Loading...
HomeMy WebLinkAbout21.0 A3.1 Building ElevationsT.O.ROOF 151'-0" 1st FLR. FIN. 100'-0" 2nd FLR. FIN. 115'-1 1/2" 3rd FLR. FIN. 127'-3" 4th FLR. FIN. 139'-3" 1 2 3 4 5 30"10'-0"99.8 SF160.4 SF19.6 SF 198.7 SF 67.3 SF 10 OPEN TO DECK 1 2 9 9 8 11 10 OPEN TO DECK 6 6 6 6 6 6 5 5 4 6 6 6 6 6 6 14BUILDING HEIGHT54'-1 1/4"3rd SUBFLR. 127'-0" 4th SUBFLR. 139'-0" 2nd SUBFLR. 115'-0" T.O.ROOF 151'-0" 1st FLR. FIN. 100'-0" 2nd FLR. FIN. 115'-1 1/2" 3rd FLR. FIN. 127'-3" 4th FLR. FIN. 139'-3" AEDBC 17.3 SF 19.2 SF 44.8 SF 272.9 SF 19.6 SF 30"10'-0"1 8 8 4 10 10 OPEN TO DECK OPEN TO DECK 7 7 7 6 6 6 6 6 6 6 5 6 6 14 T.O. F.F. 4817.00'BUILDING HEIGHT54'-1 1/4"3rd SUBFLR. 127'-0" 4th SUBFLR. 139'-0" 2nd SUBFLR. 115'-0" FACADE TRANSPARENCY: NORTH (BABCOCK) WINDOW AREA/TRANSPARENCY SOLID WALL TOTAL = 359.1 SF TOTAL = 186.7 SF TOTAL = 545.8 SF 65.8% 34.2% FACADE TRANSPARENCY: EAST (WILSON) WINDOW AREA/TRANSPARENCY SOLID WALL TOTAL = 292.1 SF TOTAL = 81.7 SF TOTAL = 373.8 SF 78.1% 34.2% N O T F O R C O N S T R U C T I O N 102 N. BROADWAY AVE., BOZEMAN, MT 59715 WWW.PEARSONDESIGNGROUP.COM OFFICE:406.587.1997 FAX:406.587.0311 DRAWN BY: CHECKED BY: PROJECT NUMBER: CURRENT ISSUE: A3.1108 WEST BABCOCKBOZEMAN, MTJB DT 2025/01/07 PLANNING SUBMITTAL- COMMENT RESPONSE 2211 BUILDING ELEVATIONS 1/8" = 1'-0"1 NORTH ELEVATION- OVERALL 1/8" = 1'-0"3 EAST ELEVATION- OVERALL KEYNOTES- ELEVATION 1 BRICK 2 VERTICAL CORRUGATED METAL 3 VERTICAL CORRUGATED METAL- PERFORATED 4 STOREFRONT GLAZING 5 WINDOW UNIT, TYP. 6 PAINTED METAL TRIM, 4 SIDES 7 BRICK TRIM, 4 SIDES 8 PAINTED STEEL STRUCTURAL MEMBER 9 PAINTED STEEL FASCIA 10 GLASS GUARDRAIL 11 BOARDFORM SITE WALL 12 RECESSED BRICK LAY 13 PAINTED STEEL TRELLIS 14 FIRE DEPT. CONNECTION