Loading...
HomeMy WebLinkAbout033 - L 501 - Landscape DetailsSIDE VIEWBACK VIEWFRONT VIEW10"10"10"8'14"14"14"1"45°8"8"2"2"2"+/- 45"3"8"8"8"3"3"3"3"3"10" - 12"IN GROUND1L5011/2" = 1'-0"Directional Trail TotemNOTE: SIGNAGE DETAIL IS CONCEPTUAL ONLY.VERIFY SHOP DRAWINGS WITH CITY OF BOZEMANPARK WAYFINDING STANDARDS. DIRECTIONAL TOTEMTO DISPLAY TRAIL DIRECTIONS AND DISTANCES.DIRECTIONAL LABELS,TBD BY CITYCUSTOM FABRICATEDTIMBER POSTFINISHGRADE2L501NTSTypical Bench 6'CONCRETE PAVING.SEE CIVIL FORTYPICAL DETAIL.BENCH, SURFACE MOUNTWITH BOLTS PER MANUFACTURER SPEC.SEE L001 FORBENCH SPEC.3L501NTSPet Waste Station - In Ground MountMANUFACTURER:PET WASTE CO.1-800-738-7940www.petwasteco.comPINCH & PULL STATIONMODEL: SEE SHEET L001COLORS: SEE SHEET L001WETLAND EXTENTSPRE-FABRICATED STEEL BRIDGE.SHOP DRAWINGS ANDSTRUCTURAL DETAILS TO BEPROVIDED PRIOR TO CONSTRUCTION.CONCRETE FOOTING, PER CIVILPAVING PER PLANSEE PLANSWATERCOURSE3'-6"4'-9"MIN. 3'5'POURED CONCRETE BRIDGEDECKSTEEL RETAINING PLATEAGGREGATE BASE, PER CIVILPOURED CONCRETE BRIDGEDECK8'8'-8"SURFACE MOUNTED STEEL FEETNOTE:DETAIL IS FOR SCHEMATIC AND PRELIMINARY REVIEW PURPOSESONLY. CONTRACTOR SHALL ACQUIRE SHOP DRAWINGS PRIOR TOINSTALLATION.APPRX. 35'SEE PLANS ALSOTOP OF BRIDGE RAIL4L5011/4" = 1'-0"Wetland Bridge CrossingCOMPACTED SUBGRADEDECK RAILBRIDGE BEAM3'-6"NATIVE GRASS SEEDING PER PLANTREES AND SHRUBS TO BE PLANTED IN NATURALIZEDGROUPING PER PLAN. ALL TREES AND SHRUBS TO BEPLANTED ABOVE ANY PERMANENT WATER LINE.SEE CIVIL FOR DETENTION POND DEPTH AND GRADINGBOULDERS TO BE PLACED IN NATURALIZEDGROUPINGS PER PLAN ALONG DETENTIONPOND BANKMAX 4:1 SLOPE5L5013/16" = 1'-0"Detention Pond Cross Section (Typ.)LandscapeDetailsL 501design5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\meadow bridge\autocad\01_sheets\meadowbridge_os_standarddetails2021.dwg Meadow Bridge Open Space Bozeman, Montana BB/AVD TMS 01/10/24Preliminary PlatSubmittal03/06/25Preliminary PlatRC104/18/25Preliminary PlatRC2033