7 BMC 38.540.050.A; (subsections 4, 5, and 6): Bicycle parking shall be provided for
all uses included in the proposed project with access by both visitors and residents
since this is a development that includes both. For residential uses in the building,
the Applicant is required to provide bicycle parking at a rate of one (1) bicycle
parking space per residential unit. These spaces may be placed on the interior or
exterior of the building although it is preferred to have a mix given resident user
patterns of both long and short-term storage. In addition, for non-residential spaces
in the building, the Applicant is required to provide bicycle parking, as outlined in
Table 38.540.050-6 of the BMC. Placement of the spaces for non-resident use
should be as stated in 38.540.050.A.4 and 38.540.050.A.5. Theses spaces need to
be accessible without controlled access to the interior of the building.
BMC 38.540.050.A.5 (a-c): Provide information on type of rack provided on the
exterior of the building so that it complies with the code. In addition, the bicycle
parking on the exterior of the building appears to be more than 50' away from the
main commercial entrance. Since this site is very confined due to size and coverage
with the building configuration, placing the bicycle parking further from the entrance
near the alley is obviously not ideal. If this is necessary due to site constraints it is
advisable to sign the location of the bicycle parking if it is hidden behind the building.
Additional bicycle parking is located along N 7th
Ave adjacent to the commercial entry. Bicycle
rack cut sheets are provided in the project
narrative. **Please note unit plan layout and
count updates in levels 2-4
A-1, Project Narrative
12 BMC 38.520.060.B.1.e Usable residential open space, shared rooftop decks. For
mixed-use buildings, up to 100 percent of the required open space may be provided
by shared roof decks located on the top of buildings which are available to all
residents and meet the requirements of subsection B.5 below. Please update the
submitted project narrative to describe how the proposed rooftop deck will comply
with the requirements of subsection B.5 in order to qualify as usable open space.
The updated information in the revised narrative for the proposed rooftop deck does
not adequately address the criteria in BMC 38.520.060.B.5. Please submit
documentation or drawings showing how the space will be enclosed with railings,
landscaped, surfaced, and other amenities to demonstrate compliance with this
section in order to count towards the required shared open space.
Sheet A-12 added to show enlarged rooftop
deck plan. Additional information added to the
project narrative. Rooftop deck will be enclosed
with 42" railings, surfaced with pedestal pavers
that allow drainage to sloped insulation below,
and furnished with seating. Landscaped
planters will be maintained by building
management and will not require irrigation.
**Please note unit plan layout and count
updates in levels 2-4
Narrative Submission,
A-12
Principals:
RESPONSE DRAWING TAG
TRANSPORTATION CANDACE MASTEL
PLANNING BAILEY MINNICH
3/7/2025
City of Bozeman
Response to Site Plan Review
Project Name: 24482
Missouri Heights SP
13 BMC 38.530.070.C. Blank Wall Treatments. Untreated blank walls visible from a
public street, pedestrian-oriented space, common usable open space, or pedestrian
pathway are prohibited. Blank wall is further defined in BMC 38.700.030 as a ground
floor wall or portion of a ground floor wall that does not include a transparent window
or door. The proposed northern elevation would meet the definition of a blank wall.
Although staff is aware the intent of the proposed building is for a zero-lot line
configuration, until a future building is constructed on the adjacent lot this northern
wall would meet the blank wall definition. Staff recommends a temporary solution for
the ground floor level which we could address in the staff report findings. Some
temporary solutions available in the code include multiple vertical trellises or a mural,
which could be removed at a future date. Please provide an updated elevation plan
on how the applicant will address the ground floor level blank wall to continue
adequacy review. The methods to treat blank walls under BMC 38.530.070.C list
potential options for addressing the ground floor elevation. While one of those
methods is a mural, the proposed painted infographics depicted on the north
elevation would not qualify. Mural is defined in BMC 38.700.120 as "A visual
representation using texture, colors, forms, or symbols, which does not meet the
definition of a sign, placed on a solid, nontransparent vertical surface such as a wall
of a building." Please provide a revision to the north elevation adding visual interest
at the pedestrian scale or submit a mural which the director can review for approval.
North wall elevation updated. Approach to
appeal to pedestrian scale includes variation in
corrugated metal panel. Siding to change
colors, dimensions of panels to be coordinated
with siding manufacturer but will appeal to
pedestrian scale.
A-10
15 BMC 38.540.050.A.5.c.3 Bicycle parking location. Bicycle parking may be provided
within a building, but the location must be easily accessible. It appears the only
access to the bike parking location in the basement level is through the residential
areas which would not allow the general public to utilize the proposed bike parking.
Please provide documentation on how the required bike parking for the commercial
spaces will be accessible to comply with the requirements in order to continue
adequacy review. The proposed bicycle parking along W Mendenhall and the alley is
located more than 50-feet away from an entrance to the building the bicycle parking
is required to serve per BMC 38.540.050.A.5.c.1. Since 2 of the proposed bicycle
spaces are required for the commercial areas, the locations must be within 50-feet of
the commercial entrances.
See comment on Item #7 A-1
17 BMC 38.570.040.G.5 Miscellaneous site lighting specifications. All outdoor lighting
must be designed and located such that the maximum illumination measured in
footcandles at the property line may not exceed 0.3 onto adjacent residential
properties and 1.0 onto adjacent commercial properties and public rights-of-way. The
submitted photometric plan appears to show the site lighting along W Mendenhall
exceeds the maximum 1.0 footcandle allowance onto the public right-of-way. Please
submit an updated photometric plan showing compliance with this requirement to
continue adequacy review. It appears with the changes to the updated lighting plan,
all the numeric values were removed identifying the proposed lighting footcandles.
Also, no information was provided on the building entrance lighting which must
average 5.0 maintained footcandles per BMC 38.570.040.B. Please replace the
numeric footcandles and include the average building entrances maximums on an
updated lighting plan.
See updated drawings and cut sheets provided.E210
18 BMC 38.570.040.G. Site lighting, miscellaneous site lighting specifications. Except
as otherwise allowed in subsections E and G of this section, all lighting must comply
with the following requirements. Portions of the submitted lighting plan include
question marks indicating the applicant has not decided what light fixture will be
installed. Please submit details and cutsheets for all proposed exterior fixtures
demonstrating compliance with full cut-off requirements. Thank you for the updated
lighting information. I'm still unclear if the proposed L-1 lights within the shared
courtyard and along N 7th Ave will be dark sky compliant as they look like track
lighting. Please explain how the lights will comply with 38.570.040.G.7.
See updated drawings and cut sheets provided.E210
25 DSSP V. A. 3. 3. A design report prepared by a professional engineer licensed in the
State of Montana demonstrating compliance with these requirements shall be
submitted to and approved by the City of Bozeman prior to plan and specification
submittal if using the self-certification process or with the plans and specifications if
using the standard process for any new development. Design parameters and the
critical conditions shall be shown on a overall plan of the study area. An overall plan
of the development, including all areas outside of the study area which would
naturally be served through the study area shall be included. Please add in fire flows
and determine if the current 6 inch water main is adequate to serve the proposed
development. If a fire hydrant is needed, that will also need to be considered in the
report. This information is required at site plan to determine necessary infrastructure
mitigation to serve the proposed development and feasibility.
See water design report.Water Design Report
ENGINEERING SUZANNE RYAN
26 DSSP V.B. 2. 2. A design report prepared by a professional engineer licensed in the
State of Montana demonstrating compliance with these requirements shall be
submitted to and approved by the City of Bozeman prior to plan and specification
submittal if using the self-certification process or with the plans and specifications if
using the standard process for any new development. Design parameters and the
critical conditions shall be shown on an overall plan of the study area. An overall plan
of the development, including all areas outside of the study area which would
naturally be served through the study area shall be included. A sanitary sewer
design report that includes the new service and 8 inch main connection into 8th must
be included. This information is required at site plan to determine necessary
infrastructure mitigation to serve the proposed development and feasibility.
See sanitary sewer design report.Sanitary Sewer Design
Report
Atelier Mey
www.ateliermey.net
T: 612.414.7670
Shawna Meyer,
AIA
Christopher Meyer,
AIA
1 1. need minimum of 50 foot straight approach to front of refuse container. 2. need
detailed plan for refuse enclosure
A 50 foot approach has been shown on A-1.
The existing powerlines above this approach
are 31 feet above the pavement at the lowest
point. Per the solid waste brochure, as this is a
condiminium, and trash is collected from the
rear alley, a refuse enclosure is not required or
provided.
A-1
2 BMC 38.410.130. Water Adequacy: The project's estimated annual municipal
demand from the project is 0.1.39 acre-feet. A credit volume of 0.01 acre-feet has
been applied based on the historic metered demand from the properties reducing the
development's demand to 1.38 acre-feet which must be offset. At the City's current
CILWR fee rate of $6,000/AF the CILWR fee for the project is
Understood. Client is ready to pay fee. Please
provide a link for payment or confirm payment
process.
3 Recommend a minimum of 20 gallons per week for each tree. In June/July we
typically recommend doubling that to 40 gallons per week.
Irrigation water schedule is based off the
Irrigation Water Budget Calculator set forth by
the Water Conservation Division.
L301
4 Please coordinate with NWE on removal of old services and install of new ones. If
meters are to be screened, there needs to be a 4ft clear zone in front of them.
OK. See A-1 and C1.4, 4 feet minimum clear
provided in front of meters.
C1.4
5 A subdivision exemption will need to be recorded combining these two lots, which
will create a new legal description. I can address these after I know what that is.
Ok, please let us know what information is
needed from the Design Team. We did not
understand that we are combining lots, can you
clarify this for us?
6 It will need to be decided whether these units are condos (to be bought and sold
individually) or leased units. We would also need to know the name of the
development as that is also part of the legal description to be able to address these
units.
The units are to be condos, bought and sold
separately; Placeholder name of the
development is Missouri Heights.
Principals:
RESPONSE DRAWING TAG
SOLID WASTE RUSSELL WARD
WATER RIGHTS GRIFFIN NIELSON
$8,285. Payment
must be made prior to the final site plan approval.
FORESTRY DIVISION ALEX NORDQUEST
NORTHWESTERN ENERGY MATT TILSTRA
ADDRESSING JENNY CONNELLEY
12/31/2024
City of Bozeman
Response to Site Plan Review
Project Name: 24482
Missouri Heights SP
TRANSPORTATION CANDACE MASTEL
PARKS DEPARTMENT ROSS KNAPPER
FIRE DEPARTMENT SCOTT MUELLER
PLANNING BAILEY MINNICH
7 BMC 38.540.050.A; (subsections 4, 5, and 6): Bicycle parking shall be provided for
all uses included in the proposed project with access by both visitors and residents
since this is a development that includes both. For residential uses in the building,
the Applicant is required to provide bicycle parking at a rate of one (1) bicycle
parking space per residential unit. These spaces may be placed on the interior or
exterior of the building although it is preferred to have a mix given resident user
patterns of both long and short-term storage. In addition, for non-residential spaces
in the building, the Applicant is required to provide bicycle parking, as outlined in
Table 38.540.050-6 of the BMC. Placement of the spaces for non-resident use
should be as stated in 38.540.050.A.4 and 38.540.050.A.5. Theses spaces need to
be accessible without controlled access to the interior of the building.
Ground floor bicycle parking located at rear of
site near alley. Additional bicycle parking
located at basement level. See A-1 for bicycle
parking calculations.
A-1
8 Please add a narrative section that describes how the project intends to meet
parkland dedication requirements and requests CILP instead of required land
dedication. Parkland dedication of 0.03 acres of parkland is required unless applicant
requests a modification to land dedication requirements and requests cash-in-lieu of
parkland. Cash-in-lieu request for 0.03 acres of land dedication must include a
written request and justification for CILP request based on city commission criteria
established in Resolution 4784.
These calculations are provided on sheet A-0; a
section for Parks Department and a signed
letter confirming payment on the specified
amount is added to the Narrative Submission.
A-1 and Narrative
Submission
9 Proposed FDC location is over 100 feet to fire hydrant at NE corner of N 7th/W
Mendenhall intersection. Add fire hydrant to meet requirement.
Proposed FDC location updated on all plans to
be located at east corner of proposed building
to mitigate the cost to the small project of
adding a fire hydrant.
C1.3
10 BMC 38.220.080 Site Plan submittal requirements. Please revise the Project
Narrative to remove all references to 10 residential units in order to continue
adequacy review. At least one section on page 12 still contains verbiage related to
10 units instead of the proposed 9 units, but there may be others. The narrative must
be consistent with the remainder of the proposed site plan application.
Site plan drawings and narrative coordinated to
reflect 10 units. The 4th floor changed since the
original submission to match the 2nd and 3rd
floor - totalling 10 units.
Narrative
Submission
11 BMC 38.400.100.E Street Vision Triangle. The review authority may grant a
departure from the standards of this section for intersections with traffic signals,
intersections on one-way streets, or intersections on streets classified as an urban
route by the Montana Department of Transportation. Departure criteria are: a revision
can be accomplished without jeopardizing the public's health, safety and welfare, the
intent of this chapter, or the intent of the city's growth policy. The Engineering
Department must approve the departure request prior to approval of the site plan
application.
Engineering department to approve departure
request via correspondence with project
planner Jacob Doesschate and engineering
review Suzanne Ryan.
12 BMC 38.520.060.B.1.e Usable residential open space, shared rooftop decks. For
mixed-use buildings, up to 100 percent of the required open space may be provided
by shared roof decks located on the top of buildings which are available to all
residents and meet the requirements of subsection B.5 below. Please update the
submitted project narrative to describe how the proposed rooftop deck will comply
with the requirements of subsection B.5 in order to qualify as usable open space.
Project narrative updated to reflect proposed
rooftop deck, courtyard, and unit balconies
compliance with subsection B.5.
Narrative
Submission
13 BMC 38.530.070.C. Blank Wall Treatments. Untreated blank walls visible from a
public street, pedestrian-oriented space, common usable open space, or pedestrian
pathway are prohibited. Blank wall is further defined in BMC 38.700.030 as a ground
floor wall or portion of a ground floor wall that does not include a transparent window
or door. The proposed northern elevation would meet the definition of a blank wall.
Although staff is aware the intent of the proposed building is for a zero-lot line
configuration, until a future building is constructed on the adjacent lot this northern
wall would meet the blank wall definition. Staff recommends a temporary solution for
the ground floor level which we could address in the staff report findings. Some
temporary solutions available in the code include multiple vertical trellises or a mural,
which could be removed at a future date. Please provide an updated elevation plan
on how the applicant will address the ground floor level blank wall to continue
adequacy review.
North wall elevation updated. Approach is
poured concrete stem wall, painted block wall
with painted infographic, and corrugated metal
siding.
A-10
14 BMC 38.540.050.A.1.a.1. Number of parking spaces, Residential uses. The width of
drive accesses, designated non-parking areas, vision triangles, and similar
circumstances may not be considered to be available for the purpose of on-street
parking space. Per the Vision Triangle diagram on the site plan, it appears the space
closest to the intersection is located within the street vision triangle. Please amended
the proposed site plan and parking calculations to remove any on-street parking
spaces that would be located within the street vision triangles along W Mendenhall to
continue adequacy review.
Site plan amended to remove on-street parking
that would be located within a street vision
triangle
A-1
15 BMC 38.540.050.A.5.c.3 Bicycle parking location. Bicycle parking may be provided
within a building, but the location must be easily accessible. It appears the only
access to the bike parking location in the basement level is through the residential
areas which would not allow the general public to utilize the proposed bike parking.
Please provide documentation on how the required bike parking for the commercial
spaces will be accessible to comply with the requirements in order to continue
adequacy review.
See comment on Item #7 A-1
16 BMC 38.540.050.A.5. Bicycle parking standards. The intent of this sub section is to
ensure required bicycle racks are designed so bicycles may be securely locked to
them without undue inconvenience and will be reasonably safeguarded from
accidental damage. Please provide the bike rack type and details as required to
comply with these standards.
See provided cut sheets and bicycle parking
locations on A-1 and A-2/
A-1, CUT SHEETS
17 BMC 38.570.040.G.5 Miscellaneous site lighting specifications. All outdoor lighting
must be designed and located such that the maximum illumination measured in
footcandles at the property line may not exceed 0.3 onto adjacent residential
properties and 1.0 onto adjacent commercial properties and public rights-of-way. The
submitted photometric plan appears to show the site lighting along W Mendenhall
exceeds the maximum 1.0 footcandle allowance onto the public right-of-way. Please
submit an updated photometric plan showing compliance with this requirement to
continue adequacy review.
Updated photometric drawing provided.E210
18 BMC 38.570.040.G. Site lighting, miscellaneous site lighting specifications. Except
as otherwise allowed in subsections E and G of this section, all lighting must comply
with the following requirements. Portions of the submitted lighting plan include
question marks indicating the applicant has not decided what light fixture will be
installed. Please submit details and cutsheets for all proposed exterior fixtures
demonstrating compliance with full cut-off requirements.
Updated photometric drawing provided.E210
19 BMC 38.560.020 Sign Permit Requirements. No signs are being permitted with this
application. Any signage will be required to receive a subsequent building permit.
Confirmed.
20 "City of Bozeman Landscape and Irrigation Performance and Design Standards
Manual" - 3.2.1 - "Landscape Design Approval Pathways". Greenspire Littleleaf
Linden has a 0.6 PF. The prescriptive pathway only allows for 0.3/0.1 PF plants.
Therefore, this tree cannot be used with the prescriptive pathway. To meet
compliance, the applicant can replace the linden with another tree or use the
performance approach instead of the prescriptive approach.
The performance approach has been utilized in
place of the prescriptive approach to utilize
higher water trees. See sheet L102.
L102
21 "City of Bozeman Landscape and Irrigation Performance and Design Standards
Manual" - 3.3.3 - "Irrigation Design Standards" - Item 1). Current backflow device
(double check valve) does not meet the 2021 Uniform Plumbing Code’s criteria for
backflow prevention in a high hazard zone (irrigation and landscaping) – Table 603.2
and 602.3 2021 UPC. Change backflow prevention device to a compliant model.
The backflow device has been changed to a
compliant model, see irrigation schedule sheet
L301.
L301
22 "City of Bozeman Landscape and Irrigation Performance and Design Standards
Manual" - 3.2.1 - "Soil Quality Requirements" - Item 2)b). Soil texture does not need
to be amended if recommended by a soil test.
Soil quality requirement have been changed to
require amendments in place of soil test due to
small planting area.
23 "City of Bozeman Landscape and Irrigation Performance and Design Standards
Manual" - 3.1.3. Prior to commencing any work, the applicant must contact the Water
Conservation Division to schedule a preinstallation meeting. Include a note on the
landscaping and irrigation plans that the applicant’s team will need to schedule this
preinstallation meeting.
Added to notes on landscape and irrigation
plans.
All L Sheets
24 "City of Bozeman Landscape and Irrigation Performance and Design Standards
Manual" - 3.1.2. A signed copy of the Building Permit Landscape & Irrigation
Self-Certification Form (Appendix E) is necessary to receive a building permit.
Noted.
WATER CONSERVATION MATTHEW LEE
ENGINEERING SUZANNE RYAN
25 DSSP V. A. 3. 3. A design report prepared by a professional engineer licensed in the
State of Montana demonstrating compliance with these requirements shall be
submitted to and approved by the City of Bozeman prior to plan and specification
submittal if using the self-certification process or with the plans and specifications if
using the standard process for any new development. Design parameters and the
critical conditions shall be shown on a overall plan of the study area. An overall plan
of the development, including all areas outside of the study area which would
naturally be served through the study area shall be included. Please add in fire flows
and determine if the current 6 inch water main is adequate to serve the proposed
development. If a fire hydrant is needed, that will also need to be considered in the
report.
This will be addressed in the infrastructure
review submittal.
26 DSSP V.B. 2. 2. A design report prepared by a professional engineer licensed in the
State of Montana demonstrating compliance with these requirements shall be
submitted to and approved by the City of Bozeman prior to plan and specification
submittal if using the self-certification process or with the plans and specifications if
using the standard process for any new development. Design parameters and the
critical conditions shall be shown on an overall plan of the study area. An overall plan
of the development, including all areas outside of the study area which would
naturally be served through the study area shall be included. A sanitary sewer
design report that includes the new service and 8 inch main connection into 8th must
be included.
This will be addressed in the infrastructure
review submittal.
27 BMC 38.270.030.D Infrastructure approval must be obtained prior to building permit
issuance for concurrent construction. The applicant has received initial approval for
concurrent construction but must satisfy all requirements of concurrent construction.
The following will need to be submitted prior to building permit issuance: 1.
Infrastructure Approval (City and DEQ) 2. Written approval from Fire Marshall 3.
Irrevocable Offer of Dedication (IOOD) 4. Concurrent Construction Plan
Noted.
28 N 7th Ave is a MDT controlled route . Please provide approval from MDT or
correspondence from MDT indicating that this project does not need to go through
systems impact.
Email correspondence with Kristina Kilts at
MDT indicating that this project does not need
to go through systems impact provided as
document 051_MDTSystemsImpact.
29 38.410.060 B.2.a. Easement size a. Front setback utility easements. Front setback
utility easements must be ten feet wide, and must always be provided unless written
confirmation is submitted to the community development department from all utility
companies providing service indicating that front setback easements are not needed.
The only private utility is Northwestern Electric;
Letter provided stating easement is not
required.
30 38.540.020 M. Snow removal storage areas. Snow removal storage areas must be
provided sufficient to store snow accumulation on site. Such areas may not cause
unsafe ingress/egress to the parking areas, may not cause snow to be deposited on
public rights-of-way, may not include areas provided for required parking access and
spaces, and may not be placed in such a manner as to damage landscaping. All
snow removal storage areas must be located and designed such that the resultant
stormwater runoff is directed into landscaped retention/detention and water quality
improvement facilities as required by the engineering department, or in compliance
with the storm drainage provisions of chapter 40 article 4, and/or best practices
manual. Show Snow storage areas.
Snow storage designed per section 38.540.020
and provided per requirements. Please see the
revised snow storage areas on sheet C1.4 and
architectural plans. The snow storage area has
been removed from within the public
right-of-way.
C1.4
31 The City of Bozeman has implemented lane mitigation fees. For more information
please see:
https://www.bozeman.net/departments/transportation-engineering/engineering/devel
opment-center/permits.
Confirmed.