Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
021 (PC) Sht A3.2 - RUP-Parish-Student Centers_Main Level Floor
DN UP UP UP DAIRINAIROUT D CCHG GGCH D H C HCHCCH18'-8"CHDC HGD1 1 11 11 K K J J I I H H G G F F E D D C C B B A A M M 8.3 8.3 3 3 1.4 1.4 0.1 0.1 PRIEST OFFICE 103 FAMILY RR/ SHOWER 106 PASTOR OFFICE 105 ELEC 107 PRINT RM 114 CONFERENCE ROOM 116 OFFICE 110 VESTIBULE 101 OFFICE 109 OPEN OFFICES 111 OFFICE 115 F.F. OFFICE 119 WOMENS RR 122MENS RR 121 MOTHER'S RM 135 JAN 134 VESTING 132 SACRISTY 131 STOR. 133 CLASSROOM/ MEETING RM 129A KITCHEN 127 VESTIBULE 126 CLASSROOM/ MEETING RM 125 CLASSROOM/ MEETING RM 124B G A5.3(PC) G A5.3(PC) B A5.1(PC) B A5.1(PC) PARISH CENTER 128 HALL 120 HALL 112 A A5.1(PC) A A5.1(PC) A4.1(PC) 1 A4.1(PC)2 A4.1(PC)4 E A5.2(PC) E A5.2(PC) 2 2 4 4 5 5 6 6 7 7 8 8 9 9 10 10 L L OPEN OFFICES 113 SECURE STOR. 117 FF STOR. 118 H A5.3(PC) H A5.3(PC) I A5.3(PC) I A5.3(PC) D A5.2(PC) D A5.2(PC) O O 3' - 6"12' - 8"16' - 0"52' - 0"26' - 0"2' - 0" C A5.1(PC) C A5.1(PC) WORSHIP / MUSIC STORAGE E130 HALL 123 NEW ENTRY HALLWAY 102 FS1.1 12' - 0"6' - 0"6' - 0"8' - 0"14' - 6"10' - 0"+/- 22' - 8 1/2"8' - 8"4' - 0"6' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"2' - 10 1/4"5' - 6"1' - 7 3/4"10' - 0"10' - 0"12' - 0"8' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"108' - 8"130' - 0"STAIRS 104 N N I.2s FH A3.7(PC) 1 A9.1(PC) 2 A3.7(PC) 2 A9.1(PC) 4 A3.7(PC) 3 0' - 9"0' - 4"4' - 8"4' - 4"13' - 0"0' - 7"3' - 0"2' - 2"2' - 10"7' - 0"0' - 5"5' - 8"6' - 0"4' - 8"6' - 0"5' - 8"2' - 6"5' - 0"2' - 6"1' - 6"6' - 4"1' - 2"28' - 0"97' - 5 1/2" 99' - 11" 100' - 0" VESTIBULE 136 ENTRY STAIRS 137 D136-2D136-1 D124-1D124-2 D118-1 D117-1 D116-1D115-1D114-1D114-2D120-1D119-1 D122-1 D126-2 D126-1 D127-1 D127-2D121-1D109-1D102-1 D110-1D103-1 D104-1 D105-1 D106-1 D107-1 D134-1D128-1 D135-1 E129-1E129-2E129-3E131 E130D101-1D101-2D101-4D101-3D116-2 QWER ASDF S-8 S-8 S-7 S-5 S-11 S-3BCCBS-1 S-2B B FC F I-1 S-12 F F H F G 5 12' - 2"3' - 10"5' - 10"4' - 0" 0' - 2" 15' - 3"4' - 9"4' - 0"6' - 0"10' - 0"2' - 10 1/4"5' - 8 3/4"10' - 4"10' - 7"5' - 4"2' - 5"3' - 4"4' - 0"8' - 6"5' - 6"2' - 4"1' - 8"0' - 6"1' - 9"2' - 1"3' - 2"8' - 0"0' - 6"8' - 2"3' - 4"3' - 2"4' - 1"2' - 9"1' - 10"12' - 8"13' - 6"6' - 4"6' - 4"2' - 4"13' - 8"5' - 0"5' - 0"5' - 6"9' - 0"5' - 6"5' - 0"5' - 0"1' - 1"10' - 0"0' - 11"8' - 8"8' - 8"8' - 8"7' - 11"6' - 7"0' - 8"4' - 4"4' - 4"0' - 8"6' - 3"5' - 9"+/- 10' - 3"E.3 E.4 E.4 E.3 E.3 E.3 E.4 E.4 2x12 E.4 E.3 E.3 E.4 E.4 E.3 E.3 E.3 E.3 0' - 6"6' - 5"E.6 E.7 E.7 E.7 E.7 E.6 I.3 S-9 CLASSROOM/ MEETING RM 124A CLASSROOM/ MEETING RM 129B MOVEABLE DIVIDER WALL, SEE SPEC I.1 TF I.1 TF I.2s FH I.2s FH I.2s FH I.2s FH I.2 FH I.2 FH I.2 FH I.2 FH I.2s FH I.2s FH I.2s FH I.2 FH I.1 FH I.2 TF I.2s FH I.2s FH I.2 FH I.2s I.2s FH I.2 FH I.2 FH I.6s FH I.2s FH ELEVATOR 005 CHASE I.2s FH I.2s FH D132-1 E1 8' - 8"1' - 4"4' - 0"4' - 0"6' - 0"0' - 10"8.8 8.8 E E.8 E.3 NOTE: PRIOR TO THE REMOVAL OF THE EXISTING BEARING/ SHEARWALL AND COLUMNS ALONG GRIDLINE 3 -PROVIDE AND INSTALL TEMPORARY ROOF TRUSS SHORING. COORDINATE SHORING PLAN WITH ENGINEER PRIOR TO CONSTRUCTION. TEMPORARY SHORING TO REMAIN IN PLACE UNTIL NEW LOAD- BEARING CONSTRUCTION IS COMPLETE. NOTE: NOT ALL EXISTING CONDITIONS MAY BE REPRESENTED ON THESE DEMOLITION PLANS. CONTRACTOR TO VERIFY FIELD CONDITIONS PRIOR TO CONSTRUCTION. NOTE: LOCATION OF PRIMARY ELECTRICAL PANEL IS TO BE MAINTAINED. PROVIDE TEMPORARY SUPPORT AND PROTECTION UNTIL PERMANENT CONSTRUCTION IS COMPLETE. 5/8" / 12"1' - 6"97' - 6" E.3 A3.8(PC) 1 A3.8(PC) 2 12' - 8"2' - 7"2' - 7"1' - 3"6' - 0"1' - 0"1' - 6"6' - 0"3' - 4"1' - 1"I-2 D125-1 D133-1 A9.1(PC) 7 I.2 TF 8' - 10"13' - 6"6' - 9"PHASE: DRAWN BY: SHEET NUMBER: SHEET TITLE: architecture one eighteen 115 east oak street bozeman mt 59715 CHECKED BY: REVISIONS: COPYRIGHT NOTICE: This document and the ideas and designs incorporated herein are given in confidence and shall be used only pursuant to the agreement with Architecture118. No other use, dissemination, or duplication may be made without prior written consent of Architecture118. All common law rights of copyright are hereby specifically reserved.0"1"2"OWNER: PROJECT NUMBER: PROJECT LOCATION: RR/ KP SS (PC) (R) KEY PLAN: (SC) CONTRACTOR: LANGLAS & ASSOCIATES 406.585.3420 STRUCTURAL: HICKS ENGINEERING 406.586.4365 MEP: CDS ENGINEERING 406.282.7082 KITCHEN DESIGN: J&V RESTAURANT 406.587.9303 10/22/2024 9:16:12 AM22-014SITE PLAN SUBMITTAL A3.2(PC) MAIN LEVEL FLOOR PLAN - PARISH CENTER RUP - PARISH CENTER (PC) / STUDENT CENTER (SC)1725 SOUTH 11TH AVE, BOZEMAN, MT 59715RESURRECTION UNIVERSITY PARISH OCTOBER 22, 2024SITE PLAN SUBMITTAL1725 SOUTH 11TH AVE, BOZEMAN, MT 59715 1/8" = 1'-0"1 PARISH CENTER - FULL FLOOR PLAN 123 DESCRIPTION DATE