HomeMy WebLinkAbout18--A5.2 - CONSTRUCTION BUILDING SECTIONSPROJECT DATUM (1ST FLR)
+100' -0"
SECOND FLOOR
+110' -8"
THIRD FLOOR
+120' -4"
NEW BASEMENT
+90' -4"
H
A5.4
I
A5.4
DINING
ROOM
1-105
DINING
ROOM
3-105
UNIT 3 PATIO
3-113
UNIT 1 PATIO
1-112
ENTRY
STAIRS
101
J
A5.4
E
A5.2
K
A5.4
D
A5.2
G
A5.3
ENTRY
STAIRS
101 SETBACKSETBACKPROPERTY LINEPROPERTY LINEALLEY6.00°CREST
POINT
5' - 0"
SAG POINT
4.00°
E6
E6E6
BCDEFGHIJ
22.1
1/8" / 12"1/8" / 12"
T.O. PIT SOG
+88' -11"
A
NEW GARAGE
+91' -6"
R1
F5
F4
R1
E8
F1
F4
F5
F1
E1
E6
R5
5.2
R1
5.2
5.2
32.3
R4
R5
7' - 0"E6
6.4
UNIT 4 PATIO
4-104
20' - 8 7/16"12' - 1 1/2"UNIT 4
GARAGE
4-001
PROJECT DATUM (1ST FLR)
+100' -0"
SECOND FLOOR
+110' -8"
THIRD FLOOR
+120' -4"
A
A5.1
NEW BASEMENT
+90' -4"
C
A5.2
B
A5.1
F
A5.3
PRIMARY
BEDROOM #2
1-004
PRIMARY
BATH #2
1-005
OWNER
ENTRY
2-002
ELEVATOR
0-102
HALLWAY
001ENTRY
STAIRS
101
WATER
ENTRANCE
003
ENTRY
STAIRS
101
ENTRY HALL
103
PRIMARY
BATH #1
1-109
PRIMARY
BEDROOM #1
1-108
HALL
201
PRIMARY
BEDROOM #1
3-109
BEDROOM #2
3-202
F1
I8
F2
F1
R3
R3
E2
E6
1234567
22.1
F2
C.L. #1
1-110
UNIT 1 PATIO
1-007
T.O. PIT SOG
+88' -11"
8
I7
14.1 12" / 12"R2
BATH
3-203
F3
I5
1/4" / 12"
PRIMARY
BATH #1
3-110
PRIMARY
CLOSET #1
3-112
R1
22.4
5.2
E3
E1
(E)
I5I5
I7I9
F5
I9
I7
I7
F4
I7
I7
R122.4
2' - 0"7.1
7.1
5.7E6
PROJECT DATUM (1ST FLR)
+100' -0"
SECOND FLOOR
+110' -8"
THIRD FLOOR
+120' -4"
A
A5.1
NEW BASEMENT
+90' -4"
C
A5.2
B
A5.1
BATH #2
2-009
HALLWAY
001ENTRY
STAIRS
101
ENTRY
STAIRS
101
ENTRY HALL
103
FIRE RISER
104
POWDER
2-105
HALL
201
ENTRY
STAIRS
101
A0.7
2
E6
I7
(E)
F5
F1
F2
R3
1234567
E6
E1
E5
I4I7
KITCHEN
2-103
LAUNDRY
4-204
A9.4
11
F4
8
A9.5
1
3.4
I10
(E)
1/4" / 12"
R1
R2
R3
(E)
22.6
LAUNDRY
2-005
OWNER
ENTRY
2-002
BATH
4-102
ENTRY
4-101
F2
F3
6.1
WATER
ENTRANCE
003
5.2
3.1
F1
I7 I8
1. REFERENCE A0.3 FOR PROJECT ABBREVIATIONS
& SYMBOLS.
2. REFERENCE A0.4 FOR BUILDING (WALL, FLOOR &
ROOF) ASSEMBLIES, AND MATERIAL & CEILING
LEGENDS.
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
G
H
1
PROJECT NO:
DATE:
20003
February 20, 2025
All reports, drawings, specifications, computer
files, field data, notes, other documents and
instruments prepared by the Architect as
instruments of service shall remain the property
of the Architect, LocalElementArchitects, LLC.
The Architect shall retain all common law,
statutory and other reserved rights, including
copyright thereto. The use of this drawing shall
be restricted to the original site for which it was
prepared and publication thereof is expressly
limited to such use. Reuse, reproduction or
publication by any method is prohibited without
written consent from LocalElementArchitects,
LLC.
N C O A
N O T F O R C O N S T R U C T IO N
2/20/2025 4:37:52 PM C:\Users\chris\OneDrive\Documents\20003--204_ S 3rd_Central_chrisTMMND.rvtSQUIRE C. KENYON LOFTS204 S. 3RD AVE.BOZEMAN MT, 59715A5.2
CONSTRUCTION
BUILDING SECTIONS
SCALE: 3/16" = 1'-0"C BUILDING SECTION
SCALE: 3/16" = 1'-0"D BUILDING SECTION
SCALE: 3/16" = 1'-0"E BUILDING SECTION
3.1 CAST-IN-PLACE CONCRETE STEPS, SEE LANDSCAPE FOR
FINISH MATERIAL
3.4 4" DEPRESS SLAB FOR FLOOR DRAIN, SHOWER PAN
5.2 RAIL1, DECORATIVE METAL RAILINGS W/ WOOD RAILS, TYP.
5.7 LIFTING BEAM, MIN. SWL 4000 LB, REF STRUCT
6.1 INTERIOR WOOD STAIRS & RAILINGS
6.4 TIMBER TRELLIS W/ ST1, TRANSPARENT STAIN FINISH, REF
STRUCT
7.1 OVERFLOW ROOF SCUPPER
14.1 ELECTRIC LU/LA
22.1 TRENCH DRAIN, REF CIVIL & PLUMBING
22.4 INTERNAL ROOF DRAIN, PLUMBING TBD BY DESIGN/BUILD
PLUMBER
22.6 FLOATING SINK DESIGN TBD
32.3 CONCRETE SIDEWALK - REF. STRUCTURE
KEYNOTES
DRAWING NOTES
REVISIONS
NO. DATE DESCRIPTION