Hi Josh,
Please see the email from Taylor Lonsdale below for confirmation that a TIS waiver for this site plan
has been granted.
Melanie Dyba, P.E.
BRIDGER ENGINEERS, INC.
2150 Analysis Drive, Ste. B
Bozeman, MT 59718
Office: 406.585.0590 ext. 105
Direct: 406.602.8705
Cell: 406.223.8801
From: Suzanne Ryan <sryan@BOZEMAN.NET>
Sent: Tuesday, September 3, 2024 2:46 PM
To: Melanie Dyba <mdyba@bridgerengineers.com>
Subject: FW: [EXTERNAL]24121 - 108 W. Babcock - Traffic Study Waiver Request
Hi Melanie,
Please see our transportation engineer’s response below. Please include this email with your site
plan application.
Thank you,
Suzanne Ryan
From: Taylor Lonsdale <tlonsdale@BOZEMAN.NET>
Sent: Tuesday, September 3, 2024 2:42 PM
To: Suzanne Ryan <sryan@BOZEMAN.NET>
Subject: RE: [EXTERNAL]24121 - 108 W. Babcock - Traffic Study Waiver Request
Hi Suzie. Based on the trip generation estimates that were provided, the City of Bozeman will grant a
TIS waiver for this site plan application. Should there be meaningful change to the proposed land use
that would result in different trip generation, the city reserves the right to re-visit this waiver.
Taylor Lonsdale, PE | Transportation Engineer
City of BozemanO: 406.582.2286
pronouns: he\him
From: Suzanne Ryan <sryan@BOZEMAN.NET>
Sent: Tuesday, September 3, 2024 12:35 PM
To: Taylor Lonsdale <tlonsdale@BOZEMAN.NET>
Subject: FW: [EXTERNAL]24121 - 108 W. Babcock - Traffic Study Waiver Request
Hi Taylor,
I got this TIS waiver for 108 W Babcock. They have had a concept but not submitted for site plan yet.
Thanks,
Suzie
From: Melanie Dyba <mdyba@bridgerengineers.com>
Sent: Thursday, August 29, 2024 4:07 PM
To: Suzanne Ryan <sryan@BOZEMAN.NET>
Cc: Audrey Chorak <achorak@BOZEMAN.NET>; Josh Barr <jbarr@pearsondesigngroup.com>
Subject: [EXTERNAL]24121 - 108 W. Babcock - Traffic Study Waiver Request
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you
recognize the sender and know the content is safe.
Hi Suzie,
We are preparing to submit the site plan application for the 108 W. Babcock project and would like to
request a Traffic Impact Study waiver. Please see the attached traffic generation estimates for your
review.
Please let me know if you have any questions or need additional information.
Thank you,
Melanie Dyba, P.E.
BRIDGER ENGINEERS, INC.
2150 Analysis Drive, Ste. B
Bozeman, MT 59718
Office: 406.585.0590 ext. 105
Direct: 406.602.8705
Cell: 406.223.8801