HomeMy WebLinkAbout004 TRIP GENERATION MEMO03/05/2025 Allied Engineering Services, Inc. Memo Page 2 (per 1,000-ft2) of general office space. Table 3 provides a summary of trips generated based on gross floor area (per 1,000-ft2) of bread/donut/bagel shop without drive-through window. Table 4 provides a summary of total trips generated by the proposed development conservatively assuming there are no internal trips between the residential and commercial spaces. According to the ITE manual, the weekday A.M. & P.M. peak hours of the Residential Condo/Townhouse and General Office typically coincide with the peak hour of the adjacent street traffic; therefore, only one A.M. & P.M. peak hour, which represents both the peak hour of the generator and the peak hour of the adjacent street traffic, is displayed. The Bread/Donut/Bagel Shop without a Drive Thru weekday A.M. & P.M. peak hour of the generator rates were unavailable. Therefore, peak hour of adjacent street traffic rates were used when calculating trips generated by the Bread/Donut/Bagel Shop without a Drive Thru. Please contact Wyatt Alt, Cole Oshiro-Leavitt and/or Rory Romey at 406-582-0221 or walt@alliedengineering.com; coshiro-leavitt@alliedengineering.com; rromey@alliedengineering.com with any questions or if additional information is required. Table 1 – Residential Condo/Townhouse (ITE 230) Trip Generation Based on Number of Dwelling Units Description Method Units Rate Total Trips % Entering % Exiting Trips Entering Trips Exiting Weekday, A.M. Peak Hour Dwelling Units 13 Ln(T)=0.80*L n(X)+0.26 7.9 17 83 1.3 6.6 Weekday, P.M. Peak Hour Dwelling Units 13 Ln(T)=0.82*L n(X)+0.32 11.3 67 33 7.6 3.7 1: T = Trips, X = Units Table 2 – General Office (ITE 710) Trip Generation Based on 1,000 Square Feet Gross Floor Area Description Method Units Rate Total Trips % Entering % Exiting Trips Entering Trips Exiting Weekday, A.M. Peak Hour 1000-FT2 Gross Floor Area 1.38 Ln(T)=0.80* Ln(X)+1.57 6.2 88 12 5.5 0.7 Weekday, P.M. Peak Hour 1000-FT2 Gross Floor Area 1.38 1.49 2.0 17 83 0.3 1.7 1: T = Trips, X = Units 03/05/2025 Allied Engineering Services, Inc. Memo Page 3 Table 3 – Bread/Donut/Bagel Shope w/o Drive-Thru (ITE 939) Trip Generation Based on 1,000 Square Feet Gross Floor Area Description Method Units Rate Total Trips % Entering % Exiting Trips Entering Trips Exiting Weekday, A.M. Peak Hour 1000-FT2 Gross Floor Area 0.55 70.22 39 47 53 18.1 20.4 Weekday, P.M. Peak Hour 1000-FT2 Gross Floor Area 0.55 28 15 50 50 7.7 7.7 Table 4 – Total Trips Generated by the Proposed Development Description Total Trips Weighted Average % Entering Weighted Average % Exiting Total Trips Entering Total Trips Exiting Weekday, A.M. Peak Hour 52.7 47.3 52.7 24.9 27.7 Weekday, P.M. Peak Hour 28.7 54.3 45.7 15.6 13.1