HomeMy WebLinkAbout018_Ph_1_Traffic_Waiver_031125 March 11, 2025 Taylor Lonsdale, PE City of Bozeman 20 East Olive Street Bozeman, MT 59715 Reference: Traffic Impact Study Waiver Request – Bozeman Health Phase 1 Project No. 17095.13 Dear Taylor: The purpose of this letter is to provide information to support a traffic impact study (TIS) waiver request for Phase 1 of the Bozeman Health Campus Master Plan. A TIS was previously completed in support of the original master site plan, which was submitted in November of 2023. Phase 1 now does not include any new building square footage The current Phase 1 plan proposes expansion of Lot E further west to add approximately 162 parking spaces, expansion of Lot A to the northwest to add approximately 197 parking spaces, and removal of Lot I, which will displace approximately 150 parking spaces. The old maintenance yard will also be brought to compliance with this phase. The net number of new parking spaces added with Phase 1 will be 209. The current phasing plan is shown in the attached figure. The construction of additional parking is typically accompanied by an increase in demand. However, in this case the Phase 1 parking expansion serves to meet an existing demand for surplus spaces as determined through surveys of current patrons, and will allow for visitors to park closer to the building frontages. The proposed parking increase will also prepare the campus for future phases of the master plan, which will ultimately include a new building and two existing building expansions. Due to the above, trip generation estimates were not calculated for the proposed parking lot expansions. Future phases that include new building square footage will include trip generation calculations to evaluate consistency with the assumptions presented in the original TIS and review of recommendations from that study. The proposed Phase 1 parking expansion is likely to shift existing vehicles using Lot I to Lot E. The external ingress and egress routes from Highland Boulevard are not anticipated to change based on the Lot E expansion and therefore would not influence intersection operations. Access to the Lot A expansion will be via Entrance 1 Mr. Taylor Lonsdale, PE March 11, 2025 Page 2 from Highland Boulevard, and exiting vehicles will have the option to utilize a northbound one-way approach onto Ellis Street east of Lot G. This approach will be maintained as a northbound one-way road due to the large trucks that access a loading bay on the east side of Medical Office Building (MOB) 4. It is anticipated a higher demand of ingress trips to Lot A will utilize Entrance 1 and a higher demand of egress trips from Lot A will utilize Ellis Street. The intersections of Highland Boulevard with Old Highland Boulevard and Entrance 1 each have northbound left-turn lanes and Entrance 1 has a southbound right-turn lane. The Highland Boulevard/Ellis Street intersection is signalized with left-turn lanes on all four approaches. Each of these intersections is equipped to handle additional demand from a potential redistribution of parking demand on the site. If you have any questions or concerns, please feel free to contact me at 406-922-4326 or astoltzfus@sanbell.com. Sincerely, Audrey Stoltzfus, PE, RSP2I Project Engineer ARS/jhs Enc. P:17095.13_Bozeman_Health_Phase_1_Traffic_3.11.2025 MOB 2MOB 1 MOB 4 MOB 3 MOB 5 MOB 6 Highlan d Blv d A B C D E G F 2 1 Campus Parking Calculation 1 2 165 Parking Spaces 180 Parking Spaces NET NEW SPACES: 525 Spaces Parking Garage 55 displaced, 500 new 445 NET spaces + + – – 115 Displaced Spaces 150 Displaced spaces (With the removal of Lot I) Campus Phasing Plan PHASE 1 PHASE 3 PHASE 5 PHASE 2 PHASE 4 MOB 6 5 Floors, 100,000 Total SF Emergency Dept Expansion 7,500 Total SF Bridger Tower Expansion 2 New Floors, 32,000 Total SF Wayfinding Concourse Existing Parking Lot NamesA Parking Garage 500 total parking spaces Maintenance Yard Old maintenance yard to be brought to compliance Bozeman Health: Campus Phasing Plan I 162 197 539 Entrance 1