HomeMy WebLinkAbout12--DEM Checklist
1 | Page
204 S. 3RD RESIDENCES
FEBRUARY 20, 2025
204 S. 3RD. AVE BOZEMAN MT, 59715
204 S. 3rd. Residences – DEM Checklist
1. Project Narrative is included in submittal. Please see 03--Project Narrative.
2. Historical information is included in submittal. Please see 06--204 S. 3rd AER Form
3. Existing Images included in submittal. Please see 07--Existing Images.
4. Please see sheet A1.1 in Plan Set.
5. Please see sheets D1.1, D2.1, D2.2, D4.1, and D6.1 in the Plan Set.
6. Please reference Demo sheets. All demolition will happen on noncontributing facades and will
only be to tie in the addition. No nonconforming structure demolition planned.
7. Noticing certificate N1 and materials included in submittal. Please see 13--Property Owner List.
8. Only selective demolition planned that will not alter the historic presence to the streetscape.