Loading...
HomeMy WebLinkAbout018 - Appendix N - Sewer Report MEADOW BRIDGE SUBDIVISION Project 05021.28 Bozeman, MT JANUARY 2025 January 2025 Project No. 05021.28 SANITARY SEWER DESIGN REPORT FOR MEADOW BRIDGE SUBDIVISION BOZEMAN, MONTANA 11.1 PROBLEM DEFINED This report describes the existing and proposed sanitary sewer mains which have been proposed to serve the new Meadow Bridge Subdivision in Bozeman, MT. The water and sanitary sewer infrastructure to serve the proposed development is from the City of Bozeman and is located within the right-of-way surrounding the project site. A new sanitary sewer main extension within the proposed Alley A will serve the lots adjacent to Alley A and will connect to the existing sanitary sewer main on Parkway Avenue. A new sanitary sewer main extension within Last Loop Drive and south to Alley B will serve the lots adjacent to Last Loop Drive and Alley B. Lastly, a sanitary sewer main extension within South 23rd Avenue will serve the lots adjacent to that road. The other lots will have services extended from existing sanitary sewer mains within South 23rd Avenue and Last Loop Drive. 11.12 DESIGN CONDITIONS The anticipated existing and proposed hydraulics are discussed in Section 11.24 Hydraulic Capacity. The capacity of the proposed gravity sewer main extension will be based on the estimated demands per the estimated additional dwelling units (DU) and people per DU utilizing City of Bozeman Design and Construction standards (Draft 7/1/2024). 11.13 IMPACT ON EXISTING WASTEWATER FACILITIES The proposed sewer main extension will convey sewage away from the proposed lots and into the City of Bozeman’s sanitary sewer collection system for further conveyance and ultimately treatment. Sanitary Sewer Design Report Page 2 of 5 January 2025 11.14 PROJECT DESCRIPTION The proposed site will utilize existing 8-inch PVC sanitary sewer mains within South 23rd Avenue, Last Loop Drive, and Parkway Avenue. A new 8-inch PVC sanitary sewer main is proposed to extend within city right-of-way within Alley A, Alley B, Last Loop Drive, and South 23rd Avenue, to serve the lots adjacent to those alleys/roads. The new 8-inch sanitary sewer main in Alley A will connect to the existing sanitary sewer main within Parkway Avenue with a new manhole connection. The new 8-inch sanitary sewer main in Last Loop Drive and Alley B will extend from an existing manhole in Last Loop Drive. The 8-inch sanitary sewer main extension in South 23rd Avenue will extend from an existing manhole in South 23rd Avenue which is immediately conveyed east within an existing alley. The existing sanitary sewer mains and proposed extensions will serve the proposed subdivision. The sanitary sewer collection system and treatment will be provided by the City of Bozeman. 11.15 DRAWINGS Enclosed are copies of the technical plans and specifications. 11.16 DESIGN CRITERIA The sanitary sewer main extensions have been designed, and will be installed, in accordance with the criteria set forth in the City of Bozeman Design and Construction standards and Circular DEQ-2. The sanitary sewer main extensions have been sized to flow at no more than 75-percent of full capacity at peak hour conditions. Minimum main line slopes, complying with Circular DEQ-2, have been assumed to be conservative and a Manning’s friction factor of 0.013 has been utilized per the City of Bozeman requirements. The design flow is based on the City of Bozeman guidelines for residential areas of 64.4 gallons per capita per day (gpcd) at 2.17 people/DU. A base infiltration rate of 150-gallons/acre/day has been applied to the gross area of the development. Hydraulic calculations have been included in Section 11.24 Hydraulic Capacity. 11.17 SITE INFORMATION The existing project site is approximately 25.32-acres and is currently undeveloped. The site is located within Gallatin County and is surrounded by existing developments. There are no known sources of pollution that may influence the quality of water supply or interfere with the effective operation of the water works or sanitary sewer collection system. There are no known or confirmed geologic hazards/unusual features for this site. Recent geotechnical borings indicate that topsoil exists in depths from zero (0) inches to twelve (12) inches throughout the site. The topsoil layer is underlain by poorly graded Sanitary Sewer Design Report Page 3 of 5 January 2025 gravel at an average depth of one (1) foot. Groundwater was encountered during the geotechnical exploration and subsequent groundwater monitoring at an average depth of 6 feet. The approximate groundwater flow is northerly. 11.18 ALTERNATIVE SELECTION/ANALYSIS No alternatives were considered as the property is within the Bozeman City limits and conventional gravity sanitary sewer collection is feasible. 11.19 ENVIRONMENTAL IMPACTS The environment is improved by connecting to the City of Bozeman sanitary sewer collection system rather than individual or combined onsite disposal systems which have the potential to impact ground and surface waters. 11.24 HYDRAULIC CAPACITY 11.24.1 FLOW DEFINITION AND INDENTIFICAITON An Excel spreadsheet has been prepared to analyze the existing and proposed sanitary sewer mains. The average daily demand (ADD) is based on the average daily usage of 64.4 GPCD and 2.17 people/DU. Dwelling units per lot were assumed based on lot sizes and feasibility of construction based on setbacks and allowed lot coverages. Lots greater than 9,000 square feet (SF) were assigned 3 DU, lots between 6,000 SF and 9,000 SF were assigned 2 DU, and lots less than 6,000 SF were assigned 1 DU. Peaking factors, based on the formula below, were applied to the calculated ADD to calculate the Peak Hour Demand (PHD). The sanitary sewer demand for the subdivision is summarized in Table 1 below and additional calculations are provided in Appendix A. Sanitary Sewer Design Report Page 4 of 5 January 2025 Table 1. Sanitary Sewer Demand Summary Sanitary Sewer Discharge Location ADD (gpm) PHD (gpm) Alley A 3.60 14.29 Alley B 0.63 2.52 Last Loop Drive 4.58 18.10 S 23rd Ave 0.64 2.53 Existing Alley 1.05 4.19 Total 10.49 41.62 11.24.2 HYDRAULIC CAPACITY FOR WASTEWATER FACILITIES TO SERVE EXISTING COLLECTION SYSTEM This section is not applicable. 11.24.3 HYDRAULIC CAPACITY FOR WASTEWATER FACILITIES TO SERVE NEW COLLECTION SYSTEM The designated flows calculation in section 11.24.1 Flow Definitions and Identification will be conveyed from to the City of Bozeman’s sanitary sewer collection system via gravity. The capacity of the existing/proposed 8-inch sewer mains at the minimum 0.4 percent design slope is 344-gpm. Assuming the pipe does not exceed 75 percent of full flow capacity, then the available capacity at 75 percent of full flow is 258-gpm. The available pipe capacity exceeds the calculated peak hour demand at every discharge location, so the existing/proposed sewer mains are appropriately sized to convey the anticipated sewer demands. See Appendix B for pipe hydraulic capacity calculations. The City of Bozeman will convey the designated flows to their wastewater facility within their wastewater collection system. Inflow and Infiltration (I&I) is assumed to be minor relative to the sewage flows since the proposed sewer main extension will utilize standard PVC push-on joints. However, to be conservative, 150 gal/acres/day demand has been added to the available main capacity to account for potential I&I. Manholes will not be installed in low points where surface water has the potential to pool above the rim and seep into the sewer collection system. Sanitary Sewer Design Report Page 5 of 5 January 2025 Should you have any questions, I can be reached at 406-922-4308 to further discuss this report. Sincerely, Bobby Egeberg, PE Bozeman Land Development Manager MEADOW BRIDGE SUBDIVISION Project 05021.28 APPENDIX A SANITARY SEWER DEMANDS Lot Size (sf) Size (acres)Sewer Service Discharge LocationNumber of Dwelling UnitsNumber of People per Dwelling UnitSewer Demand (gpcd)Infiltration (gal/acres/day)ADD without Infiltration (gpd)ADD with Infiltration (gpd)ADD with Infiltration (gpm)PHD (gpm)111,2210.258Alley A32.1764.4150419.24457.880.321.26211,7990.271Alley A32.1764.4150419.24459.870.321.26312,8820.296Alley A32.1764.4150419.24463.600.321.27410,2000.234Alley A32.1764.4150419.24454.370.321.26510,2000.234Alley A32.1764.4150419.24454.370.321.26610,2000.234Alley A32.1764.4150419.24454.370.321.26711,6950.268Alley A32.1764.4150419.24459.520.321.2689,0170.207Alley A32.1764.4150419.24450.290.311.2698,2500.189Alley A22.1764.4150279.50307.910.210.84108,8240.203Alley A22.1764.4150279.50309.880.220.84119,0390.208Alley A32.1764.4150419.24450.370.311.261210,3720.238Alley A32.1764.4150419.24454.960.321.261314,0540.323Last Loop Drive32.1764.4150419.24467.640.321.271412,4570.286Last Loop Drive32.1764.4150419.24462.140.321.261512,5060.287Last Loop Drive32.1764.4150419.24462.310.321.261612,3960.285Last Loop Drive32.1764.4150419.24461.930.321.261712,4110.285Last Loop Drive32.1764.4150419.24461.980.321.26189,6210.221Last Loop Drive32.1764.4150419.24452.370.311.26199,5100.218Last Loop Drive32.1764.4150419.24451.990.311.26208,5120.195Last Loop Drive22.1764.4150279.50308.810.210.84218,7910.202Last Loop Drive22.1764.4150279.50309.770.220.84229,9410.228Last Loop Drive32.1764.4150419.24453.480.311.26236,6820.153Last Loop Drive22.1764.4150279.50302.510.210.84246,4790.149Alley B22.1764.4150279.50301.810.210.84256,4790.149Alley B22.1764.4150279.50301.810.210.84266,4790.149Alley B22.1764.4150279.50301.810.210.842711,9290.274Last Loop Drive32.1764.4150419.24460.320.321.26286,3130.145Last Loop Drive22.1764.4150279.50301.230.210.84294,8840.112Last Loop Drive12.1764.4150139.75156.570.110.42306,4540.148Last Loop Drive22.1764.4150279.50301.720.210.84316,1750.142Last Loop Drive22.1764.4150279.50300.760.210.84325,5270.127Last Loop Drive12.1764.4150139.75158.780.110.42335,1980.119Last Loop Drive12.1764.4150139.75157.650.110.42345,8500.134Last Loop Drive12.1764.4150139.75159.890.110.43354,0000.092S 23rd Ave12.1764.4150139.75153.520.110.42364,0000.092S 23rd Ave12.1764.4150139.75153.520.110.42374,0000.092S 23rd Ave12.1764.4150139.75153.520.110.42384,0000.092S 23rd Ave12.1764.4150139.75153.520.110.42394,0000.092S 23rd Ave12.1764.4150139.75153.520.110.42404,0000.092S 23rd Ave12.1764.4150139.75153.520.110.42416,0020.138Existing Alley22.1764.4150279.50300.160.210.84426,0020.138Existing Alley22.1764.4150279.50300.160.210.84436,0020.138Existing Alley22.1764.4150279.50300.160.210.84446,0020.138Existing Alley22.1764.4150279.50300.160.210.84458,3950.193Existing Alley22.1764.4150279.50308.400.210.84Total368,750 8.465 N/A 99 2.17 64.4 150 13835.05 15104.85 10.49 41.62Meadow Bridge Sanitary Sewer Demands Sanitary Sewer Discharge Location ADD (gpm) PHD (gpm)Alley A3.6014.29Alley B0.632.52Last Loop Drive4.5818.10S 23rd Ave0.642.53Existing Alley1.054.19 Sanitary Sewer Demand SummaryMeadow Bridge Subdivision MEADOW BRIDGE SUBDIVISION Project 05021.28 APPENDIX B HYDRAULIC CALCULATIONS Project: Meadow Bridge SubdivisionDate: 01/06/2025Capacity Calculations - Alley A8" Pipe Flowing Full Capacity0.77cfs8" Pipe Flowing Full Capacity344gal/minQ/Qfill @ 75% full, 0.75per nomographCapacity @ 75% full258gal/minSystem DemandDESIGNATIONR-3 ZoningDemandResidential Demand4751gal/day3.30gal/minPeaking Factor (per City of Bozeman formula)4.24Peak Hourly Flow13.99gal/minInfiltration at 150 gal/acres/day426gal/dayInfiltration gal/min0.30gal/minTotal Peak Hourly Flow plus Infiltration14.29gal/minResultQ/Qfull based on peak hour0.04Percent Full for 8" From Nomograph at peak hour16%Alley A Service Area Project: Meadow Bridge SubdivisionDate: 01/06/2025Capacity Calculations - Alley B8" Pipe Flowing Full Capacity0.77cfs8" Pipe Flowing Full Capacity344gal/minQ/Qfill @ 75% full, 0.75per nomographCapacity @ 75% full258gal/minSystem DemandDESIGNATIONR-3 ZoningDemandResidential Demand838gal/day0.58gal/minPeaking Factor (per City of Bozeman formula)4.24Peak Hourly Flow2.47gal/minInfiltration at 150 gal/acres/day67gal/dayInfiltration gal/min0.05gal/minTotal Peak Hourly Flow plus Infiltration2.52gal/minResultQ/Qfull based on peak hour0.01Percent Full for 8" From Nomograph at peak hour5%Alley B Service Area Project: Meadow Bridge SubdivisionDate: 01/06/2025Capacity Calculations - Last Loop Drive8" Pipe Flowing Full Capacity0.77cfs8" Pipe Flowing Full Capacity344gal/minQ/Qfill @ 75% full, 0.75per nomographCapacity @ 75% full258gal/minSystem DemandDESIGNATIONR-3 ZoningDemandResidential Demand6009gal/day4.17gal/minPeaking Factor (per City of Bozeman formula)4.24Peak Hourly Flow17.69gal/minInfiltration at 150 gal/acres/day583gal/dayInfiltration gal/min0.40gal/minTotal Peak Hourly Flow plus Infiltration18.10gal/minResultQ/Qfull based on peak hour0.05Percent Full for 8" From Nomograph at peak hour18%Last Loop Drive Service Area Project: Meadow Bridge SubdivisionDate: 01/06/2025Capacity Calculations - S 23rd Ave8" Pipe Flowing Full Capacity0.77cfs8" Pipe Flowing Full Capacity344gal/minQ/Qfill @ 75% full, 0.75per nomographCapacity @ 75% full258gal/minSystem DemandDESIGNATIONR-3 ZoningDemandResidential Demand838gal/day0.58gal/minPeaking Factor (per City of Bozeman formula)4.24Peak Hourly Flow2.47gal/minInfiltration at 150 gal/acres/day83gal/dayInfiltration gal/min0.06gal/minTotal Peak Hourly Flow plus Infiltration2.53gal/minResultQ/Qfull based on peak hour0.01Percent Full for 8" From Nomograph at peak hour5%S 23rd Ave Service Area Project: Meadow Bridge SubdivisionDate: 01/06/2025Capacity Calculations - Existing Alley8" Pipe Flowing Full Capacity0.77cfs8" Pipe Flowing Full Capacity344gal/minQ/Qfill @ 75% full, 0.75per nomographCapacity @ 75% full258gal/minSystem DemandDESIGNATIONR-3 ZoningDemandResidential Demand1397gal/day0.97gal/minPeaking Factor (per City of Bozeman formula)4.24Peak Hourly Flow4.11gal/minInfiltration at 150 gal/acres/day112gal/dayInfiltration gal/min0.08gal/minTotal Peak Hourly Flow plus Infiltration4.19gal/minResultQ/Qfull based on peak hour0.01Percent Full for 8" From Nomograph at peak hour8%Existing Alley Service Area