Loading...
HomeMy WebLinkAbout007 - Appendix F - Green PlanMeadow Bridge January 2025 | Conceptual Park Master Plan 50 100 2000 NORTH SOUTH 23RD AVENUESITE BOUNDARY PARK BOUNDARY KEYNOTES EXISTING PLAYGROUND AND PARK PARK BENCHES TRAIL TOTEM SIGNS C.O.B. PARK SIGN DOG STATIONS 10’ EAST/WEST CONCRETE ROUTE WETLAND BRIDGE CROSSING EXISTING WATERCOURSE VEGETATION STORMWATER DETENTION BASINS EXISTING 10’ CONCRETE WALK EXISTING PARK LAWN BIKE PARKING 6’ GRAVEL TRAIL 12’ GRAVEL TRAIL/MAINTENANCE ROAD PICNIC TABLE PROPOSED WATERCOURSE PLANTINGS EXTENDED 10’ CONCRETE WALK 5’ CONCRETE RESIDENTIAL SIDEWALK PROPOSED BLVD TREES 1 1 2 3 4 3 3 13 33 5 6 6 7 7 9 10 11 11 11 15 15 15 12 16 18 16 17 19 17 17 8 8 8 13 13 13 13 13 14 14 14 11 11 11 12 12 12 5 5 53 3 4 2 2 2 2 19 9 10 18 2 OPEN GREEN SPACE OPEN GREEN SPACE MEADOW CREEK PARK EXISTING ADJACENT HOMES R-3 EXISTING ADJACENT HOMES R-3 COMMONWEALTH STREET BLACKWOOD ROAD KURK DRIVEPARKWAY AVENUELAST LOOP RDSOUTH 22ND AVENUEPARK IMPROVEMENTS DEPICTED ON THESE PLANS ARE BASED ON CONCEPTUAL PLANS & ARE SUBJECT TO CHANGE THROUGH FURTHER DESIGN, DEVELOPMENT, BUDGETING AND CITY/NEIGHBORHOOD FEEDBACK Watercourse Setback Note Delineation of watercourse setback determined in spring of 2024