Loading...
HomeMy WebLinkAbout004 - C1.2 - LEGEND, NOTES AND ABBREVIATIONS LINETYPES ABBREVIATIONS � � EXISTING PROPOSED AC = FINISHED GRADE AT ASPHALT PC = POINT OF CURVATURE ' } SANITARY SEWER ss �s BC = FINISHED GRADE AT BUILDING CORNER PI = POINT OF INTERSECTION STORM DRAIN � , s� Sp Sp BRK = GRADE BREAK POC = POINT ON CURVE " WATER w w w yy yy yy BFV = BUTTERFLY VALVE PRC = POINT OF REVERSE CURVE CURB AND GUTTER BVC = BEGIN VERTICAL CURVE PT = POINT OF TANGENCY _ _ _ _ _ EDGE OF EX ASPHALT _ _ _ _ _ _ CS = CURB STOP PVI = POINT OF VERTICAL INTERSECTION `'__ J ' " EDGE OF ASPHALT - — _ EDGE OF GRAVEL _ _ _ _ _ _ _ EDGE oF Ex GRAVE� _ _ _ _ _ _ _ EA = FINISHED GRADE AT EDGE OF ASPHALT RED = REDUCER � EC = FINISHED GRADE AT EDGE OF CONCRETE RT = RIGHT � FENCE - BARBED WIRE x x x x = EVC = END VERTICAL CURVE SD = STORM DRAIN FENCE - CHAINLINK/ o 0 0 WOVEN WIRE EW = FINISHED GRADE AT EDGE OF WALK SDI = STORM DRAIN INLET FENCE - VINYL v v v v EX = APPROXIMATE EXISTING ELEVATION SDMH = STORM DRAIN MANHOLE FENCE - WOOD n n FL = FINISHED GRADE AT FLOWLINE SRVC = SERVICE r�������T�������i FIBER OPTIC Fo Fo r u r u +����0 N'•"'���A,,,N�'��� FT = FEET SS = SANITARY SEWER �.`�'� '��,;9� GAS PIPELINE - FG = FINISHED GRADE SSMH = SANITARY SEWER MANHOLE : �ROBERT PAUL''�, = ��; EGEBERG 's,�� -�: 60177PE :W� LIQUID PROPANE PIPELINE GR = EXISTING GRADE AT GROUND TC = FINISHED GRADE AT TOP BACK OF CURB `�F'��,,���EN5�0;=����` .S ,,, „ G� OIL PIPELINE o�� o�� GV = GATE VALVE TW = FINISHED GRADE AT TOP OF WALL ��~���;A;�N���+` UNDERGROUND POWER ' P P P P P HP = HIGH POINT WTR = WATER OVERHEAD POWER oHP oHP LF = LINEAL FOOT (TYP.) = TYPICAL TELEPHONE LT = LEFT z TELEVISION/CABLE � g g KEYNOTE CALL OUT } a a a CONTOUR - - - - - - - - - - 3157 - - - - - - - - - - 3157 � (SEE KEYNOTE LEGEND) 0 v a a � w � � IRRIGATION CONDUIT � � � = Q J J Z N N � � DEMO AREA � Q o 0 PROPOSED ASPHALT � � � � ' ' PROPOSED CONCRETE � � � � � � ' � � � .� � � � � ' � � � � Q a � U � PROPOSED GRAVEL � o � w �, 0 O N (, �� m � N N � GRADING PLAN o o Q o � 01 CATCH CURB m � � CATCH CURB �TOP OF CURB - 0.46' = LIP w � � 02 SPILL CURB TOP OF CURB - 0.51' = FLOWLINE � a v �, � TRANSITION FROM CATCH TOP OF CURB - 0.62' = LIP � TO SPILL CURB SPILL CURB � TOP OF CURB - 0.57' = FLOWLINE 0 TAPER CURB HEAD 3' Z SYM BOLS Q H D EXISTING WATER REDUCER ❑W WATER METER Tg TELEPHONE BOX � TRANSFORMER � IRRIGATION VALVE � 1■■1 � PROPOSED WATER REDUCER � YARD HYDRANT � TELEPHONE MANHOLE � POWER MANHOLE � BUSH � 1■■1 S EXISTING SANITARY SEWER MANHOLE m TELEPHONE PEDESTAL EM POWER METER %�� CONIFEROUS TREE 0 � EXISTING WATER VALVE O z O PROPOSED SANITARY SEWER MANHOLE �O COMMUNICATIONS MANHOLE � POWER POLE v, N PROPOSED WATER VALVE �� DECIDUOUS TREE _ ,� � COMMUNICATIONS PEDESTAL �GUYWIRE � � EXISTING FIRE HYDRANT PROPOSED SANITARY SEWER CLEAN OUT SIGNAL POLE V� � m cn F ��Xy � � Z � F I B E R O P T I C P E D E S T A L � L I G H T P O L E W � c n O � PROPOSED FIRE HYDRANT �D EXISTING STORM DRAIN MANHOLE O FOUND CORNER MONUMENT AS NOTED �1� w � S G� GAS MANHOLE � SIGN V z o Q �O° EXISTING CURB STOP � PROPOSED STORM DRAIN MANHOLE � GAS METER � SET CORNER MONUMENT, REBAR WITH CAP Q a � j z m w � PROPOSED CURB STOP ❑ EXISTING CATCH BASIN � GAS WELL �° BOLLARD � BENCHMARK �"� � O m 0 ❑ EXISTING MONUMENT BOX � m SECTION QUARTER CORNER w Q a FDC FIRE DEPT. CONNECTION � PROPOSED CATCH BASIN pa GAS VALVE ■ PROPOSED MONUMENT BOX � aw � z z W� WELL � PROPOSED ROOF DRAIN EJB ELECTRIC JUNCTION BOX IRR IRRIGATION BOX �Q SECTION CORNER � °C a a W EXISTING WATER MANHOLE � 0 0 w � Q Q P R O P O S E D S T O R M D R A I N C L E A N O U T � E L E C T R I C P E D E S T A L O H Q � w z O NOTE: Q Q � � 0 Z -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE � � � N w ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE&TELEVISION) MAY NOT BE � � � O W STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. a ,_, m J -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 7TH EDITION, APRIL, 2021, AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS, DATED OCTOBER,2024. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. � t