HomeMy WebLinkAbout15.0 L600 Irrigation PlanGENERAL IRRIGATION NOTES1.ALL VALVE BOES TO BE STANDARD SIZE OR LARGER.2.IRRIGATION MAIN LINE TO BE 1.5Ͳ SCH ʻ0 PVC PIPE OR 150 PSI POLY PIPE.ʺ.ALL TREES TO BE IRRIGATED THROUGH DEDICATED BUBBLERS. BUBBLERS TO BE EVENLY DISTRIBUTEDAROUND BASE OF TREE WITH FOUR (ʻ) EVENLY SPACED BUBBLER EMITTERS.ʻ.TREES AND SHRUBS PLACED WITHIN PLANTING BEDS MAY UTILIZE DRIP IRRIGATION. DRIP IRRIGATION TO BEAD
USTED PER REQUIREMENTS OF EACH INDIVIDUAL PLANT.5.ALL SHRUBS OUTSIDE OF DEDICATED PLANTING BEDS TO HAVE DEDICATED BUBBLERS. BUBBLERS TO BEEVENLY DISTRIBUTED AROUND BASE OF SHRUB WITH TWO (2) EVENLY SPACED BUBBLER EMITTERS.6.ALL MIED SHRUB AND PERENNIAL PLANTINGS TO BE IRRIGATED WITH DEDICATED DRIP TUBING. DRIPEMITTERS TO BE AD
USTED PER REQUIREMENTS OF EACH INDIVIDUAL PLANT.EMITTERS PER PLANT TYPE:PERENNIALS- (1) 0.5 GPH EMITTERSHRUBS- (2) 1.0 GPH EMITTERSTREES- (ʻ) 1.0 GPH EMITTERS7.LAWN AND SEED AREAS TO BE IRRIGATED WITH SPRAY OR ROTOR OVERHEAD IRRIGATION AS INDICATED ONPLAN.8.ALL HEADS MUST ACHIEVE HEAD-TO-HEAD COVERAGE FOR SOD AREAS.9.SYSTEM SHALL UTILIZE WEATHER / MOISTURE MONITOR.10.BACKFLOW ASSEMBLY AND BLOWOUT ASSEMBLY SHALL BE LOCATED IN MECHANICAL ROOM OR APPROVEDETERNAL GRADEBO. IT IS THE RESPONSIBILITY OF THE LANDSCAPE CONTRACTOR TO COORDINATEINSTALLATION PER LOCAL CODES AND ORDINANCES AS WELL AS WITH ARCHITECTURE AND ALL OTHERTRADES.11.POWER SOURCE FOR IRRIGATION CONTROLLER TO BE COORDINATED WITH ELECTRICAL ENGINEER,ELECTRICAL CONTRACTOR AND LANDSCAPE CONTRACTOR.12.DO NOT INSTALL IRRIGATION SYSTEM WHEN OBVIOUS OBSTRUCTIONS OR GRADE CHANGES ARE PRESENT.1ʺ.ALL INFORMATION TO BE FIELD-VERIFIED BY CONTRACTOR PRIOR TO INSTALLATION.1ʻ.THE CONTRACTOR SHALL MAINTAIN AN ACCURATE & CURRENT ͱAS-BUILTͱ IRRIGATION PLAN ON SITE AT ALLTIMES.15. IF NOT WITHIN LIMITS OPERATING PRESSURE, CONTRACTOR MUST CONTACT LANDSCAPE ARCHITECT.16.ALL BUILDING LANDSCAPE IRRIGATION TO BE COORDINATED WITH LANDSCAPE CONTRACTOR, G.C., MEP,ARCH., AND PLUMBER.---CONNECTION POINT TO BE DETERMINED BY OTHERS, GRAPHICALLY SHOWN FOR INTENT ONLY---PROVIDE BACKFLOW PREVENTION IN WET MECH ROOM ABOVE FLOOR DRAIN AND STUB OUT OFTHE BUILDING DURING CONSTRUCTION OF HOME.17.FINAL IRRIGATION AND PLUMBING EQUIPMENT SUB
ECT TO CHANGE.18.IRRIGATION SLEEVING TO BE PROVIDED BY CIVIL CONTRACTOR/GCƒ SET SLEEVES UNDER ROADS PER PLANCOORDINATE WITH LANDSCAPE/IRRIGATION INSTALLER PRIOR TO POURING ROADS OR CONCRETE ANDSETTING BOULDER RETAINING WALLS19.SEE IRRIGATION PLAN FOR MORE INFORMATION SHEETS L600SANNUAL WATER USE BASED ON AREA USING PROPOSED SCHEDULE- ESTABLISHEDWATERING WINDOW USED: MAY-SEPTEMBER(5 MONTHS/ 22 WEEKS)PER C.O.B.WATER CONSERVATION WEBSITE-TOTAL GALLONS USED ʤ22 WEEKS= 10,ʻ72-AREA OF LANDSCAPE = 1,506 FT²WATER USE = 6.9 GAL/FT²IÈÈ¿½·Ê¿ÅÄP·ÄL 600design5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\pdg 108 e. babcock - 2024 update\autocad\01_sheets\l600_pdg 108 e babcock_irrigation.dwg
108 W. Babcock
Bozeman, Montana
KHM/HU TMS
08/20/24SPRFOR PLANNINGREVIEW ONLY01/07/25SPR2