Loading...
HomeMy WebLinkAbout12.0 108 West Babcock - Concurrent Constuction Request BRIDGER ENGINEERS. INC. 2150 Analysis Dr.,Ste. B Bozeman,MT 59718 (406)585-0590 August 26, 2024 Bozeman City Planning& Engineering 20 E. Olive Street Bozeman, MT 59715 Re: 108 West Babcock Street—Site Plan Application (PLNAPP-8249) Concurrent Construction Request Dear Planning & Engineering Staff- This letter is being submitted as a supplement to the 108 West Babcock Site Plan Application. Specifically, this letter serves as a request for concurrent construction to be permitted of the public infrastructure improvements required for this project while the private on-site improvements are being constructed. This request is being made per the Bozeman UDC provision Section 38.270.030.C.1. which states that any municipal water system, sewer system, and streets shall be constructed and accepted by the city prior to the issuance of any building permits. The required public infrastructure for this project includes replacing the existing 6-inch vitrified clay sanitary sewer main with a new sanitary sewer main from the proposed sewer service connection to the manhole at the intersection of Main Street and Wilson Avenue. It also includes public street lighting along Babcock. The provisions of subsections 38.270.030.C.Lb &c are met as follows: b. The sewer main to be replaced is located entirely within public right-of-way; it shall be designed and constructed according to city standards; it is adjacent to the subject property; it shall be installed and accepted by the city; and it will be adequate in capacity to provide necessary service to the project. c.(1) There are no on-site extensions required for the project. c.(2) There is an existing fire hydrant located at the intersection of Babcock and Wilson providing adequate fire protection. Existing water supply to the property is from the city municipal system and shall provide adequate supply during construction. c.(3) The final engineering design plans shall be approved by the City Engineering Department and MT DEQ prior to the issuance of any building permits. c.(4) No occupancy permit shall be issued prior to the completion and final acceptance of the sewer improvements. BRIDGER ENGINEERS, INC. Page 2 We believe this to be a reasonable request since the work can easily be accomplished during the construction timeframe of the on-site improvements; and the approval of this request would allow for scheduling the construction at a desirable time without delaying project approval and construction. Thank you for your time and consideration of this request. Sincerely, Melanie Dyba, P.E. Bridger Engineers, Inc. Cc: Papillon, LLC.