Loading...
HomeMy WebLinkAbout018 - Appendix N - Sewer Report MEADOW BRIDGE SUBDIVISION Project 05021.28 Bozeman, MT ��.......... :'���.�•N'TA•�:���'': : � •• •• * : . : •: . ; .•' ,T PAU L�.; ; • •.,,,• ~ S • • �,.r� . • : f' / --.-"';'"_.,.:i ' `=L-'^ N . 60177PE ' `: •�pi �;E�. ��� �Ay"��� �� � � L w�' � ��'��'•�!CENSE�•'G���' . s ......... . •.��S�ONAL����: '•••.......•. Community Planning Surveying+ Mapping+GIS+Drone Civil InfrastructureEngineering .1ANUARY 2025 Multimodal Transportation Engineering Water and Wastewater Utility Design and Operations Landscape Architecture+ Placemaking Construction Management and Inspection Communications+Public Engagement+Visualizations san e January 2025 Project No. 05021.28 SANITARY SEWER DESIGN REPORT FOR MEADOW BRIDGE SUBDIVISION BOZEMAN, MONTANA 11.1 PROBLEM DEFINED This report describes the existing and proposed sanitary sewer mains which have been proposed to serve the new Meadow Bridge Subdivision in Bozeman, MT. The water and sanitary sewer infrastructure to serve the proposed development is from the City of Bozeman and is located within the right-of-way surrounding the project site. A new sanitary sewer main extension within the proposed Alley A will serve the lots adjacent to Alley A and will connect to the existing sanitary sewer main on Parkway Avenue. A new sanitary sewer main extension within Last Loop Drive and south to Alley B will serve the lots adjacent to Last Loop Drive and Alley B. Lastly, a sanitary sewer main extension within South 23�d Avenue will serve the lots adjacent to that road.The other lots will have services extended from existing sanitary sewer mains within South 23�a Avenue and Last Loop Drive. 11.12 DESIGN CONDITIONS The anticipated existing and proposed hydraulics are discussed in Section 11.24 Hydraulic Capacity.The capacity of the proposed gravity sewer main extension will be based on the estimated demands per the estimated additional dwelling units (DU) and people per DU utilizing City of Bozeman Design and Construction standards (Draft 7/1/2024). 11.13 IMPACT ON EXISTING WASTEWATER FACILITIES The proposed sewer main extension will convey sewage away from the proposed lots and into the City of Bozeman's sanitary sewer collection system for further conveyance and ultimately treatment. Intelligent Infrastructure. Enduring Communities 11.14 PROJECT DESCRIPTION The proposed site will utilize existing 8-inch PVC sanitary sewer mains within South 23rd Avenue, Last Loop Drive, and Parkway Avenue. A new 8-inch PVC sanitary sewer main is proposed to extend within city right-of-way within Alley A, Alley B, Last Loop Drive, and South 23rd Avenue, to serve the lots adjacent to those alleys/roads.The new 8-inch sanitary sewer main in Alley A will connect to the existing sanitary sewer main within Parkway Avenue with a new manhole connection.The new 8-inch sanitary sewer main in Last Loop Drive and Alley B will extend from an existing manhole in Last Loop Drive.The 8-inch sanitary sewer main extension in South 23rd Avenue will extend from an existing manhole in South 23rd Avenue which is immediately conveyed east within an existing alley.The existing sanitary sewer mains and proposed extensions will serve the proposed subdivision. The sanitary sewer collection system and treatment will be provided by the City of Bozeman. 11.15 DRAWINGS Enclosed are copies of the technical plans and specifications. 11.16 DESIGN CRITERIA The sanitary sewer main extensions have been designed, and will be installed, in accordance with the criteria set forth in the City of Bozeman Design and Construction standards and Circular DEQ-2.The sanitary sewer main extensions have been sized to flow at no more than 75-percent of full capacity at peak hour conditions. Minimum main line slopes, complying with Circular DEQ-2, have been assumed to be conservative and a Manning's friction factor of 0.013 has been utilized per the City of Bozeman rec{uirements.The design flow is based on the City of Bozeman guidelines for residential areas of 64.4 gallons per capita per day (gpcd) at 2.17 people/DU. A base infiltration rate of 150-gallons/acre/day has been applied to the gross area of the development. Hydraulic calculations have been included in Section 11.24 Hydraulic Capacity. 11.17 SITE INFORMATION The existing project site is approximately 25.32-acres and is currently undeveloped. The site is located within Gallatin County and is surrounded by existing developments. There are no known sources of pollution that may influence the quality of water supply or interfere with the effective operation of the water works or sanitary sewer collection system. There are no known or confirmed geologic hazards/unusual features for this site. Recentgeotechnical borings indicatethattopsoil exists in depths from zero (0) inches to twelve (12) inches throughoutthe site.The topsoil layer is underlain by poorly graded Sanitary Sewer Design Report Page 2 of 5 January 2025 gravel at an average depth of one (1) foot. Groundwater was encountered during the geotechnical exploration and subsequent groundwater monitoring at an average depth of 6 feet.The approximate groundwater flow is northerly. 11.18 ALTERNATIVE SELECTION/ANALYSIS No alternatives were considered as the property is within the Bozeman City limits and conventional gravity sanitary sewer collection is feasible. 11.19 ENVIRONMENTAL IMPACTS The environment is improved by connecting to the City of Bozeman sanitary sewer collection system rather than individual or combined onsite disposal systems which have the potential to impact ground and surface waters. 11.24 HYDRAULIC CAPACITY 11.24.1 FLOW DEFINITION AND INDENTIFICAITON An Excel spreadsheet has been prepared to analyze the existing and proposed sanitary sewer mains. The average daily demand (ADD) is based on the average daily usage of 64.4 GPCD and 2.17 people/DU. Dwelling units per lot were assumed based on lot sizes and feasibility of construction based on setbacks and allowed lot coverages. Lots greater than 9,000 square feet (SF) were assigned 3 DU, lots between 6,000 SF and 9,000 SF were assigned 2 DU, and lots less than 6,000 SF were assigned 1 DU. Peaking factors, based on the formula below, were applied to the calculated ADD to calculate the Peak Hour Demand (PHD). Qmux _ 18+P1�1 — (P =Population/thousands) Qctve 18+Pi�Z The sanitary sewer demand for the subdivision is summarized in Table 1 below and additional calculations are provided in Appendix A. Sanitary Sewer Design Report Page 3 of 5 January 2025 Table 1. Sanitary Sewer Demand Summary ADD PHD Sanitary Sewer Discharge �ocation � pm) ( pm) Alle A 3.60 14.29 Alle B 0.63 2.52 Last Loop Drive 4.58 18.10 S 23rd Ave 0.64 2.53 Existin Alle 1.05 4.19 Tota I 10.49 41.62 11.24.2 HYDRAULIC CAPACITY FOR WASTEWATER FACILITIES TO SERVE EXISTING COLLECTION SYSTEM This section is not applicable. 11.24.3 HYDRAULIC CAPACITY FOR WASTEWATER FACILITIES TO SERVE NEW COLLECTION SYSTEM The designated flows calculation in section 11.24.1 Flow Definitions and Identification will be conveyed from to the City of Bozeman's sanitary sewer collection system via gravity.The capacity of the existing/proposed 8-inch sewer mains at the minimum 0.4 percent design slope is 344-gpm. Assuming the pipe does not exceed 75 percent of full flow capacity, then the available capacity at 75 percent of full flow is 258-gpm. The available pipe capacity exceeds the calculated peak hour demand at every discharge location, so the existing/proposed sewer mains are appropriately sized to convey the anticipated sewer demands. See Appendix B for pipe hydraulic capacity calculations. The City of Bozeman will convey the designated flows to their wastewater facility within theirwastewatercollection system. Inflow and Infiltration (I&I) is assumed to be minor relative to the sewage flows since the proposed sewer main extension will utilize standard PVC push-on joints. However, to be conservative, 150 gal/acres/day demand has been added to the available main capacity to account for potential I&I. Manholes will not be installed in low points where surface water has the potential to pool above the rim and seep into the sewer collection system. Sanitary Sewer Design Report Page 4 of 5 January 2025 Should you have any questions, I can be reached at to further discuss this report. Sincerely, � Bobby Egeberg, PE Bozeman Land Development Manager Sanitary Sewer Design Report Page 5 of 5 January 2025 MEADOW BRIDGE SUBDIVISION Project 05021.28 N � Z � a � D � � � m m � Z m � � � m D � a z v N , ,<� � , P?. Meadow Bridge Sanitary Sewer Demands Sewer Service Num er o ADD wit ADD wit Numberof Infiltration ADDwithout Lot Size(sf) Size(acres) Discharge DwellingUnits Peopleper SewerDemand(gpcd) �gal/acres/day) Infiltration(gpd) Infiltration Infiltration PHD(gpm) 1 11,221 0.258 AIIeyA 3 2.17 64.4 150 419.24 457.88 0.32 1.26 2 11,799 0.271 AIIeyA 3 2.17 64.4 150 419.24 459.87 0.32 1.26 3 12.882 0.296 Alley A 3 2.17 64.4 150 419.24 463.60 0.32 1.27 4 10,200 0.234 AIIeyA 3 2.17 64.4 150 419.24 454.37 0.32 1.26 5 10.200 0234 Alley A 3 2.17 64.4 150 419.24 454.37 0.32 1.26 6 10,200 0.234 AIIeyA 3 2.17 64.4 150 419.24 454.37 0.32 1.26 7 11,695 0.268 Alley A 3 2.17 64.4 150 419.24 459.52 0.32 126 8 9,017 0.207 AIIeyA 3 2.17 64.4 150 419.24 450.29 0.31 1.26 9 8.250 0.189 AIIeyA 2 2.17 64.4 150 279.50 307.91 0.21 0.84 10 8,824 0.203 AIIeyA 2 2.17 64.4 150 279.50 309.88 0.22 0.84 11 9.039 0.208 AIIeyA 3 2.17 64.4 150 419.24 450.37 0.31 1.26 12 10,372 0.238 AIIeyA 3 2.17 64.4 150 419.24 454.96 0.32 1.26 13 14,054 0.323 Last Loop Drive 3 2.17 64.4 150 419.24 467.64 0.32 1.27 14 12,457 0.286 Last Loop Drive 3 2.17 64.4 150 419.24 462.14 0.32 1.26 15 12.506 0.287 Last Loop Drive 3 2.17 64.4 150 419.24 462.31 0.32 126 16 12,396 0.285 Last Loop Drive 3 2.17 64.4 150 419.24 461.93 0.32 1.26 17 12,411 0.285 Last Loop Drive 3 2.17 64.4 150 419.24 461.98 0.32 126 18 9,621 0.221 Last Loop Drive 3 2.17 64.4 150 419.24 452.37 0.31 1.26 19 9,510 0.218 Last Loop Drive 3 2.17 64.4 150 419.24 451.99 0.31 1.26 20 8,512 0.195 Last Loop Drive 2 2.17 64.4 150 279.50 308.81 0.21 0.84 21 8,791 0.202 Last Loop Drive 2 2.17 64.4 150 279.50 309.77 0.22 0.84 22 9,941 0.228 Last Loop Drive 3 2.17 64.4 150 419.24 453.48 0.31 1.26 23 6.682 0.153 Last Loop Drive 2 2.17 64.4 150 279.50 302.51 0.21 0.84 24 6,479 0.149 Alley B 2 2.17 64.4 150 279.50 301.81 0.21 0.84 25 6,479 0.149 Alley B 2 2.17 64.4 150 279.50 301.81 0.21 0.84 26 6,479 0.149 Alley B 2 2.17 64.4 150 279.50 301.81 0.21 0.84 27 11.929 0.274 Last Loop Drive 3 2.17 64.4 150 419.24 460.32 0.32 1.26 28 6,313 0.145 Last Loop Drive 2 2.17 64.4 150 279.50 301.23 0.21 0.84 29 4,884 0.112 Last Loop Drive 1 2.17 64.4 150 139.75 156.57 0.11 0.42 30 6,454 0.148 Last Loop Drive 2 2.17 64.4 150 279.50 301.72 0.21 0.84 31 6.175 0.142 Last Loop Drive 2 2.17 64.4 150 279.50 300.76 0.21 0.84 32 5,527 0.127 Last Loop Drive 1 2.17 64.4 150 139.75 158.78 0.11 0.42 33 5,198 0.119 Last Loop Drive 1 2.17 64.4 150 139.75 157.65 0.11 0.42 34 5,850 0.134 Last Loop Drive 1 2.17 64.4 150 139.75 159.89 0.11 0.43 35 4,000 0.092 S 23rd Ave 1 2.17 64.4 150 139.75 153.52 0.11 0.42 36 4,000 0.092 S 23rd Ave 1 2.17 64.4 150 139.75 153.52 0.11 0.42 37 4,000 0.092 S 23rd Ave 1 2.17 64.4 150 139.75 153.52 0.11 0.42 38 4,000 0.092 S 23rd Ave 1 2.17 64.4 150 139.75 153.52 0.11 0.42 39 4,000 0.092 S 23rd Ave 1 2.17 64.4 150 139.75 153.52 0.11 0.42 40 4,000 0.092 S 23rd Ave 1 2.17 64.4 150 139.75 153.52 0.11 0.42 41 6.002 0.138 ExistingAlley 2 2.17 64.4 150 279.50 300.16 0.21 0.84 42 6,002 0.138 ExistingAlley 2 2.17 64.4 150 279.50 300.16 0.21 0.84 43 6.002 0.138 ExistingAlley 2 2.17 64.4 150 279.50 300.16 0.21 0.84 44 6,002 0.138 ExistingAlley 2 2.17 64.4 150 279.50 300.16 0.21 0.84 45 8,395 0.193 ExistingAlley 2 2.17 64.4 150 279.50 308.40 0.21 0.84 Total 368.750 8.465 N/A 99 2.17 64.4 150 13835.05 15104.85 10.49 41.62 Meadow Bridge Subdivision Sanitary Sewer Demand Summary Sanitary Sewer Discharge Location ADD (gpm) PHD (gpm) AI ley A 3.60 14.29 Alley B 0.63 2.52 Last Loop Drive 4.58 18.10 S 23 rd Ave 0.64 2.53 ExistingAlley 1.05 4.19 MEADOW BRIDGE SUBDIVISION Project 05021.28 _ � v � n � n � � � Z � v c � r � a � 0 z y � f �i�.� i ,� ,t r>. Pro�ect: Meadow Bridge Subdivision ��� � Date: 01/06/2025 Capacit�Calculations - Alle�A 8" Pipe Flowing Full Capacity 0.77 cfs 8" Pipe Flowing Full Capacity 344 gal/min Q/Qfill @ 75% full, 0.75 per nomograph Capacity @ 75% full 258 gal/min S�stem Demand Alley A Service Area DESIGNATION R-3 Zoning Demand Residential Demand 4751 gal/day 3.30 gal/min Peaking Factor(per City of Bozeman formula) 4.24 Peak Hourly Flow 13.99 gal/min Infiltration at 150 gal/acres/day 426 gal/day Infiltration gal/min 0.30 gal/min Total Peak Hourly Flow plus Infiltration 14.29 gal/min Result Q/Qfull based on peak hour 0.04 Percent Full for8" From Nomograph at peak hour 16% Pro�ect: Meadow Bridge Subdivision ��� � Date: 01/06/2025 Capacit�Calculations - Alle� B 8" Pipe Flowing Full Capacity 0.77 cfs 8" Pipe Flowing Full Capacity 344 gal/min Q/Qfill @ 75% full, 0.75 per nomograph Capacity @ 75% full 258 gal/min S�stem Demand Alley B Service Area DESIGNATION R-3 Zoning Demand Residential Demand 838 gal/day 0.58 gal/min Peaking Factor(per City of Bozeman formula) 4.24 Peak Hourly Flow 2.47 gal/min Infiltration at 150 gal/acres/day 67 gal/day Infiltration gal/min 0.05 gal/min Total Peak Hourly Flow plus Infiltration 2.52 gal/min Result Q/Qfull based on peak hour 0.01 Percent Full for8" From Nomograph at peak hour 5% Pro�ect: Meadow Bridge Subdivision ��� � Date: 01/06/2025 Capacit�Calculations - Last Loop Drive 8" Pipe Flowing Full Capacity 0.77 cfs 8" Pipe Flowing Full Capacity 344 gal/min Q/Qfill @ 75% full, 0.75 per nomograph Capacity @ 75% full 258 gal/min S�stem Demand Last Loop Drive Service Area DESIGNATION R-3 Zoning Demand Residential Demand 6009 gal/day 4.17 gal/min Peaking Factor(per City of Bozeman formula) 4.24 Peak Hourly Flow 17.69 gal/min Infiltration at 150 gal/acres/day 583 gal/day Infiltration gal/min 0.40 gal/min Total Peak Hourly Flow plus Infiltration 18.10 gal/min Result Q/Qfull based on peak hour 0.05 Percent Full for8" From Nomograph at peak hour 18% Pro�ect: Meadow Bridge Subdivision ��� � Date: 01/06/2025 Capacit�Calculations - S 23rd Ave 8" Pipe Flowing Full Capacity 0.77 cfs 8" Pipe Flowing Full Capacity 344 gal/min Q/Qfill @ 75% full, 0.75 per nomograph Capacity @ 75% full 258 gal/min S�stem Demand S 23rd Ave Service Area DESIGNATION R-3 Zoning Demand Residential Demand 838 gal/day 0.58 gal/min Peaking Factor(per City of Bozeman formula) 4.24 Peak Hourly Flow 2.47 gal/min Infiltration at 150 gal/acres/day 83 gal/day Infiltration gal/min 0.06 gal/min Total Peak Hourly Flow plus Infiltration 2.53 gal/min Result Q/Qfull based on peak hour 0.01 Percent Full for8" From Nomograph at peak hour 5% Pro�ect: Meadow Bridge Subdivision ��� � Date: 01/06/2025 Capacit�Calculations - Existing Alle�[ 8" Pipe Flowing Full Capacity 0.77 cfs 8" Pipe Flowing Full Capacity 344 gal/min Q/Qfill @ 75% full, 0.75 per nomograph Capacity @ 75% full 258 gal/min S�stem Demand Existing Alley Service Area DESIGNATION R-3 Zoning Demand Residential Demand 1397 gal/day 0.97 gal/min Peaking Factor(per City of Bozeman formula) 4.24 Peak Hourly Flow 4.11 gal/min Infiltration at 150 gal/acres/day 112 gal/day Infiltration gal/min 0.08 gal/min Total Peak Hourly Flow plus Infiltration 4.19 gal/min Result Q/Qfull based on peak hour 0.01 Percent Full for8" From Nomograph at peak hour 8% i . Intelligent Infrastructure. Enduring Communities. www.sanbell.com