Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
063_A201.a_ExteriorElevations
GENERAL SHEET NOTES A. VERIFY SIDIING DIMENSIONS AND SELECTIONS WITH PEMB MANUFACTURER DRAWINGS B. REFER TO PEMB MANUFACTURER DRAWINGS FOR ROUGH OPENING DIMENSIONS AND LOCATIONS FIRST FLOOR 100' - 0" SECOND FLOOR 109' - 0" ABC 20' - 0"73' - 10"24' - 0"33' - 2"85' - 6"23' - 6" M3 1" 12"1" 12" EAVE HEIGHT 01 117' - 4" EAVE HEIGHT 02 119' - 0" M3 D 101H 101G 101C A.1A.25A.4A.7A.9B.2B.35B.4B.5B.7B.9 A.2A.3A.5A.8B.1B.3B.6B.8 M1 M2 M1 M2 DUST COLLECTOR, REF MEP MAIL SLOT, REF. PEMB MTL SCULPTURED RAKE BY PEMB STL PIPE BOLLARDSTL PIPE BOLLARD M1 M2 M1 FIRST FLOOR 100' - 0" SECOND FLOOR 109' - 0" 12345678 M3M1 M2 29' - 0 1/2"KALWALL 1" / 12"EAVE HEIGHT 01 117' - 4" EAVE HEIGHT 02 119' - 0" 7' - 9"15' - 2 1/2"7' - 9"7' - 9"15' - 2 1/2"7' - 9"7' - 9"15' - 3"7' - 9" 48' - 0"13' - 5 1/2"9' - 0"6' - 0"30' - 8 1/2" A 11' -0"A 11' -0"A 11' -0"A 11' -0"A 11' -0"A 11' -0"7' - 6"7' - 6"9 101B 101A 2.95.1 DOWNSPOUT BY PEMB, TYP. MTL GUTTER, BY PEMB 1" / 12" 104C 104A 101F 101N M1 102A STL PIPE BOLLARD MECH. EQUIPMENT, REF MEP STL PIPE BOLLARD FIRST FLOOR 100' - 0" SECOND FLOOR 109' - 0" 1 2 3 4 5 6 7 8 7' - 10"207' - 2"25' - 0" M329' - 0 1/2"WALL SIGNAGE = 86.5 SQFT 1" / 12"EAVE HEIGHT 01 117' - 4" EAVE HEIGHT 02 119' - 0" M1 M2 OUTFEED FROM CYBERSAW 7' - 9"7' - 9"15' - 2 1/2"7' - 9"7' - 9"15' - 2 1/2"7' - 9" B 3' -0"A 3' -0"A 3' -0" A 11' -0"A 11' -0"A 11' -0"A 10' -9"A 11' -0"7' - 6"7' - 6"A 10' -9" 7' - 9"7' - 9"14' - 2 1/2"8' - 9"8' - 0"7' - 0"7' - 9" 9 A 3' -0"101J 101D105A 2.9 5.1 M1 DOWNSPOUT BY PEMB, TYP. MTL GUTTER, BY PEMB MTL SCULPTURED RAKE BY PEMB 1" / 12" DUST COLLECTOR, REF MEP M3 MECH. EQUIPMENT, REF MEP MECH EQUIPMENT, REF MEP FIRST FLOOR 100' - 0" SECOND FLOOR 109' - 0" A B C 27' - 0"135' - 9 1/2"48' - 1"29' - 1 1/2"20' - 0" M2 M1 M3 SURFACE APPLIED BUILDING NUMBER KALWALL 1" 12" 1" 12" EAVE HEIGHT 01 117' - 4" EAVE HEIGHT 02 119' - 0" MAIL SLOT 8' - 0" B 11' -0"9' - 0"D 108A 101M 101L 101K 101E A.1 A.25 A.4 A.7 A.9 B.2 B.35 B.4 B.5 B.7 B.9A.2 A.3 A.5 A.8 B.1 B.3 B.6 B.8 M1 M2 M1 M2 6' - 0"M3 M1 MTL SCULPTURED RAKE BY PEMB STL PIPE BOLLARDSTL PIPE BOLLARD WH E A T D RIV E R AIL R O A D KEYPLAN PLAN NORTH MATERIALS M-1: CORRUGATED METAL SIDING FINISH-GALVALUME (NOT HIGHLY REFLECTIVE) M-2: RIBBED METAL SIDING FINISH-GALVANIZED (NOT HIGHLY REFLECTIVE) INTENDED EFFECT: M-3: WIDE PROFILE METAL SIDING FINISH-PAINTED BY MANF. COLOR-TBD PENDING OWNER SELECTION MCELROY MULTI-COR MCELROY U-PANEL MCELROY 5V TRANSPARENCY CALC: 120 SQFT / 4003 SQFT = 0.030 (3.0%) Date Project Number Sheet Name ALL DRAWN AND WRITTEN INFORMATION APPEARING SHALL NOT BE DUPLICATED, DISCLOSED OR OTHERWISE USED WITHOUT THE WRITTEN CONSENT OF 45 ARCHITECTURE REVISIONS ALL DRAWN AND WRITTEN INFORMATION APPEARING ON THIS DRAWING SHALL NOT BE DUPLICATED, DISCLOSED OR OTHERWISE USED WITHOUT THE WRITTEN CONSENT OF 45 ARCHITECTURE.MARK DESCRIPTION DATE 7/31/2024 4:13:40 PMA 201.a EXTERIOR ELEVATIONSSIMKINS LUMBER TRUSS SHOP07.31.2024 23009SIMKINS NORTH PARK TRACT 4-BWHEAT DRIVEBOZEMAN, MT 59715CONSTRUCTION DOCUMENTS 1/16" = 1'-0"A 201.a 1 EAST ELEVATION - SP 1/16" = 1'-0"A 201.a 2 NORTH ELEVATION - SP 1/16" = 1'-0"A 201.a 3 SOUTH ELEVATION (WHEAT FRONTAGE) - SP 1/16" = 1'-0"A 201.a 4 WEST ELEVATION - SP