HomeMy WebLinkAbout041 A-2 BASEMENT PLANA.0A.1
4.0
C.1 FED.1
2
D.0 G.1G.0
4.1
G.230' - 0 5/8"1' - 9"1' - 11 3/8"39' - 4 5/8"28' - 4 5/8"10' - 2 1/8"
COMBILIFT 453 MECHANICAL PARKING SYSTEM8 PARKING SPACES TOTAL
MECHANICALPARKING PIT
1.5
PARKING SYSTEM HPU
SUMP PUMP SEE MEP
BC.0
3
1.0
2' - 0"4' - 0"10' - 0"
BASEMENT-9' - 4"
VERTICAL BIKE STORAGE - ANCHORED TO WALL
2' - 0"6' - 0"DATE:
JOB NO.
DRAWN BY:
CHECKED BY:
SCALE:
LANDSCAPE ARCHITECT:OUTDOOR DESIGN STUDIOSALY ROSS3084 THORPE ROADBELGRADE, MT 59714
DRAWING TITLE:
SHEET NO.
THE CONTRACTOR IS RESPONSIBLE FOR MATERIALS, DETAILS AND ACCURACY, FOR CONFIRMING AND CORRELATING ALL QUANTITIES AND DIMENSIONS, FOR SELECTING FABRICATION PROCESSES, FOR TECHNIQUES OF ASSEMBLY, FORPERFORMING WORK IN A SAFE MANNER, AND FOR COORDINATING WORK WITH THAT OF ALL TRADES.COPYRIGHT 2024, ATELIER MEY ARCHITECTS, LLC.FIRE PROTECTION:SUMMIT FIRE & SECURITYJOE BURTELL
CIVIL:ALLIED ENGINEERING SERVICES, INC. RORY ROMEY32 DISCOVERY DRIVEBOZEMAN, MT 59718
MEP:WILLIAMS ENGINEERINGRYAN SULLIVAN370 COMPANION WAYBELGRADE, MT 59714
STRUCTURAL:BRITT, PETERS & ASSOCIATESDAVID IMPSON1435 W MOREHEAD ST. SUITE 140CHARLOTTE, NC 28208
D O N O T S C A L E D R A W I N G S , C O N T A C T A R C H I T E C T S W I T H Q U E S T I O N SARCHITECT:ATELIER MEY ARCHITECTS3642 WILLIAM AVEMIAMI FL 33133T: 612.414.7670LIC 29520 [SHAWNA MEYER]
OWNER:MISSOURI HEIGHTSSTEFFANIE HARING, JUSTIN HARING4600 SOURDOUGH RDBOZEMAN, MT 59715417-288-1328
CONTRACTOR:
SITE PLAN SUBMISSION
As indicated
12/31/2024 10:12:30 AMA-2
080
SEPTEMBER 25, 2024
HS
SM | CM
BASEMENT703 W MENDENHALL703 W MENDENHALL STBOZEMAN, MT 59715 1/4" = 1'-0"BASEMENT FLOOR PLAN1
1/2" = 1'-0"BICYCLE PARKING ELEVATION - TYPICAL2
No.Description Date
1 Revision 1 12/27/2024