Loading...
HomeMy WebLinkAbout073_A201.c_ExteriorElevationsFINISH FLOOR 100' - 0" 1234568 STRAIGHT COLUMN 115' - 0" RACKING RACKING 150' - 0" M1 25' - 0"1" / 12"7 101A DOWNSPOUT BY PEMB, TYP. EAVE HEIGHT (NORTH) 120' - 4" MTL SCULPTURED RAKE BY PEMB DOWNSPOUT BY PEMB, TYP. MTL GUTTER, BY PEMB T.O. RIDGE +/- 125' - 0" FINISH FLOOR 100' - 0" 1 2 3 4 5 6 8 STRAIGHT COLUMN 115' - 0" RACKING WILL CALL 150' - 0" M1 M325' - 0"KALWALL1" / 12"6' - 0"9' - 0"11 20' - 0"3' - 0"7 M1 MTL GUTTER, BY PEMB MTL SCULPTURED RAKE BY PEMB FIRE VENT (SHOWN OPEN), REF MEP 101C DOWNSPOUT BY PEMB, TYP. EAVE HEIGHT (SOUTH) 120' - 0" WALL LIGHT, REF MEP T.O. RIDGE +/- 125' - 0" FINISH FLOOR 100' - 0" ACHJ STRAIGHT COLUMN 115' - 0" 108' - 0" M1 M2 M3 SURFACE APPLIED BUILDING NUMBER WALL SIGNAGE = 86.5 SQFT KALWALL RACKING 1" 12" 1" 12" 16' - 6"6' - 0"9' - 0"40' - 0" ALIGN ALIGN 15' - 0"BFG M1 M2 M1 M3 101F 101E 101B STL PIPE BOLLARD EAVE HEIGHT (SOUTH) 120' - 0" EAVE HEIGHT (NORTH) 120' - 4" FIRE VENT (SHOWN OPEN), REF MEP WALL LIGHT, REF MEP DOWNSPOUT BY PEMB, TYP. MTL GUTTER, BY PEMB MTL SCULPTURED RAKE BY PEMB T.O. RIDGE +/- 125' - 0" M1 FINISH FLOOR 100' - 0" A C H J STRAIGHT COLUMN 115' - 0" 108' - 0" M3 M1 M2 RACKING RACKING 1" 12"1" 12"7' - 9"7' - 3"31' - 11 3/4"5' - 9" ALIGN M1 M2 M1 B F G 101H 101G STL PIPE BOLLARD 101D EAVE HEIGHT (SOUTH) 120' - 0" EAVE HEIGHT (NORTH) 120' - 4" FIRE VENT (SHOWN OPEN), REF MEP WALL LIGHT, REF MEP DOWNSPOUT BY PEMB, TYP. MTL GUTTER, BY PEMB MTL SCULPTURED RAKE BY PEMB T.O. RIDGE +/- 125' - 0"WH E A T D RIV E R AIL R O A D KEYPLAN PLAN NORTH MATERIALS M-1: CORRUGATED METAL SIDING FINISH-GALVANIZED (NOT HIGHLY REFLECTIVE) M-2: RIBBED METAL SIDING FINISH-GALVANIZED (NOT HIGHLY REFLECTIVE) INTENDED EFFECT: M-3: WIDE PROFILE METAL SIDING FINISH-PAINTED BY MANF. COLOR-TBD PENDING OWNER SELECTION MCELROY MULTI-COR MCELROY U-PANEL MCELROY 5V 19' - 4"6' - 0"16' - 6"6' - 0"TYPE A - FIXED RE. SCHEDULE FOR INTERIOR FIXED WINDOWSREF PEMBREF SCHEDREF SCHED TRANSPARENCY CALC: 16 SQFT / 2868 SQFT = 0.005 (0.5%) Date Project Number Sheet Name ALL DRAWN AND WRITTEN INFORMATION APPEARING SHALL NOT BE DUPLICATED, DISCLOSED OR OTHERWISE USED WITHOUT THE WRITTEN CONSENT OF 45 ARCHITECTURE REVISIONS ALL DRAWN AND WRITTEN INFORMATION APPEARING ON THIS DRAWING SHALL NOT BE DUPLICATED, DISCLOSED OR OTHERWISE USED WITHOUT THE WRITTEN CONSENT OF 45 ARCHITECTURE.MARK DESCRIPTION DATE 7/31/2024 4:09:02 PMA 201.c EXTERIOR ELEVATIONSSIMKINS DRIVE THRU BUILDING04.22.2024 23009SIMKINS NORTH PARK TRACT 2-BWHEAT DRIVEBOZEMAN, MT 59715SITE PLAN SUBMITTAL 1/8" = 1'-0"A 201.c 1 NORTH ELEVATION - Dependent 1 1/8" = 1'-0"A 201.c 2 SOUTH ELEVATION (WHEAT FRONTAGE) - SP 1/8" = 1'-0"A 201.c 3 EAST ELEVATION - Dependent 1 1/8" = 1'-0"A 201.c 4 WEST ELEVATION - Dependent 1 TAG WINDOW TYPE COUNT DIMENSIONS COMMENTSHEIGHTWIDTHSILL HEIGHTASSOSIATED LEVEL 11 1 4' - 0" 4' - 0" 3' - 0" FINISH FLOOR KALWALL ELEVATION - SOUTH - Dependent 1 KALWALL ELEVATION - EAST - Dependent 1