HomeMy WebLinkAbout023 - L 001 - Notes and SchedulesLANDSCAPE INSTALL NOTESGENERAL1.CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TOBEGINNING WORK. CALL 811.2.PLACE TREES, SHRUBS, AND PLANT MATERIAL WITH LANDSCAPE ARCHITECT PRESENT. LANDSCAPEARCHITECT TO BE NOTIFIED 48 HOURS IN ADVANCE.3.PLACE ALL BOULDERS WITH LANDSCAPE ARCHITECT PRESENT.LANDSCAPE ARCHITECT TO BE NOTIFIED 48HOURS IN ADVANCE.4.THE LOCATION OF ALL FLAGSTONE, STEPS, AND PATIO AREAS SHALL BE COORDINATED ON SITE WITH THELANDSCAPE ARCHITECT, WHEN APPLICABLE.5.ALL PLANT MATERIAL SHALL CONFORM TO THE CURRENT AMERICAN STANDARD FOR NURSERY STOCK.5.1.ALL DECIDUOUS TREES AND SHRUBS OUTSIDE OF DEDICATED PLANTING BEDS TO BE FENCED FORMIN. 2 YEARS5.2.ALL TREES AND SHRUBS OUTSIDE OF DEDICATED PLANTING BEDS TO HAVE 3' DIAMETER MULCH RING.5.3.ALL TREES TO BE STAKED FOR MIN. 2 YEARS.6.VERIFY ALL QUANTITIES. ILLUSTRATED PLAN SHALL DICTATE COUNT.7.NO SUBSTITUTIONS WILL BE ALLOWED WITHOUT THE WRITTEN CONSENT OF THE LANDSCAPE ARCHITECT.ALL REQUESTS SHOULD BE SUBMITTED TO DESIGN 5 LANDSCAPE ARCHITECTURE. 406-587-4873 ORTROY@DESIGN5LA.COM.8.LANDSCAPE ARCHITECT SHALL MEET WITH LANDSCAPE CONTRACTOR ON SITE, AT PREDETERMINEDINTERVALS TO DISCUSS PROGRESS, QUESTIONS, AND PRODUCT PLACEMENT.9.ALL EDGING SHALL BE 316" X 4" NATURAL STEEL ON STRAIGHT RUNS AND 18" X 4" NATURAL STEEL FORCURVED RUNS (OR AS OTHERWISE SPECIFIED IN DETAILS). TAC WELD TO #4 REBAR DRIVEN A MINIMUM OF18" DEEP.10.ALL AREAS ON SITE DISTURBED BY CONSTRUCTION ACTIVITIES NOT INDICATED ON LANDSCAPE PLAN ARETO BE RECLAIMED AND RE-ESTABLISHED TO PRE-DISTURBANCE CONDITION, VERIFY DISTURBANCE AREASIN FIELD. CONTRACTOR IS RESPONSIBLE FOR THE COST OF RESTORING ANY DISTURBANCE OUTSIDE OFTHE AGREED UPON LIMIT OF WORK BOUNDARY INDICATED ON THE PLANS.11.VERIFY ALL CUSTOM SEED MIXES. THOSE PROCURED THROUGH WILD HARVEST METHODS (WIND RIVERSEED, BLAKE NURSERY, BIG SKY SEED, GREAT BASIN SEED) REQUIRE ORDERING A MINIMUM OF ONE YEARIN ADVANCE OF INSTALLATION OR OTHER AS SPECIFIED BY SEED PROVIDER.12.ALL ROCK MULCH IS TO BE WASHED PRIOR TO INSTALLATION13.PRIOR TO CONSTRUCTION A PRE-INSTALLATION MEETING WITH THE CITY OF BOZEMAN WATER CONSERVATION DIVISION IS REQUIRED. AFTER INSTALLATION OR AMENDMENT OF ALL SOILS REQUIRED BYTHE APPLICATION APPROVAL A SOILS APPROVAL CERTIFICATION IS REQUIRED. SEE CITY OF BOZEMANLANDSCAPE AND IRRIGATION CODE.SOIL PREP14.ALL BACKFILLED AND DISTURBED AREAS TO BE RAKED SMOOTH. ALL ROCKS GREATER THAN 2" DIAMETER,STICKS, ROOTS, ALL CONSTRUCTION DEBRIS AND ALL OTHER EXTRANEOUS MATTER TO BE PICKED UP AND REMOVED FROM SITE BEFORE SOIL AMENDMENTS ARE ADDED.15.EXISTING SOIL AREA NOT TO BE DISTURBED SHALL BE PROTECTED FROM COMPACTION, DISTURBANCEAND CONTAMINATION DURING CONSTRUCTION.16.SEED AREAS(WHEN APPLICABLE)- LIGHTLY SCARIFY SURFACE OR LIGHTLY TILL AND RAKE SMOOTH PRIORTO ADDING SOIL.16.1.SEEDED AREA SOIL REQUIREMENTS: EXCAVATE TO 6" DEPTH AND BACKFILL WITH AMENDED TOPSOIL PER CITY OF BOZEMAN SOIL REQUIREMENTS. HYDRO-SEED WITH *FLEXTERRA TACKIFIER*.17.SOD AREAS(WHEN APPLICABLE) - LIGHTLY SCARIFY SURFACE OR LIGHTLY TILL AND RAKE SMOOTH PRIORTO ADDING SOIL.17.1.SOD AREA SOIL REQUIREMENTS: EXCAVATE TO 6" DEPTH AND BACKFILL WITH AMENDED TOP SOILPER CITY OF BOZEMAN SOIL REQUIREMENTS. TOPSOIL SHALL BE DRUM ROLLED OR TRACK-PACKEDAND GRADED SMOOTHLY AND EVENLY PRIOR TO LAYING SOD. RAKE SMOOTH TO MATCH FINALGRADING PLAN.18.ALL TREES, SHRUBS AND PERENNIALS OUTSIDE DEDICATED PLANTING BEDS TO BE EXCAVATED 2x THESIZE OF THE ROOT BALL MINIMUM OR TO 6" DEPTH WHICH EVER IS LARGER. SCARIFY SIDES AND BOTTOMTO REMOVE GLAZING. BACKFILL WITH AMENDED TOP SOIL PER CITY OF BOZEMAN SOIL REQUIREMENTS.19.ALL PLANTING BEDS TO BE EXCAVATED MIN. 18" DEEP. SCARIFY SIDES AND BOTTOM TO REMOVE GLAZING.BACKFILL WITH AMENDED TOP SOIL PER CITY OF BOZEMAN SOIL REQUIREMENTS (COMBINED SETTLEDDEPTH OF 18"). RAKE SMOOTH TO MATCH FINISH GRADE.20.DO NOT SCARIFY IF SOIL IS FROZEN, MUDDY OR EXCESSIVELY WET.IRRIGATION21.PERMANENT UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED AT TIME OF LANDSCAPE INSTALLATION. MAIN LINE, LATERAL LINE, AND SPRINKLERS NOT BURIED AT TIME OF PROJECT COMPLETION WILL NOT BE ACCEPTED.22.IRRIGATION TO BE INSTALLED IN ACCORDANCE WITH ALL STATE AND LOCAL CODES AND ORDINANCES.23.GENERAL CONTRACTOR RESPONSIBLE FOR SUPPLYING POWER TO IRRIGATION WELL(S), PUMPS ANDCONTROLS. GC TO COORDINATE POWER NEEDS WITH IRRIGATION CONTRACTOR.SYMBOLDESCRIPTIONPRODUCTQUAN.SITE MATERIAL SCHEDULE - OPEN SPACEASPHALTTRAILAPPROX.17,307 SFVERIFY W/CIVILASPHALT TRAILS THROUGHOPEN SPACE AREAS. SEE CIVILFOR DETAILSCONTACTBY CONTRACTOR565LFSPADE CUTEDGINGSPADE CUT NATURAL EDGE @ ALLBLVD TREES. SEE L500 DETAIL 7BY CONTRACTORPER PLANSHREDDEDCEDAR MULCHSHREDDED CEDAR MULCHSPREAD @ 3" DEPTH.1,425SFBY CONTRATORCONCRETEWALKS:SEE CIVILPADS:100 SFCONCRETE SIDEWALKS AND BENCHPADS; BATCH CONCRETE W/ BROOMFINISHSEE CIVIL FOR DETAILSBY CONTRACTORBENCH2PET WASTESTATIONPET WASTE CO. DOG WASTE STATIONWITH PINCH-N-PULL BAG SYSTEM;MODEL #PWC-022-BLK; MATTE BLACKCOLOR; IN-GROUND MOUNT. SEE L501DETAIL3PET WASTE CO.1-800-738-7940www.petwasteco.com4SITE AMENITY SCHEDULE - OPEN SPACECONTACTSYMBOLDESCRIPTIONQTYPRODUCTPEDESTRIANBRIDGE8' WIDE X APROX. 45' LONGPRE-FABRICATED STEEL BRIDGE.VERIFY DETAILS WITH SHOPDRAWINGS. SEE L501, DETAIL 4TRUE NORTH STEELBILLINGS, MT406-532-71031SELECTION: BESSEMER BENCH WITHBACKMODEL #BE26COLOR: POWDER COATED MATTEBLACKINSTALL: SURFACE MOUNT PERMANUFACTURER DETAIL: SEE SHEETL501: DETAIL 2KEYSTONE RIDGE DESIGNS, INC.670 MERCER RDBUTLER, PA 16001-1840(724) 284 1213C.WHITE@KEYSTONERIDGEDESIGNS.COM13FLAT WILLOWMOSS ROCKBOULDERLICHEN COVERED LANDSCAPEBOULDERS, ROUND CHARACTER; MIN.3' DIAMETERSEE SHEET L500: DETAIL 11SELECT STONE1-888-237-1000INFO@SELECTSTONE.COMDIRECTIONALTOTEM5DIRECTIONAL TOTEM TO DISPLAY TRAILDIRECTIONS AND DISTANCES. SIGNAGE TO BESELECTED BY OWNER AND COMPLY WITHCITY OF BOZEMAN WAYFINDING STANDARDS;SEE SHEET L501: DETAIL 1SYMBOLDESCRIPTIONQTYPRODUCTSIGNAGE SCHEDULE - OPEN SPACESYMBOLDESCRIPTIONCONTACTPRODUCTQUANTITYPRELIMINARY IRRIGATION SCHEDULEIRRIGATIONSLEEVING4" SCH. 40 PVC SLEEVINGTO BE PLACED UNDERROADS FOR IRRIGATIONLINES.N/APER PLANIRRIGATIONCONNECTIONPOINT (METERPIT)1N/A**NOTE:1.ALL LANDSCAPE IRRIGATION TO BE COORDINATED WITH LANDSCAPE CONTRACTOR, G.C., MEP,ARCH., AND PLUMBER.---CONNECTION POINT TO BE DETERMINED BY OTHERS, GRAPHICALLY SHOWN FOR INTENTONLY2.GC TO PROVIDE ANY POWER NEEDS TO WELL PUMPS AND METERPITS.3.IRRIGATION SLEEVING TO BE PROVIDED BY CIVIL CONTRACTOR/GC; SET SLEEVES UNDER ROADSPER PLAN COORDINATE WITH LANDSCAPE/IRRIGATION INSTALLER PRIOR TO POURING ROADS ORCONCRETE AND SETTING BOULDER RETAINING WALLS4.SEE IRRIGATION PLAN FOR MORE INFORMATION SHEETS L600-L701CPIRRIGATION METER PITLOCATION SHALL BEVERIFIED ON SITE WITHIRRIGATION CONTRACTORAND LANDSCAPEARCHITECT. SEE NOTESBELOW.Notes andSchedulesL 001design5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\meadow bridge\autocad\01_sheets\meadowbridge_os_landscape.dwg
Meadow Bridge Open Space
Bozeman, Montana
BB/AVD TMS
01/10/24Preliminary PlatSubmittal03/06/25Preliminary PlatRC104/18/25Preliminary PlatRC2023