Loading...
HomeMy WebLinkAbout038 L-4.20 IRRIGATION DETAILS & NOTESIRRIGATION NOTES: 1.CONTRACTOR RESPONSIBLE TO INFORM LANDSCAPE ARCHITECT OF ANY DISCREPANCIES OR CHANGES REQUIRED TO THE IRRIGATION DESIGN. IF CONTRACTOR MAKES CHANGES TO THE IRRIGATION DESIGN WITHOUT APPROVAL FROM THE LANDSCAPE ARCHITECT. CONTRACTOR TO VERIFY STATIC PRESSURE IN THE FIELD PRIOR TO BIDDING AND CONSTRICTION. IN THE EVENT OF DISCREPANCY, CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT IN WRITING OF ANY CHANGES NECESSARY TO PROVIDE THE REQUIRED OPERATIONAL PRESSURE AND FLOW. CONTRACTOR ASSUMES FULL RESPONSIBILITY, COSTS, AND LIABILITIES ASSOCIATED WITH THOSE FIELD CHANGES OF THE IRRIGATION SYSTEM DESIGN AND PERFORMANCE. 2.CONTRACTOR SHALL INSPECT THE SITE AND VERIFY CONDITIONS AND DIMENSIONS PRIOR TO CONSTRUCTION. 3.IRRIGATION PLANS ARE SCHEMATIC REPRESENTATION ONLY. PLACE LINES IN A COMMON TRENCH WHENEVER POSSIBLE. FIELD ADJUST LINES TO AVOID CONFLICT WITH UTILITIES. 4.IRRIGATION IS COORDINATED WITH THE PLANTING PLAN AND SITE IMPROVEMENTS, COORDINATION IRRIGATION LAYOUT WITH FINAL INSTALLED LOCATION OF PLANT MATERIALS. DO NOT ALTER IRRIGATION LAYOUT OR VALVE LOCATION WITHOUT WRITTEN APPROVAL FROM THE LANDSCAPE ARCHITECT. NOTIFY LANDSCAPE ARCHITECT IF DISCREPANCIES OCCUR BETWEEN THE PLANS AND FIELD CONDITIONS. 5.PRIOR TO COMMENCING WORK, CONTRACTOR SHALL SCHEDULE A PRE-INSTALLATION MEETING WITH THE CITY OF BOZEMAN WATER CONSERVATION DIVISION. CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT OF SCHEDULED MEETING NO LESS THAN 2 WEEKS PRIOR. 6.POINT OF CONNECTION (POC): IS ASSUMED 1-1/2" WATER SERVICE LINE WITH STATIC PRESSURE OF 65 PSI, LOCATION SHOWN APPROXIMATE. VERIFY IN THE FIELD PRIOR TO INSTALLATION. TAP LINE AND SET WATER METER. THIS SYSTEM IS DESIGNED FOR A 1-1/2" WATER METER WITH 60PSI STATIC PRESSURE, 53.1 GPM DESIGN CAPACITY AND MAXIMUM WORK PRESSURE OF 40 PSI. 7.ALL TEMPORARY IRRIGATION AREAS SHALL USE IRRIGATION QUICK COUPLERS AS INDICATED, VIA TEMPORARY ABOVEGROUND OVERHEAD SPRAY. ONCE PLANT MATERIALS HAVE BEEN ESTABLISHED, TEMPORARY IRRIGATION EQUIPMENT SHALL BE REMOVED. 8.THE CONTRACTOR SHALL PROVIDE FINAL IRRIGATION SCHEDULING PROGRAMMED TO OPERATE WITHIN THE CITY OF BOZEMAN'S WATERING WINDOW OUTLINE IN BMC 40.02.1290. 9.CONTRACTOR RESPONSIBLE FOR SCHEDULING A PUNCH-LIST SUBSTANTIAL COMPLETION INSPECTION AND FINAL COMPLETION INSPECTION WITH LANDSCAPE ARCHITECT. PRIOR TO INSPECTIONS, IRRIGATION MAINLINE TO BE CHARGED FOR A MINIMUM TWO HOURS AND VALVE BOXES AND EQUIPMENT HOUSINGS SHALL BE OPEN TO VIEW. 10.CONTRACTOR RESPONSIBLE FOR FURNISHING IRRIGATION AS-BUILTS TO LANDSCAPE ARCHITECT TWO WEEKS FROM COMPLETION OF FINAL COMPLETION INSPECTION. 11.PROVIDE PRESSURE REDUCING VALVE UP STREAM OF BACKFLOW ASSEMBLY IF PRESSURE EXCEEDS 80 PSI. REDUCE TO 65 PSI STATIC PRESSURE. 12.ALL PIPE SIZES INDICATED ARE MINIMUMS. CONTRACTOR MAY NOT DECREASE PIPE SIZE. LARGER PIPE SIZES MAY BE USED AT NO ADDITIONAL COST TO OWNER. PIPE SIZES INCREASE IN SIZE DOWNSTREAM OF NEXT PRAY HEAD AS SHOWN. 13.INSTALL ALL IRRIGATION PIPE AND CONTROL WIRE IN MINIMUM 4" PVC SLEEVE BELOW ALL PAVED SURFACES UNLESS OTHERWISE INDICATED ON THE PLANS. INSTALL SLEEVES PRIOR TO PLACEMENT OF PAVEMENTS AND PAVEMENT SUB-BASE. WHERE PAVEMENT EXISTS, BORE AND PLACE SLEEVES. 14.CONTRACTOR TO PROGRAM AUTOMATIC CONTROLLER TO ALLOW FOR THE EQUIVALENT OF 1" OF WATER PER WEEK FOR ALL PLANTINGS UNLESS OTHERWISE INDICATED WITHIN THE PLANS WATERING SCHEDULE, OR PER SITE AND PLANTING NEEDS FOR BEST PLANT HEALTH. 15.ALL PVC PIPES SHALL BE TRENCHED UNLESS APPROVED IN WRITING TO ALLOW TO BE PULLED. POLY PIPE MAY BE PULLED. PROVIDE POSITIVE DRAINAGE OF MAINLINE. PLACE MANUAL DRAIN AT LOW POINTS IN MAINLINE. IDENTIFY LOCATIONS OF DRAINS ON AS-BUILTS. 16.CONTRACTOR TO INSTALL CONTROLLER AND ACCESSORIES AS REQUIRED. CONTRACTOR FURNISH CONTROL WIRES FROM VALVES TO CONTROLLER. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION FROM EXISTING ELECTRICAL SERVICE AND CONNECTION TO CONTROLLER. INSTALL ONE (1) ADDITIONAL RED CONTROL WIRE AND ONE (1) ADDITIONAL WHITE CONTROL WIRE FROM CONTROLLER TO END OF MAINLINE. 17.ALL TREES TO BE ON A DEDICATED DRIP ZONE FOR DROUGHT PREPARATION. 18.WATER BUDGETS AND PROJECTIONS HAVE BEEN PREPARED BASED UPONE ASSOCIATED PROJECTED WATER USE UPON CITY OF BOZEMAN WATER CONSERVATION DISTRICT LANDSCAPE & IRRIGATION STANDARDS, AND THE CITY OF BOZEMAN PROVIDED WATER BUDGET CALCULATOR. THE BUDGETS AND PROJECTIONS ASSUME BEST MANAGEMENT PRACTICES FOR IRRIGATION SYSTEM MAINTENANCE. FIELD STUDIO LANDSCAPE ARCHITECTS IS NOT RESPONSIBLE AND ACCEPTS NO LIABILITY FOR THE ACTUAL WATER USAGE VARIATION THAT IS A RESULT OF FIELD MODIFICATION TO THE SYSTEM NOT MATCHING CONSTRUCTION DOCUMENTS, IMPROPER MAINTENANCE AND OPERATION OF THE SYSTEM, WASTE DUE TO SYSTEM DAMAGE OR VANDALISM, OR WEATHER CONDITIONS THAT DEVIATE FROM PUBLISHED 30-YEAR HISTORICAL AVERAGES DATA. DATE ●ISSUE SHEET OF PROJECT NUMBER: SHEET TITLE  N R O U S E A 9 E  B O =E M A N  M T    Z Z Z I L H O G V W X G L R O D F R P EVERGOODSIRON HORSE ROAD2421.00 L-4.20 IRRIGATION DETAILS & NOTES 6 7 2025.01.27 CITY SUBM. 2025.03.17 R1 CMTS. NOTES: 1.SEE IRRIGATION LEGEND FOR MAINLINE SIZE AND TYPE. 2.ALL SLEEVES SHALL BE SCH. 40 PVC PIPE. 3.ALL SLEEVES SHALL EXTEND 12" BEYOND THE EDGE OF PAVEMENT. 4.END OF SLEEVES SHALL BE LOCATED WITH A WOODEN STAKE OR PVC PIPE. LOCATORS SHALL RUN CONTINUOUSLY FROM THE END OF THE SLEEVE TO FINISHED GRADE. PIPE BENEATH PAVEMENT 1" = 1'-0"3'-0"-0"PAVEMENT1 BASE ROCK2 CLEAN BACKFILL, 95% RELATIVE COMPACTION UNDER PAVING OR PER CIVIL ENGINEER'S PLANS 3 CONTROL WIRES, SLEEVE UNDER PAVING. INSTALL ADJACENT TO PRESSURIZED MAINLINE. BUNDLE SHALL BE NO MORE THAN 50% OF PIPE DIAMETER 4 MAINLINE, SLEEVE UNDER PAVING TO BE TWO TIMES THE DIAMETER OF THE PRESSURIZED MAINLINE PIPE 5 NON-PRESSURIZED LINE, SLEEVE UNDER PAVING TO BE BE TWO TIMES THE DIAMETER OF THE LATERAL LINE 6 1 2 3 4 5 6 1 FX-IR-FX-AUXEQ-05 THRUST BLOCKING 3/4" = 1'-0" PLAN VIEWS SECTION VIEWS 45 DEG. ELBOW TEE 90 DEG. ELBOW END OF LINE CAPPED LINE 1 UTILITY BOX 1 1 2 2 POURED IN-PLACE CONCRETE, 120 LBS. MINIMUM, TYPICAL1 FINISHED GRADE2 2 FX-IR-FX-AUXEQ-11 IRRIGATION TRENCHING 1 1/2" = 1'-0" 1 2 NOTES: 1.SEE IRRIGATION LEGEND FOR MAINLINE AND LATERAL LINE PIPE SIZE AND TYPE. 2.DIRECT BURIAL CONTROL WIRES SHALL BE INSTALLED IN SCH. 40 PVC ELECTRICAL CONDUIT IF REQUIRED. 3.2-WIRE IRRIGATION WIRE SHALL BE INSTALLED IN SCH. 40 PVC ELECTRICAL CONDUIT. 4.DETECTABLE LOCATOR TAPE SHALL BE LOCATED SIX INCHES (6") ABOVE THE ENTIRE MAINLINE RUN. 24" MIN.6"1'-0" IN PLANTING AREAFINISHED GRADE1 PAVEMENT2 NON-PRESSURIZED LINE (LATERAL LINE) 3 DETECTABLE LOCATOR TAPE4 PRESSURIZED LINE (MAINLINE)5 DIRECT BURIAL LOW VOLTAGE CONTROL WIRES 6 3 4 5 61'-6" IN PLANTING AREA3'0" UNDERNEATH PAVEMENT3 FX-IR-FX-AUXEQ-08 MAINLINE WITH SAND BEDDING 1 1/2" = 1'-0"4"MIN.4" MIN. 4" MIN.4"MIN.DEPTH AS PER SPECIFICATION1 WIDTH VARIES 3 4 BEDDING FINISHED GRADE1 NATIVE SOIL BACKFILL COMPACT TO 95% COMPACTION 2 PVC MAINLINE3 BACKFILL WITH 100% COARSE SAND, WATER JET AND MECHANICALLY COMPACT TO 90% OPTIMUM DENSITY. ALLOW 48 HOURS TO SETTLE, AND BACKFILL AND COMPACT WITH NATIVE SOIL 4 2 4 FX-IR-FX-AUXEQ-13 REVIEW SET