HomeMy WebLinkAbout21.0 A3.1 Building ElevationsT.O.ROOF
151'-0"
1st FLR. FIN.
100'-0"
2nd FLR. FIN.
115'-1 1/2"
3rd FLR. FIN.
127'-3"
4th FLR. FIN.
139'-3"
1 2 3 4 5
30"10'-0"99.8 SF160.4 SF19.6 SF 198.7 SF 67.3 SF
10
OPEN TO
DECK
1
2
9 9
8
11
10
OPEN TO
DECK
6
6
6 6
6
6
5
5
4
6
6
6
6
6
6
14BUILDING HEIGHT54'-1 1/4"3rd SUBFLR.
127'-0"
4th SUBFLR.
139'-0"
2nd SUBFLR.
115'-0"
T.O.ROOF
151'-0"
1st FLR. FIN.
100'-0"
2nd FLR. FIN.
115'-1 1/2"
3rd FLR. FIN.
127'-3"
4th FLR. FIN.
139'-3"
AEDBC
17.3 SF 19.2 SF 44.8 SF 272.9 SF 19.6 SF 30"10'-0"1
8 8
4
10
10
OPEN TO
DECK
OPEN TO
DECK
7
7
7 6
6
6
6
6
6
6
5
6
6
14
T.O. F.F.
4817.00'BUILDING HEIGHT54'-1 1/4"3rd SUBFLR.
127'-0"
4th SUBFLR.
139'-0"
2nd SUBFLR.
115'-0"
FACADE TRANSPARENCY: NORTH (BABCOCK)
WINDOW AREA/TRANSPARENCY
SOLID WALL
TOTAL = 359.1 SF
TOTAL = 186.7 SF
TOTAL = 545.8 SF
65.8%
34.2%
FACADE TRANSPARENCY: EAST (WILSON)
WINDOW AREA/TRANSPARENCY
SOLID WALL
TOTAL = 292.1 SF
TOTAL = 81.7 SF
TOTAL = 373.8 SF
78.1%
34.2%
N O T F O R
C O N S T R U C T I O N
102 N. BROADWAY AVE., BOZEMAN, MT 59715
WWW.PEARSONDESIGNGROUP.COM
OFFICE:406.587.1997 FAX:406.587.0311
DRAWN BY:
CHECKED BY:
PROJECT NUMBER:
CURRENT ISSUE:
A3.1108 WEST BABCOCKBOZEMAN, MTJB
DT
2025/01/07
PLANNING SUBMITTAL-
COMMENT RESPONSE
2211
BUILDING ELEVATIONS
1/8" = 1'-0"1 NORTH ELEVATION- OVERALL
1/8" = 1'-0"3 EAST ELEVATION- OVERALL
KEYNOTES- ELEVATION
1 BRICK
2 VERTICAL CORRUGATED METAL
3 VERTICAL CORRUGATED METAL- PERFORATED
4 STOREFRONT GLAZING
5 WINDOW UNIT, TYP.
6 PAINTED METAL TRIM, 4 SIDES
7 BRICK TRIM, 4 SIDES
8 PAINTED STEEL STRUCTURAL MEMBER
9 PAINTED STEEL FASCIA
10 GLASS GUARDRAIL
11 BOARDFORM SITE WALL
12 RECESSED BRICK LAY
13 PAINTED STEEL TRELLIS
14 FIRE DEPT. CONNECTION