Loading...
HomeMy WebLinkAbout20.0 A2.0 Overall PlansAA FF 1 1 2 2 3 3 4 4 5 5 EE BB DD 1'-1 3/8"13'-2 5/8"4'-9 3/8"37'-6 5/8"1'-5 3/8"17'-9 3/8"17'-10 5/8"8'-6 7/8"3'-6 1/2"24'-0" 71'-9 3/8"58'-1 3/8"21'-1 3/8"13'-5 1/4"18'-4 113/128"5'-1 111/128"22'-9 3/8"7'-0"22'-6"10'-9 1/8"8'-8 7/8"9'-10 1/8"14'-0 1/2"13'-8"FIRE RISERUTILITY LOCATIONDUMPSTER ENCLOSURESTL PLANTER STL PLANTERBENCH 739SF OF OPEN SPACE BENCH FIRE DEPT. CONNECTION T.O. F.F. 4817.17' T.O. F.F. 4817.00'STL PLANTERBIKE STORAGE(8 BIKE CAPACITY)EXT. COVERED BIKE RACKS (4 BIKE TOTAL CAPACITY) CC AA FF 1 1 2 2 3 3 4 4 5 5 EE BB DD 58'-1 3/8"22'-9 3/8"7'-0"7'-0"19'-8"15'-4"34'-5 3/8"18'-8 5/8"4'-11 3/8"2'-0"33'-8"8'-6 7/8"27'-6 1/2" 71'-9 3/8" T.O. F.F. 4832.29' CC AA FF 1 1 2 2 3 3 4 4 5 5 EE BB DD 7'-0"14'-4"14'-7 1/2"19'-9 7/8"9'-4"58'-1 3/8"14'-4"17'-2"2'-11 3/8"18'-8 5/8"4'-11 3/8"2'-0"6'-6"27'-2"8'-6 7/8"16'-6 1/2"11'-0" 71'-9 3/8"58'-1 3/8"15'-2 7/8"7'-6 1/2"7'-0"7'-0"19'-8"15'-4" 79SF OF OPEN SPACE 103SF OF OPEN SPACE T.O. F.F. 4844.42' CC AA FF 1 1 2 2 3 3 4 4 5 5 EE BB DD 14'-4"14'-7 1/2"19'-9 7/8"9'-4"58'-1 3/8"2'-0"6'-6"27'-2"8'-6 7/8"16'-6 1/2"11'-0"14'-4"17'-2"2'-11 3/8"18'-8 5/8"4'-11 3/8"71'-9 3/8"58'-1 3/8"15'-2 7/8"7'-6 1/2"7'-0"7'-0"19'-8"15'-4" 79SF OF OPEN SPACE 103SF OF OPEN SPACE T.O. F.F. 4856.42' CC 35.520.060 1st FLOOR TOTAL = 739 sf 3rd FLOOR TOTAL = 182 sf 4th FLOOR TOTAL = 182 sf TOTAL = 1,103 sf OPEN SPACE: OPEN SPACE PROVIDED 150sf PER DWELLING UNIT 4x150sf = 600sf REQUIRED OPEN SPACE N O T F O R C O N S T R U C T I O N 102 N. BROADWAY AVE., BOZEMAN, MT 59715 WWW.PEARSONDESIGNGROUP.COM OFFICE:406.587.1997 FAX:406.587.0311 DRAWN BY: CHECKED BY: PROJECT NUMBER: CURRENT ISSUE: A2.0108 WEST BABCOCKBOZEMAN, MTJB DT 2025/04/21 PLANNING SUBMITTAL- COMMENT RESPONSE 2211 OVERALL PLANS 1/8" = 1'-0"1 1st FLOOR PLAN 1/8" = 1'-0"2 2nd FLOOR PLAN 1/8" = 1'-0"3 3rd FLOOR PLAN 1/8" = 1'-0"4 4th FLOOR PLAN