HomeMy WebLinkAbout086_Simkins2B4BBuildingandShedKeyPlanCP#1
CP#2
CP#3
CP#4
CP#5
CP#6
CP#7
CP#8
CP#9
CP#10 CP#11
CP#12
CP#13
CP#14
CP#15
CP#16 FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONWHEAT DRIVEOVERALL SITE LAYOUTSIMKINS NORTH PARK TRACTS 2-B & 4-BNORTH PARK SIMKINS-HALLIN SITE DEVELOPMENTBOZEMAN, MTC3.1 RPE/TRP21363_01_OVERALL_SITE_PROD.DWGCS/DME08/20/2024SP1 SUBMITTAL--------------21363.01 NORTH
0 80
SCALE: 1" = 80'
1604080
GENERAL UTILITY NOTES:
1.ALL DUCTILE IRON PIPE AND FITTINGS INCLUDING HYDRANTS, VALVE BOXES, CURB BOXES, AND ALL OTHER METAL PARTS AND
SURFACES SHALL BE ENCASED WITH V-BIO® ENHANCED POLYETHYLENE ENCASEMENT.
2.THE POLYETHYLENE ENCASEMENT SHALL BE OVERLAPPED ONE FOOT IN EACH DIRECTION AT JOINTS AND SECURED IN PLACE
AROUND THE PIPE, AND ANY WRAP AT TAP LOCATIONS SHALL BE TAPED TIGHTLY PRIOR TO TAPPING AND INSPECTED FOR ANY
NEEDED REPAIRS FOLLOWING THE TAP.P:\21363_01_Simkins_North_Park_Site_Plan\CADD_C3D\PRODUCTION_DWG\TRACT 2-B & 4-B\21363_01_OVERALL_SITE_PROD.dwg, C3.1, 8/20/2024 3:15:55 PM, cschreiner, 1:1