Loading...
HomeMy WebLinkAboutBarnard Office HQ Infrastructure PlansVICINITY MAP NORTH PROJECT NO: BARNARD CONSTRUCTION BOZEMAN, MT 59715 101 EAST MAIN, STUDIO ONE BOZEMAN, MT PREPARED FOR: BARNARD OFFICE HQ INFRASTRUCTURE PLANS ROYAL WOLF WAY   22285 RECORD DRAWINGS C1.0 FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION 22285 ---- ---- ---- RECORD DRAWINGS ---- ---- ---- 04/28/25 ISSUE FOR CONSTRUCTION PR 0105/24/23 DE 22285_COVER_INFRASTRUCTURE.DWG RPE 106 East Babcock, Suite L1 Bozeman, Montana 59715 406.522.9876 sandersonstewart.com SITE LAND USE MAP ZONING MAP 1 2 3 4 5 6 SHEET TITLE C1.0 COVER SHEET C1.1 LEGEND AND ABBREVIATIONS C2.0 EXISTING SITE AND DEMOLITION PLAN C3.0 FIRE LINE PLAN AND PROFILE C3.1 WATER SERVICE PLAN AND PROFILE C3.2 FIRE HYDRANT PLAN AND PROFILE C4.0 DETAILS C4.1 DETAILS 7 8 P:\22285_Barnard_Office_HQ\CADD_C3D\PRODUCTION_DWG\INFRASTRUCTURE\22285_COVER_INFRASTRUCTURE.dwg, 24x36-COVER, 4/17/2025 9:33:19 AM, abelluscio, 1:1 RECORD DRAWINGSELECTRIC JUNCTION BOX EXISTING STORM DRAIN MANHOLE EXISTING CATCH BASIN SIGN POWER POLE EXISTING WATER VALVE EXISTING FIRE HYDRANT BOLLARD BUSH EXISTING CURB STOP FIRE DEPT. CONNECTION FIBER OPTIC PEDESTAL GAS METER GAS MANHOLE GAS VALVE GUYWIRE IRRIGATION VALVE IRRIGATION BOX LIGHT POLE POWER METER POWER MANHOLE ELECTRIC PEDESTAL ROOF DRAIN SIGNAL POLE EXISTING SANITARY SEWER MANHOLE SANITARY SEWER CLEAN OUT TELEPHONE BOX TELEPHONE MANHOLE TELEPHONE PEDESTAL TRANSFORMER CONIFEROUS TREE DECIDUOUS TREE COMMUNICATIONS MANHOLE COMMUNICATIONS PEDESTAL WELL YARD HYDRANT EW = FINISHED GRADE AT EDGE OF WALK TC = FINISHED GRADE AT TOP BACK OF CURB BC = FINISHED GRADE AT BUILDING CORNER TW = FINISHED GRADE AT TOP OF WALL AC = FINISHED GRADE AT ASPHALT EA = FINISHED GRADE AT EDGE OF ASPHALT EC = FINISHED GRADE AT EDGE OF CONCRETE SDI = STORM DRAIN INLET SDMH = STORM DRAIN MANHOLE FL = FINISHED GRADE AT FLOWLINE FG = FINISHED GRADE EX = APPROXIMATE EXISTING ELEVATION POC = POINT ON CURVE EXISTING WATER REDUCER GAS WELL FOUND CORNER MONUMENT AS NOTED SET CORNER MONUMENT, REBAR WITH CAP BENCHMARK SECTION QUARTER CORNER SECTION CORNER WTR = WATER PI = POINT OF INTERSECTION PRC = POINT OF REVERSE CURVE RT = RIGHT LT = LEFT SS = SANITARY SEWER PT = POINT OF TANGENCY SD = STORM DRAIN GV = GATE VALVE BFV = BUTTERFLY VALVE RED = REDUCER LF = LINEAL FOOT FT = FEET SSMH = SANITARY SEWER MANHOLE BVC = BEGIN VERTICAL CURVE CS = CURB STOP EVC = END VERTICAL CURVE PVI = POINT OF VERTICAL INTERSECTION LINETYPES ABBREVIATIONS SYMBOLS PROPOSED CATCH BASIN PROPOSED WATER REDUCER PROPOSED WATER VALVE PROPOSED FIRE HYDRANT PROPOSED CURB STOP PROPOSED SANITARY SEWER MANHOLE PROPOSED STORM DRAIN MANHOLE KEYNOTE CALL OUT (SEE KEYNOTE LEGEND) SRVC = SERVICE (TYP.) = TYPICAL PC = POINT OF CURVATURE EXISTING MONUMENT BOX PROPOSED MONUMENT BOX NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 6TH EDITION, APRIL, 2010, AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS, DATED MARCH 31, 2011, WITH ADDENDUM. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. GR = EXISTING GRADE AT GROUND BRK = GRADE BREAK FIBER OPTIC GAS PIPELINE OIL PIPELINE UNDERGROUND POWER SANITARY SEWER STORM DRAIN TELEPHONE TELEVISION/CABLE WATER CONTOUR OVERHEAD POWER FENCE - VINYL FENCE - BARBWIRE FENCE - WOOD CURB AND GUTTER EDGE OF ASPHALT EDGE OF GRAVEL FENCE - CHAINLINK/ WOVEN WIRE EXISTING PROPOSED HP = HIGH POINT FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION LEGEND AND ABBREVIATIONSBARNARD OFFICE HQ INFRASTRUCTURE PLANSROYAL WOLF WAYBOZEMAN, MTC1.1 RPE22285_COVER_INFRASTRUCTURE.DWGDE05/24/23ISSUE FOR CONSTRUCTION PR 0104/28/25------------ RECORD DRAWINGS------------ 22285DEMO AREA PROPOSED ASPHALT PROPOSED CONCRETE PROPOSED GRAVEL FULL HEIGHT CATCH CURB FULL HEIGHT SPILL CURB TRANSITION FROM CATCH TAPER CURB HEAD 3' TO SPILL CURB TOP OF CURB - 0.58' = LIP TOP OF CURB - 0.53' = FLOWLINESPILL CURB TOP OF CURB - 0.38' = LIP TOP OF CURB - 0.45' = FLOWLINECATCH CURB THICKENED EDGE SIDEWALK GRADING PLAN P:\22285_Barnard_Office_HQ\CADD_C3D\PRODUCTION_DWG\INFRASTRUCTURE\22285_COVER_INFRASTRUCTURE.dwg, 24x36-LEGEND, 4/17/2025 9:33:20 AM, abelluscio, 1:1 PROJECT SURVEY CONTROL (LDP) Point # 202 204 207 209 212 215 Northing (IFT) 138301.31 138118.90 138173.16 138709.36 139059.70 138684.57 Easting (IFT) 370174.94 370220.23 369843.21 369116.23 369526.85 369655.13 Elevation (USSF) 4600.20 4598.27 4603.69 4600.32 4597.37 4599.39 Description PC /OCR MORRISON MAIERLE 16411LS PC /OCR MORRISON MAIERLE 16411LS PC /OCR MORRISON MAIERLE 16411LS PC /OCR MORRISON MAIERLE 16411LS PC /OCR MORRISON MAIERLE 16411LS PC /OCR MORRISON MAIERLE 16411LS PROJECT DATUM: LOW DISTORTION PROJECTION COORDINATE SYSTEM (LDP MT83-BOZ-IF) NORTH AMERICAN DATUM OF 1983 SURVEYED: 10/10/22 BY: SANDERSON STEWART RECORD DRAWINGSNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION EXISTING SITE AND DEMOLITION PLANBARNARD OFFICE HQ INFRASTRUCTURE PLANSROYAL WOLF WAYBOZEMAN, MTC2.0 RPE22285_EX_INFRASTRUCTURE.DWGDE05/24/23ISSUE FOR CONSTRUCTION PR 0104/28/25------------ RECORD DRAWINGS------------ 222850 60 SCALE: 1" = 60' 1203060 SITE DEMOLITION NOTES: 1.ALL LOCATIONS AND DIMENSIONS OF EXISTING AND PROPOSED FEATURES ARE APPROXIMATE AND THE PROJECT DRAWINGS MAY NOT INCLUDE ALL EXISTING FEATURES WITHIN THE PROJECT BOUNDARIES. THE CONTRACTOR SHALL THOROUGHLY REVIEW THE SITE PRIOR TO BIDDING AND CONSTRUCTION TO BECOME FAMILIAR WITH THE EXISTING SITE FEATURES AND CONDITIONS. IF DISCREPANCIES ARE FOUND BETWEEN THE PROJECT DRAWINGS AND FIELD CONDITIONS THE CONTRACTOR SHALL CONTACT THE PROJECT ENGINEER FOR CLARIFICATION. 2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING AND PAYING FOR ALL PERMITS NECESSARY TO COMPLETE THE PROPOSED WORK INCLUDING DEMOLITION, RIGHT-OF-WAY AND ENVIRONMENTAL PERMITS. 3.ALL PUBLIC AND PRIVATE UTILITY TERMINATIONS, DISCONNECTS AND REMOVALS TO BE COORDINATED WITH THE APPLICABLE UTILITY PROVIDERS AND PERFORMED IN ACCORDANCE TO THEIR RESPECTIVE STANDARDS AND SPECIFICATIONS. 4.ALL EXISTING ASPHALT, CONCRETE AND OTHER EXISTING FACULTIES WITHIN THE “DEMO AREA” TO BE REMOVED AND PROPERLY DISPOSED IN ACCORDANCE TO ALL FEDERAL, STATE AND LOCAL REGULATIONS. 5.ALL REMOVED, DISTURBED OR DAMAGED EXISTING ASPHALT, CURB AND GUTTER, PUBLIC SIDEWALK AND PAVEMENT MARKINGS WITHIN THE PUBLIC RIGHT-OF-WAY TO BE RESTORED IN ACCORDANCE TO CITY STANDARDS. ALL ASPHALT MATCH LINES SHALL BE SAW CUT TO PROVIDE FLUSH TRANSITION AND SEALED. 6.ALL EXISTING UNDERGROUND SERVICE STUBS WHICH ARE NOT UTILIZED FOR THE PROPOSED BUILDING SHALL BE REMOVED AND PLUGGED BACK TO THE EXISTING MAIN. ANY EXISTING PIPING WITHIN THE PROPOSED BUILDING AREA SHALL BE REMOVED & DISPOSED. 7.ALL EXCAVATIONS OR VOIDS CREATED DURING DEMOLITION SHALL BE BACKFILLED AND COMPACTED IN A CONTROLLED MANNER PER THE PROJECT GEOTECHNICAL REQUIREMENTS. SEE REQUIREMENTS IN THE GEOTECHNICAL REPORT. 8.ALL UTILITY JUNCTION BOXES TO BE PROTECTED IN PLACE UNLESS OTHERWISE NOTED. 9.ALL TREES AND SHRUBS SHALL BE PROTECTED IN PLACE UNLESS OTHERWISE NOTED. PHILLIPS 66 PIPELINE NOTES: 1.WARNING HIGH PRESSURE PIPELINE(S). NO EXCAVATION OR CONSTRUCTION IN THIS AREA WITHOUT ONE-CALL AND WITHOUT CONTACTING PHILLIPS 66 PIPELINE LLC (P66PL) AT (406) 587-7060. 2.CONTRACTOR TO CONTACT YELLOWSTONE PIPELINE REPRESENTATIVE AT LEAST 72 HOURS PRIOR TO ANY WORK NEAR OR WITHIN THE EASEMENT. YELLOWSTONE PIPELINE REPRESENTATIVE MUST BE PRESENT ON-SITE DURING ALL EXCAVATION ACTIVITIES WITHIN THE EASEMENT P:\22285_Barnard_Office_HQ\CADD_C3D\PRODUCTION_DWG\INFRASTRUCTURE\22285_EX_INFRASTRUCTURE.dwg, 24x36-SITE, 4/17/2025 9:34:09 AM, abelluscio, 1:1 RECORD DRAWINGSNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION FIRE LINE PLAN AND PROFILEBARNARD OFFICE HQ INFRASTRUCTURE PLANSROYAL WOLF WAYBOZEMAN, MTC3.0 RPE22285_FIRE LINE P&P.DWGDE05/24/23ISSUE FOR CONSTRUCTION PR 0104/28/25------------ RECORD DRAWINGS------------ 22285VERTICAL SCALE: 1"=5' 20 10 0 HORIZONTAL SCALE:1" = 20' 20 40 CITY OF BOZEMAN NOTES: 1.ALL CONSTRUCTION WILL CONFORM TO MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS (MPWSS) 6TH EDITION, APRIL, 2010, AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS, DATED MARCH 31, 2011, WITH ADDENDUM. 2.ANY EXISTING OR NEW VALVES WHICH CONTROL THE CITY OF BOZEMAN'S WATER SUPPLY SHALL BE OPERATED BY CITY OF BOZEMAN PERSONNEL ONLY. 3.THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING OF WORK. 4.CONTRACTOR SHALL FIELD-VERIFY LINE AND GRADE OF EXISTING CONNECTIONS. 5.A PRE-CONSTRUCTION MEETING MUST BE SCHEDULED WITH THE CITY OF BOZEMAN WATER AND ENGINEER DEPARTMENTS PRIOR TO INSTALLATION OF THE FIRE LINE AND DOMESTIC SERVICE. 6.CONTRACTOR SHALL INSTALL FIRE LINE WITH RESTRAINED JOINT PIPE AND FITTINGS. 7.ALL DUCTILE IRON PIPE AND FITTINGS INCLUDING HYDRANTS, VALVE BOXES, CURB BOXES, AND ALL OTHER METAL PARTS AND SURFACES SHALL BE ENCASED WITH V-BIO® TM ENHANCED POLYETHYLENE ENCASEMENT. 8.THE POLYETHYLENE ENCASEMENT SHALL BE OVERLAPPED ONE FOOT IN EACH DIRECTION AT JOINTS AND SECURED IN PLACE AROUND THE PIPE, AND ANY WRAP AT TAP LOCATIONS SHALL BE TAPED TIGHTLY PRIOR TO TAPPING AND INSPECTED FOR ANY NEEDED REPAIRS FOLLOWING THE TAP.P:\22285_Barnard_Office_HQ\CADD_C3D\PRODUCTION_DWG\INFRASTRUCTURE\22285_FIRE LINE P&P.dwg, 24x36-PnP_Fire, 4/17/2025 9:35:38 AM, abelluscio, 1:1 RECORD DRAWINGSNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION WATER SERVICE PLAN AND PROFILEBARNARD OFFICE HQ INFRASTRUCTURE PLANSROYAL WOLF WAYBOZEMAN, MTC3.1 RPE22285_WATER LINE P&P.DWGDE05/24/23ISSUE FOR CONSTRUCTION PR 0104/28/25------------ RECORD DRAWINGS------------ 22285VERTICAL SCALE: 1"=5' 20 10 0 HORIZONTAL SCALE:1" = 20' 20 40 CITY OF BOZEMAN NOTES: 1.ALL CONSTRUCTION WILL CONFORM TO MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS (MPWSS) 6TH EDITION, APRIL, 2010, AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS, DATED MARCH 31, 2011, WITH ADDENDUM. 2.ANY EXISTING OR NEW VALVES WHICH CONTROL THE CITY OF BOZEMAN'S WATER SUPPLY SHALL BE OPERATED BY CITY OF BOZEMAN PERSONNEL ONLY. 3.THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING OF WORK. 4.CONTRACTOR SHALL FIELD-VERIFY LINE AND GRADE OF EXISTING CONNECTIONS. 5.A PRE-CONSTRUCTION MEETING MUST BE SCHEDULED WITH THE CITY OF BOZEMAN WATER AND ENGINEER DEPARTMENTS PRIOR TO INSTALLATION OF THE FIRE LINE AND DOMESTIC SERVICE. 6.CONTRACTOR SHALL INSTALL FIRE LINE WITH RESTRAINED JOINT PIPE AND FITTINGS. 7.ALL DUCTILE IRON PIPE AND FITTINGS INCLUDING HYDRANTS, VALVE BOXES, CURB BOXES, AND ALL OTHER METAL PARTS AND SURFACES SHALL BE ENCASED WITH V-BIO® TM ENHANCED POLYETHYLENE ENCASEMENT. 8.THE POLYETHYLENE ENCASEMENT SHALL BE OVERLAPPED ONE FOOT IN EACH DIRECTION AT JOINTS AND SECURED IN PLACE AROUND THE PIPE, AND ANY WRAP AT TAP LOCATIONS SHALL BE TAPED TIGHTLY PRIOR TO TAPPING AND INSPECTED FOR ANY NEEDED REPAIRS FOLLOWING THE TAP.P:\22285_Barnard_Office_HQ\CADD_C3D\PRODUCTION_DWG\INFRASTRUCTURE\22285_WATER LINE P&P.dwg, 24x36-PnP_Water, 4/17/2025 9:35:53 AM, abelluscio, 1:1 RECORD DRAWINGSNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION FIRE HYDRANT PLAN AND PROFILEBARNARD OFFICE HQ INFRASTRUCTURE PLANSROYAL WOLF WAYBOZEMAN, MTC3.2 RPE22285_HYDRANT LINE P&P.DWGDE05/24/23ISSUE FOR CONSTRUCTION PR 0104/28/25------------ RECORD DRAWINGS------------ 22285VERTICAL SCALE: 1"=5' 20 10 0 HORIZONTAL SCALE:1" = 20' 20 40 CITY OF BOZEMAN NOTES: 1.ALL CONSTRUCTION WILL CONFORM TO MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS (MPWSS) 6TH EDITION, APRIL, 2010, AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS, DATED MARCH 31, 2011, WITH ADDENDUM. 2.ANY EXISTING OR NEW VALVES WHICH CONTROL THE CITY OF BOZEMAN'S WATER SUPPLY SHALL BE OPERATED BY CITY OF BOZEMAN PERSONNEL ONLY. 3.THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING OF WORK. 4.CONTRACTOR SHALL FIELD-VERIFY LINE AND GRADE OF EXISTING CONNECTIONS. 5.A PRE-CONSTRUCTION MEETING MUST BE SCHEDULED WITH THE CITY OF BOZEMAN WATER AND ENGINEER DEPARTMENTS PRIOR TO INSTALLATION OF THE FIRE LINE AND DOMESTIC SERVICE. 6.CONTRACTOR SHALL INSTALL FIRE LINE WITH RESTRAINED JOINT PIPE AND FITTINGS. 7.ALL DUCTILE IRON PIPE AND FITTINGS INCLUDING HYDRANTS, VALVE BOXES, CURB BOXES, AND ALL OTHER METAL PARTS AND SURFACES SHALL BE ENCASED WITH V-BIO® TM ENHANCED POLYETHYLENE ENCASEMENT. 8.THE POLYETHYLENE ENCASEMENT SHALL BE OVERLAPPED ONE FOOT IN EACH DIRECTION AT JOINTS AND SECURED IN PLACE AROUND THE PIPE, AND ANY WRAP AT TAP LOCATIONS SHALL BE TAPED TIGHTLY PRIOR TO TAPPING AND INSPECTED FOR ANY NEEDED REPAIRS FOLLOWING THE TAP.P:\22285_Barnard_Office_HQ\CADD_C3D\PRODUCTION_DWG\INFRASTRUCTURE\22285_HYDRANT LINE P&P.dwg, 24x36-PnP_Water, 4/17/2025 9:36:58 AM, abelluscio, 1:1 RECORD DRAWINGSFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION DETAILSBARNARD OFFICE HQ INFRASTRUCTURE PLANSROYAL WOLF WAYBOZEMAN, MTC4.0 RPE22285_DETAILS_INFRASTRUCTURE.DWGDE05/24/23ISSUE FOR CONSTRUCTION PR 0104/28/25------------ RECORD DRAWINGS------------ 22285P:\22285_Barnard_Office_HQ\CADD_C3D\PRODUCTION_DWG\INFRASTRUCTURE\22285_DETAILS_INFRASTRUCTURE.dwg, 24x36-DETAILS, 4/17/2025 9:37:40 AM, abelluscio, 1:1 RECORD DRAWINGSFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION DETAILSBARNARD OFFICE HQ INFRASTRUCTURE PLANSROYAL WOLF WAYBOZEMAN, MTC4.1 RPE22285_DETAILS_INFRASTRUCTURE.DWGDE05/24/23ISSUE FOR CONSTRUCTION PR 0104/28/25------------ RECORD DRAWINGS------------ 22285P:\22285_Barnard_Office_HQ\CADD_C3D\PRODUCTION_DWG\INFRASTRUCTURE\22285_DETAILS_INFRASTRUCTURE.dwg, 24x36-DETAILS 2, 4/17/2025 9:37:48 AM, abelluscio, 1:1