
•See Sheet SD1.0 Storm Drainage Basins
Our calculations estimated that the addition of two lots would create an increase of 286 cubic feet.
Block 4 would contribute 1,267 cubic feet of stormwater runoff with 5 lots and 1,553 cubic feet
with the addition of 2 lots. This is a negligible increase compared to the Pond I's potential
capacity. Refer to appendix B for calculations
Attached: Appendix A Gran Cielo Subdivision Drainage Basin
Appendix B Gran Cielo Subdivision Drainage Basin Calculations
WWC/Madison Engineering
Ru
Erik Ringsak,PE
895 Technology Blvd Suite 203 ♦ Bozeman,MT 59718 ♦ (406) 586-0262
Project: Gran Cielo Block 4 Subdivision
APPENDIX A
Gran Cielo Subdivision Drainage Basin
895 Technology Blvd Suite 203 Bozeman,MT 59718 (406)586-0262
R UJ
Dltit`E — ----
I
Z mZ� cm m
< o I I mmo
�z z
mD z �.
z
mZ t cz o «��w
'Z� «
mho rno o -W
-O.,i I �i m-mi j
or I I oZ r
Cow I I II � - m
I II m o c
I �pZ z I y
�I Woz00
I
�I mmn�
� --sBENN1:I'T BLVD�--�-=
_ Iltm I . I
Imo, ( Zn Z�C
C I
I! Iwl =Z <o <p ;u
;u i O C I
�I Nzm, m I -imz
xNmm r~ x mK f y �z
vDi o ocm ✓>---�II!C�I�I �0O I m I zmi m
m cn -z ti `
-na,Z lid zoD vm+ ' c
� �-
y m m� li lid J L \ \ m
� mD
.Tl t I - — — — — i ' t \ U) n-�
r.:
D� 11..I �� Tl� \ �cDi)
�: j � I L . _�Z� .� I �' �nZ
I o Z 1 r''�� I CIF.Lo
znD III Zx ZZ I�
rZ �Z I f I
y I i
m m I
m zz > m
tr
r Z L
a
r
D
I � Z mOD
I - I Zzm
i rlrxlz�I:uv z
D
— J
\.. BASIN 10
GR_\F STREET BASIN 12
rrl r�
CO m0X
m� om � T
om o� c�
<o� �c)c
r� n0
cm r,im °°
�m mm z
mz NZ r
�1 m� M
�z z
N- J
n z o
v v
T
':/\ -:{I C JrY�L.l4nwii4u-n:n'an G euyv Ycau.J'
p cn MADISON ENGINEERING GRAN CIELO SUBDIVISION "° ^51�
ro 895 TECHNOLOGY BLVD,SUITE 203 STORM DRAINAGE BASINS B
8 0 o BOZEMAN,MT 59718
(406)586-0262 (406)586-57+0 FAX
BOZEMAN,MT 2 P
LL m o
Project: Gran Cielo Block 4 Subdivision
APPENDIX B
Gran Cielo Subdivision Drainage Basin Calculations
895 Technology Blvd Suite 203 Bozeman,MT 59718 (406)586-0262
Gran Cielo I
Block 4 Minor Sub
Stormwater Detention/Retention Calculations
Detention Pond 1
Calculation of Required Volume for Storm Water Retention&Infitration System
Design Rainfall Freq. 10 10 Year-2 Hour event
OF coefficient a 0.64
OF coefficient b
OF coefficient n 0.65
5 Lot Calculations:
Total Basin Area: 30,152 sf
C
Areas (ft2):
Impervious 18,091 0.90
Landscaped 12,061 0.20
Total: 30,152 0.62
Retention Basin Calculation:
Q= CIA
C= 0.62 (post-development)
I = 0.41 in/hr(10-yr, 2-hr storm)
A= 0.69 acres
QPost= 0.18 cfs
Required retention storage(ft3)= 1,267 ft3 (10-yr, 2-hr storm)
7 Lot Calculations:
Total Basin Area: 30,152 sf
C
Areas (ft2):
Impervious 24,122 0.90
Landscaped 6,030 0.20
Total: 30,152 0.76
Retention Basin Calculation:
Q= CIA
C= 0.76 (post-development)
I = 0.41 in/hr(10-yr, 2-hr storm)
A= 0.69 acres
QPos,= 0.22 cfs
Required retention storage(ft3)= 1,553 W
Additional Storage required with the addition of 2 Lots: 286 ft
Additional Storage available for Pond I: 2,322 ft
Detention Pond Requirements.xlsx