Loading...
HomeMy WebLinkAboutApplicant Email Submittal - 25035 Vaquero Land Swap ZMA1 Alicia Paz-Solis From:Brett Megaard <bmegaard@hyaliteeng.com> Sent:Friday, March 28, 2025 2:42 PM To:Alicia Paz-Solis Cc:Audrey Chorak; Tom Rogers; Cody Flammond Subject:Re: [EXTERNAL]Re: Scheduling Letter Ready for Download Notification for 25035 Vaquero Land Swap ZMA Attachments:21158 Park View Crossing PP FOF-signed.pdf; Parkview Crossing Aprroved Plans- reduced.pdf; Parl View Crossing Infrastructure Approval.pdf; EngineeringReport_ 11112021.pdf; EngineeringReportAppx_11112021.pdf CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hi Alicia- In regards to that comment, please see attached for the subdivision approval for Park View Crossing Major Subdivision, that was reviewed & approved with this bit of land that we are updating the zoning on now. I also included the plans so you can see where this is in relation to the ZMA piece, as well as the infrastructure approval and the corresponding engineering report to show that the water/sewer/traffic was already reviewed & approved on this. Let me know if you have any questions on this, or if you need anything else from me. Thanks, Brett Megaard, PE Senior Project Manager | Civil Group Leader P (406) 587-2781 | M (406) 581-5699 Hyalite Engineers, PLLC | 161 W. Haley Springs Road, Ste. 101 | Bozeman, MT 59718 North Dakota Offices - Valley City, Bismarck, Dunn Center Montana Office - Bozeman *Upcoming out-of-office from April 20th-April 26th with very limited availability* On Fri, Mar 28, 2025 at 11:34 AM Alicia Paz-Solis <apazsolis@bozeman.net> wrote: Hi Brett, I’ve taken over this review from Cody. 2 When you have a moment, could you please submit your response to Ref. #1 in ProjectDox? That will allow us to move forward with the Engineering review. Thanks so much, City of Bozeman MT Alicia Paz-Solis, EI | Transportation and Engineering (406) 582-2976 From: Brett Megaard <bmegaard@hyaliteeng.com> Sent: Friday, March 28, 2025 10:14 AM To: Audrey Chorak <achorak@BOZEMAN.NET>; Tom Rogers <TRogers@BOZEMAN.NET> Cc: Cody Flammond <CFlammond@BOZEMAN.NET>; Alicia Paz-Solis <apazsolis@BOZEMAN.NET> Subject: Re: [EXTERNAL]Re: Scheduling Letter Ready for Download Notification for 25035 Vaquero Land Swap ZMA CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good Morning Audrey and Tom- I was just checking in PDox and saw that everything on this is completed besides planning & engineering review, where do we sit on that? Is there anything I can do to help move this along? Thanks again for your guys' help, I do appreciate it. Thanks, Brett Megaard, PE 3 Senior Project Manager | Civil Group Leader P (406) 587-2781 | M (406) 581-5699 Hyalite Engineers, PLLC | 161 W. Haley Springs Road, Ste. 101 | Bozeman, MT 59718 North Dakota Offices - Valley City, Bismarck, Dunn Center Montana Office - Bozeman *Upcoming out-of-office from April 20th-April 26th with very limited availability* On Fri, Mar 7, 2025 at 4:03 PM Brett Megaard <bmegaard@hyaliteeng.com> wrote: Thanks Audrey! Thanks, Brett Megaard, PE Senior Project Manager | Civil Group Leader P (406) 587-2781 | M (406) 581-5699 Hyalite Engineers, PLLC | 161 W. Haley Springs Road, Ste. 101 | Bozeman, MT 59718 North Dakota Offices - Valley City, Bismarck, Dunn Center Montana Office - Bozeman On Fri, Mar 7, 2025 at 3:57 PM Audrey Chorak <achorak@bozeman.net> wrote: Hi Brett, I have uploaded these documents to Project Dox and notified Engineering and Planning of the new documents for review. 4 Thank you, Audrey Audrey Chorak Development Review Coordinator | Community Development City of Bozeman | 20 East Olive St. | P.O. Box 1230 | Bozeman, MT 59771 O: 406.582.2968 | C: 406.579.1471 | E: achorak@bozeman.net | W: www.bozeman.net/planning CUSTOMER SERVICE HOURS (Front Counter @ 20 East Olive, 59715): Open: M,W,F: 9 AM – 4 PM; & T, R: 9 AM – 1 PM From: Brett Megaard <bmegaard@hyaliteeng.com> Sent: Thursday, March 6, 2025 12:32 PM To: Tom Rogers <TRogers@BOZEMAN.NET> Cc: Cody Flammond <CFlammond@BOZEMAN.NET>; Alicia Paz-Solis <apazsolis@BOZEMAN.NET>; Audrey Chorak <achorak@BOZEMAN.NET> Subject: [EXTERNAL]Re: Scheduling Letter Ready for Download Notification for 25035 Vaquero Land Swap ZMA CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hi Tom- See attached for our ZMA map, narrative & noticing pieces. Since I didn't have a task open on my end, I figured this would be easier. Questions, let me know. Thanks, Brett Megaard, PE 5 Senior Project Manager | Civil Group Leader P (406) 587-2781 | M (406) 581-5699 Hyalite Engineers, PLLC | 161 W. Haley Springs Road, Ste. 101 | Bozeman, MT 59718 North Dakota Offices - Valley City, Bismarck, Dunn Center Montana Office - Bozeman On Tue, Feb 25, 2025 at 4:42 PM Brett Megaard <bmegaard@hyaliteeng.com> wrote: Sounds good, thanks Tom! I'll get this over to you here later this week. Thanks, Brett Megaard, PE Senior Project Manager | Civil Group Leader P (406) 587-2781 | M (406) 581-5699 Hyalite Engineers, PLLC | 161 W. Haley Springs Road, Ste. 101 | Bozeman, MT 59718 North Dakota Offices - Valley City, Bismarck, Dunn Center Montana Office - Bozeman On Tue, Feb 25, 2025 at 4:18 PM Tom Rogers <TRogers@bozeman.net> wrote: Brett, Thanks for your response and comments. In no particular order: 6  You are correct, the property is annexed. No annexation map required. I apologize for the confusion/concern  I see the editable metes and bounds description, all set  Please prepare a Zone Map with the details listed in the ZMA Checklist  The Commission needs the narrative addressing the State required zoning criteria in sufficient detail to make appropriate findings.  The notice pieces are also required, State requirements we cannot waive. If you have any questions please let me know. Tom Tom Rogers | Senior Planner | AICP City of Bozeman | 20 East Olive St. | P.O. Box 1230 | Bozeman, MT trogers@bozeman.net | P: 406.582.2268 | C: (406) 595-6445 Bozeman is updating its land development codes. Check out https://engage.bozeman.net/udc. From: Brett Megaard <bmegaard@hyaliteeng.com> Sent: Tuesday, February 25, 2025 2:14 PM To: Tom Rogers <TRogers@BOZEMAN.NET> Cc: Cody Flammond <CFlammond@BOZEMAN.NET>; Alicia Paz-Solis <apazsolis@BOZEMAN.NET>; Audrey Chorak <achorak@BOZEMAN.NET> Subject: [EXTERNAL]Re: Scheduling Letter Ready for Download Notification for 25035 Vaquero Land Swap ZMA CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hi Tom- 7 Just following up on this, let me know what your thoughts are or if you have any questions for me. Thanks, Brett Megaard, PE Senior Project Manager | Civil Group Leader P (406) 587-2781 | M (406) 581-5699 Hyalite Engineers, PLLC | 161 W. Haley Springs Road, Ste. 101 | Bozeman, MT 59718 North Dakota Offices - Valley City, Bismarck, Dunn Center Montana Office - Bozeman On Thu, Feb 20, 2025 at 11:18 AM Brett Megaard <bmegaard@hyaliteeng.com> wrote: Hi Tom- Thanks for your notes, I do appreciate it. I do have a couple questions/comments based on those; - The application does include the editable legal description, I double checked to make sure I didn't accidentally forget it - When Chris & I were going back and forth, I was under the impression that the legal survey that was already recorded for the land swap would suffice for the 'map' side of things - I was also under the impression that this chunk was already technically annexed into the City based on the land swap, but I could definitely be off on that. - As far as the narrative piece goes, I included a cover letter with the application as this seems pretty straight forward in terms of a ZMA goes. Considering that we requested this be done years ago and the legal side of the land swap has been recorded for a couple of years now, I thought this would suffice as the lot has already been updated. 8 I will get the noticing side of things wrapped up here shortly but would you just like that emailed over to you since I don't have an open task? Let me know your thoughts or if you have any questions for me. Thanks, Brett Megaard, PE Senior Project Manager | Civil Group Leader P (406) 587-2781 | M (406) 581-5699 Hyalite Engineers, PLLC | 161 W. Haley Springs Road, Ste. 101 | Bozeman, MT 59718 North Dakota Offices - Valley City, Bismarck, Dunn Center Montana Office - Bozeman On Wed, Feb 19, 2025 at 11:11 AM Alicia Paz-Solis <apazsolis@bozeman.net> wrote: All, I am forwarding this email chain to Cody, the assigned engineer for 25035 Vaquero Land Swap ZMA. City of Bozeman MT Alicia Paz-Solis, EI | Transportation and Engineering (406) 582-2976 From: Tom Rogers <TRogers@BOZEMAN.NET> Sent: Wednesday, February 19, 2025 10:35 AM 9 To: Brett Megaard <bmegaard@hyaliteeng.com> Cc: Audrey Chorak <achorak@BOZEMAN.NET>; Alicia Paz-Solis <apazsolis@BOZEMAN.NET> Subject: RE: Scheduling Letter Ready for Download Notification for 25035 Vaquero Land Swap ZMA Brett, The Development Review Committee is scheduled to consider the application next Wednesday, February 26. Comments will be provide after the meeting. However, I noticed a number of required documents that were not provided with the submittal. These are required before the City can consider the application. I know Chris S. provided this informational and it is outlined in the Annexation and associated ZMA applications. We require: · Annexation map · ZMA map · Narrative for annexation policy · Narrative for the ZMA · Notice requirements · Notice addresses · Editable legal description There may be other requirements that I have not fully considered until I hear from the other DRC members. Regards, Tom Rogers | Senior Planner | AICP City of Bozeman | 20 East Olive St. | P.O. Box 1230 | Bozeman, MT trogers@bozeman.net | P: 406.582.2268 | C: (406) 595-6445 Bozeman is updating its land development codes. Check out https://engage.bozeman.net/udc. 10 From: Brett Megaard <bmegaard@hyaliteeng.com> Sent: Monday, February 17, 2025 11:48 AM To: Tom Rogers <TRogers@BOZEMAN.NET> Subject: [EXTERNAL]Fwd: Scheduling Letter Ready for Download Notification for 25035 Vaquero Land Swap ZMA CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Morning Tom- Looks like this one came your way, so let me know if you have any questions or if you need anything from me. I had chatted with Chris quite a bit on this and our client is looking to get this taken care of as soon as possible, and considering that we brought it up and requested this be started years ago (long story), we would like to get this updated in short order. Thanks for your help! Please do reach out if you have any questions. Thanks, Brett Megaard, PE Senior Project Manager | Civil Group Leader P (406) 587-2781 | M (406) 581-5699 Hyalite Engineers, PLLC | 161 W. Haley Springs Road, Ste. 101 | Bozeman, MT 59718 North Dakota Offices - Valley City, Bismarck, Dunn Center Montana Office - Bozeman ---------- Forwarded message --------- From: Brett Megaard <bmegaard@hyaliteeng.com> Date: Mon, Feb 3, 2025 at 10:59 AM Subject: Fwd: Scheduling Letter Ready for Download Notification for 25035 Vaquero Land Swap 11 ZMA To: Chris Saunders <csaunders@bozeman.net> Good Morning Chris- Just thought I would forward this onto you as the application has been uploaded and paid, not sure who our reviewer will be (you?) but wanted to just make sure this was on the radar and to see if we can get this through as soon as possible. Thanks again for all your help so far, let me know if you have any questions or if you guys' need anything from me. Thanks, Brett Megaard, PE Senior Project Manager | Civil Group Leader P (406) 587-2781 | M (406) 581-5699 Hyalite Engineers, PLLC | 161 W. Haley Springs Road, Ste. 101 | Bozeman, MT 59718 North Dakota Offices - Valley City, Bismarck, Dunn Center Montana Office - Bozeman ---------- Forwarded message --------- From: <DoNotReplyBZMT@avolvecloud.com> Date: Mon, Feb 3, 2025 at 8:55 AM Subject: Scheduling Letter Ready for Download Notification for 25035 Vaquero Land Swap ZMA To: <bmegaard@hyaliteeng.com> To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet.Logo 12 City of Bozeman emails are subject to the Right to Know provisions of Montana’s Constitution (Art. II, Sect. 9) and may be considered a “public record” pursuant to Title 2, Chpt. 6, Montana Code Annotated. As such, this email, its sender and receiver, and the contents may be available for public disclosure and will be retained pursuant to the City’s record retention policies. Emails that contain confidential information such as information related to individual privacy may be protected from disclosure under law. City of Bozeman emails are subject to the Right to Know provisions of Montana’s Constitution (Art. II, Sect. 9) and may be considered a “public record” pursuant to Title 2, Chpt. 6, Montana Code Annotated. As such, this email, its sender and receiver, and the contents may be available for public disclosure and will be retained pursuant to the City’s record retention policies. Emails that contain confidential information such as information related to individual privacy may be protected from disclosure under law. City of Bozeman emails are subject to the Right to Know provisions of Montana’s Constitution (Art. II, Sect. 9) and may be considered a “public record” pursuant to Title 2, Chpt. 6, Montana Code Annotated. As such, this email, its sender and receiver, and the contents may be available for public disclosure and will be retained pursuant to the City’s record retention policies. Emails that contain confidential information such as information related to individual privacy may be protected from disclosure under law. City of Bozeman emails are subject to the Right to Know provisions of Montana’s Constitution (Art. II, Sect. 9) and may be considered a “public record” pursuant to Title 2, Chpt. 6, Montana Code Annotated. As such, this email, its sender and receiver, and the contents may be available for public disclosure and will be retained pursuant to the City’s record Scheduling Letter Ready for Download Notification Attention Brett: Congratulations! City Staff has preliminarily reviewed the application in accordance with the submittal checklist(s) and Chapter 38.220 of the Unified Development Code. This application meets submittal requirements and has been deemed acceptable for initial review. A Schedule Letter for 25035 Vaquero Land Swap ZMA has been prepared is ready for download. Click the "Project Access" link below to open the project and find your files in the City Documents and Staff Reports folder. Project: 25035 Vaquero Land Swap ZMA Description: 25035 Vaquero Land Swap ZMA Status: Approved Project Access | Login to ProjectDox If you do not have access to the specified folder, please contact the Project Administrator. Please do not reply to this email. 13 retention policies. Emails that contain confidential information such as information related to individual privacy may be protected from disclosure under law. Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 1 of 44 Bozeman City Commission Findings of Fact and Order for the Park View Crossing Major Subdivision Preliminary Plat; Project No. 21158 Public Hearing Date: City Commission, February 15, 2022 at 6:00 PM via Webex Project Description: This is a major subdivision application seeking to subdivide the 7-acre Lot 4 of Minor Subdivision 400 into 47 lots, including 44 residential townhouse lots. Project Legal Description: Lot 4 of Minor Subdivision 400 located in the NE ¼ of Section 3, Township 2 South, Range 5 East, P.M.M., City of Bozeman, Gallatin County, Montana. Project Location: This property is not addressed. It is located on Vaquero Parkway north of W. Oak Street, west of Davis Lane, east of N. Ferguson Avenue, and south of Baxter Lane. Development Review Committee (DRC) Recommendation: On November 19, 2021, the DRC determined that the application conformed to Bozeman Municipal Code (BMC) standards and was sufficient for approval with staff-recommended conditions and code provisions. Community Development Board (CDB) Recommendation: On December 20, 2021, the Community Development Board, serving as the City’s Planning Board, reviewed and considered the application materials, public comment, and all the information presented and, by a vote of 6 to 1, recommended approval of the Park View Crossing Preliminary Plat major subdivision with the conditions recommended by staff and all applicable code provisions. This recommendation did not include support of the Applicant’s requested subdivision variance to waive installation of a sidewalk along the west side of Stokes Lane. The Applicant withdrew this variance request on December 23, 2021 and it is not referenced herein. https://weblink.bozeman.net/WebLink/DocView.aspx?id=258464&dbid=0&repo=BOZEMAN Parks Plan Status: The required parkland contribution for this subdivision is still under discussion by the Applicant, the Bozeman Recreation and Parks Department and the Gallatin County Parks Department. Condition of Approval No. 2 requires the parkland plan to be approved by the Bozeman Recreation and Parks Department and submitted with the final Plat application. DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 2 of 44 City Commission Decision: On January 25, 2022, having reviewed and considered the application materials, public comment, and all the information presented, the City Commission, by a vote of 5 to 0, adopted the findings presented in the staff report for application 21158 and approved the Park View Crossing Major Subdivision Preliminary Plat with conditions and subject to all applicable code provisions. Commission Recommended Motion for this Finding of Fact and Order: Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in Section 7 of this staff report for application 21158 and move to authorize the Mayor to sign the Findings of Fact and Order on behalf of the City Commission, approving the Park View Crossing Major Subdivision Preliminary Plat with conditions and subject to all applicable code provisions. Report Date: February 2, 2022 Staff Contact: Susana Montana, Senior Planner, Development Review Division, Community Development Department Karl Johnson, Project Engineer, Engineering Department Agenda Item Type: Action (Quasi-judicial) EXECUTIVE SUMMARY Unresolved Issues Unresolved issues at this Preliminary Plat stage are related to parklands contributions and stormwater/water quality management issues which must be resolved prior to submittal of the final plat application. The final plat must satisfy all of the recommended preliminary plat conditions of approval and all relevant Bozeman Municipal Code (BMC) code provisions noted on pages 10 through 21 of this report. Project Summary This report is based on: (1) the September 24, 2021 revised plat maps; (2) the November 19, 2021 revised application documents; (3) the November 19, 2021 Development Review Committee recommendation for conditions and code provisions; (4) the December 20, 2021 Community Development Board recommendation; (5) the Applicant’s December 23, 2021 withdrawal of a sidewalk variance request; (6) the December 27, 2021 staff report to the City Commission which evaluated the application’s code compliance; (7) public comment received to date; (8) staff recommendations of conditions of approval and code provisions; (9) all information provided to the City Commission at their January 25, 2022 public hearing on this application; and (10) staff evaluation of the Montana Code Annotated (MCA) subdivision DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 3 of 44 statutes and relevant Bozeman Municipal Code (BMC) subdivision statutes described in this report. Application. The property owner/Applicant made application to develop the vacant property on the west side of Vaquero Parkway, south of Baxter Lane, north of W. Oak Street, west of Davis Lane and east of the Gallatin County Regional Park. The application proposes the subdivision of 7-acres into 47 lots: 44 residential lots consisting of nine fourplex lots, two triplex lots and one duplex lot; one common area stormwater facility lot; two common open space (mid-block crossing) lots; and associated streets and rights of way. Off-site improvements by the Applicant include a shared-use pathway along the west side of Vaquero Parkway along the subdivision’s frontage as partial fulfillment of his parkland contributions. The two mid-block crossing open space lots would be publicly-accessible and owned and maintained by the Homeowners Association (HOA). The stormwater pond lot would be owned and maintained by the HOA. The subject property was annexed to the City in 2000 and is zoned R-3, Medium-density Residential District. The property is currently vacant and includes limited natural features. Montana subdivision law requires Applicants to provide information about wildlife and habitat that may be affected by the subdivision. A small section of the Spring Ditch irrigation facility is located near the northern property boundary and encroaches into the northern portion of the subdivision’s stormwater easement. The Spring Ditch agricultural water facility would continue to flow and the existing irrigation easement located completely within the adjacent Gallatin County Regional Park would not be abandoned or altered with this subdivision. A neighbor of the proposed subdivision commented that a flock of partridges are frequently seen wandering about the Site and the adjacent 97-acre Gallatin County Regional Park. She asked if the Applicant conducted an environmental impact study to determine the effect of the development on these avian neighbors. The Applicant provided information regarding wildlife on the Site (see page 25 of this report). In response to this public inquiry, staff researched the Montana Natural Heritage Species of Concern and Potential Species of Concern lists and found that the partridge species of bird is not a Species of Concern and, therefore, is not subject to mitigation should their habitat be altered or removed. Due to the State Legislature’s passing of HB 259, MCA Section 76-3-514 prohibits the requirement for a subdivision to provide affordable housing per BMC Section 38.380 and this subdivision does not provide such affordable housing. However, the subdivision provides a mix of residential lot sizes and configurations which offer a mix of townhouse sizes and, one would expect, prices. All lots are in compliance with the R-3 zoning. Eighteen of the lots are sized to accommodate the addition of an Accessory Dwelling Unit (ADU). The subdivision is proposed for on- and off-site private and public infrastructure and utility construction in a single phase. DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 4 of 44 Prior to issuance of a building permit for an individual lot, completion of required on- and off- site infrastructure and utilities for the subdivision is required, as is payment of impact fees and sketch plan review of proposed structures on the lot. Neighborhood centers are required for subdivisions of 10-acres or more per 38.410.020. This subdivision is 7-acres and, therefore, exempt from this requirement. However, the County Regional Park abuts the subdivision along its western frontage. The subdivision’s 44 homes would require 1.31-acres of parkland per BMC 38.420.020.A. The Applicant proposes to meet this requirement by providing both cash-in-lieu (CIL) and parkland-related improvements-in lieu of parkland within the subdivision, due to the proximity of the Site to the 97-acre Regional Park. One of the improvements would be the installation of a 10-foot wide, paved, shared use path along the subdivision’s eastern frontage within the Vaquero Parkway right-of-way (ROW). The Recreation and Parks Department continues to work with the Applicant to enable him to satisfy this requirement; please see Condition of Approval No. 2. The Community Development Board, acting as the Planning Board, held a public hearing on the application on December 20, 2021. The Planning Board is the advisory body to the City Commission on this subdivision application. The Board, by a vote of 6 to 1, recommended approval of the project with the conditions and code provisions outlined in this staff report. One public comment expressing concern about increased traffic and parking congestion on Vaquero Parkway was received during the Board public comment period. The Community Development Board/Planning Board proceedings may be viewed here under the date December 20, 2021: https://www.bozeman.net/services/city-tv-and-streaming-audio Pursuant to BMC 38.240.130A.5.a.(4), Preliminary Plat, the final decision for a Major Subdivision Preliminary Plat with less than 50 lots must be made within 60 working days of the date it was deemed adequate. The Development Review Committee (DRC) deemed the application adequate for continued review on November 19, 2021. The City Commission was required to approve, conditionally approve or deny the subdivision application by January 19, 2022, unless there is a written extension from the developer, not to exceed one year. The City Commission hearing to consider this preliminary plat was scheduled for January11, 2022. The Applicant provided a written request to postpone the hearing until the January 25, 2022 City Commission hearing. This was granted by the City Commission on January 11, 2022 and the application was re-scheduled for their January 25, 2022 hearing. The January 25, 2022 hearing was held in the City Commission chambers, 121 N Rouse Avenue at 6 pm as well as on Webex. No member of the public spoke at the hearing. After the City Commission reviewed and considered the application materials, staff report, advisory review board recommendations, previous public comment, and all the information presented, they made individual findings and voted 3 to 0 to approve the motion to approve DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 5 of 44 the application. The Commission agreed that the application met the criteria established by the Bozeman Municipal Code. Therefore, the application was approved with conditions and applicable code provisions outlined in these findings. The City Commission’s review, deliberation and findings for this preliminary plat application may be found under the linked minutes and recorded video of the meetings located at this web page filed under the date January 25, 2022: https://www.bozeman.net/services/city-tv-and-streaming-audio Alternatives 1. Approval of the Findings of Fact and Order as drafted; 2. Approval of the Findings of Fact and Order with modifications; or 3. As determined by the City Commission. DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 6 of 44 TABLE OF CONTENTS EXECUTIVE SUMMARY ....................................................................................................................................... 2 Unresolved Issues .......................................................................................................................... 2 Project Summary ........................................................................................................................... 2 Alternatives .................................................................................................................................... 5 SECTION 1 - MAP SERIES................................................................................................................................... 7 SECTION 2 – REQUESTED VARIANCES ...................................................................................................... 10 SECTION 3 - RECOMMENDED CONDITIONS OF APPROVAL ............................................................. 10 SECTION 4 - CODE REQUIREMENTS REQUIRING PLAT CORRECTIONS ...................................... 12 SECTION 5 - RECOMMENDATIONS AND FUTURE ACTIONS ............................................................. 21 SECTION 6 - STAFF ANALYSIS AND FINDINGS ....................................................................................... 21 SECTION 7 - FINDINGS OF FACT, ORDER AND APPEAL PROCEDURES…………… .37 APPENDIX A – PROJECT SITE ZONING AND GROWTH POLICY ..................................... 39 APPENDIX B – NOTICING AND PUBLIC COMMENT .......................................................... 42 APPENDIX C – OWNER INFORMATION AND REVIEWING STAFF .................................. 42 ATTACHMENTS ......................................................................................................................... 43 DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 7 of 44 SECTION 1 - MAP SERIES Figure 1. Zoning classification: R-3, Medium-density Residential District Site shown in white circle Figure 2. Vicinity Map; subdivision Site noted in the white circle DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 8 of 44 Figure 3. Proposed Preliminary Plat (9/24/21 plat revision) DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 9 of 44 Figure 4: Graphic image of the proposed subdivision DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 10 of 44 SECTION 2 – REQUESTED VARIANCES There are no variances requested with this subdivision application. SECTION 3 - RECOMMENDED CONDITIONS OF APPROVAL The following conditions of approval and code provisions satisfy City and relevant State requirements as well as site-specific mitigation for potential adverse impacts associated with development of the proposed subdivision. The conditions of approval are in addition to the required code provisions identified in this report. The conditions are specific to the preliminary plat application. The City Commission considered the impacts as identified in the staff analysis and application materials and finds that the conditions of approval are deemed reasonably-related and roughly-proportionate to the development of this subdivision. 1. BMC 38.400.110. Transportation Pathways. Concurrent with the Applicant’s construction of the west side of Vaquero Parkway along the subdivision’s frontage, the Applicant shall install a paved ten-foot wide “shared-use path” along the east side of the subdivision within the Vaquero Parkway right-of-way (ROW). The shared-use path shall meet City standards. The Applicant is advised that the City of Bozeman will accept responsibility for the maintenance of this shared-use path within the Vaquero Parkway ROW once the path has been installed, inspected and accepted by the City. Details of this shared-use path shall be submitted with the final plat application. 2. BMC 38.420.020 and 080, Parkland Mitigation. a. Park improvements or parkland improvements-in-lieu required by 38.420.020 and 080 and the Bozeman Parks, Recreation, Open Space and Trails (PROST) Plan must be approved by the Park and Recreation Department (PARKS) prior to final plat approval or an improvements agreement for such shall be executed. Applicants may not financially guarantee the requirements per 38.420.080.A.1 and 2. b. The shared-use path along the Vaquero Parkway west side ROW may extend further north and south of the subdivision frontage as part of the Applicant’s parkland cash-in-lieu and parkland improvements-in-lieu negotiated with PARKS, pursuant to BMC 38.420.020. Final details of the Applicant’s parkland cash-in-lieu and parkland improvements-in-lieu commitments must be provided with the final plat application submittal. c. Documentation of compliance with the parkland dedication requirements of Section 38.420 must be provided with the final plat. A table showing the parkland requirements for the subdivision and the method of meeting the parkland dedication must be included on the final plat Conditions of Approval sheet. The table shall explicitly state (1) the parkland requirements of the subdivision; (2) the methods for satisfying this requirement ( e.g. cash- in-lieu (CIL) or improvements-in-lieu); (3) how much parkland credit was allocated for each lot within each phase; (4) all areas within the subdivision qualifying for exemption from parkland requirements (i.e., detention/retention areas, watercourse setbacks, wetlands, common open space, parking facilities); and (5) the total area of each above category. The table and its contents must be approved by PARKS. DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 11 of 44 d. Where CIL has been accepted in-lieu of parkland, the amount of the cash donation must be paid prior to final plat approval and must be stated on the final plat sheet. 3. 38.400.080.B. Sidewalks adjacent to public lands. The sidewalk along the west side of Stokes Lane shall be built to City standards as part of the subdivision public improvements. The applicable City standard sidewalk on the west side of Stokes Lane must be shown on the plat sheets at final plat application submittal and must be shown on infrastructure plans prior to infrastructure approval. 4. BMC 38.240.130.A.5.e (1) (a), Compliance with survey requirements. The proposed perimeter lines of the subdivision do not match the most recent plat for the subdivision (Minor Subdivision No. 400, Lot 4). However, a recent Subdivision Exemption Application, No. 20312, proposes a land swap to adjust these lot lines. That lot line adjustment consists of relocating the common boundary between the two lots allowing the County to have more area at the northern access point from Baxter Lane, and Lot 4 (this subdivision land area) to have a more aligned tie-in/approach with the newly constructed intersection of Vaquero Parkway & Tschache Lane. That revised plat, per Application 20312, must be recorded prior to final plat approval. A digital copy of the recorded plat must accompany the final plat submittal. 5. Public Infrastructure Payback Obligations. Prior to final plat approval, the Applicant shall pay the appropriate “pay back” cost for the N. 19th and Baxter Intersection Payback District traffic signal improvements. The subject property lies within this District and the owner did not participate in the original cost of construction of improvements and, therefore, the current owner will be assessed a payback charge which must be paid prior to final plat approval. The Applicant must contact the City Engineering Department (kajohnson@bozeman.net) for a determination of the payback amount. 6. City of Bozeman Resolution 5076, Policy 1 - The Applicant must provide and file with the County Clerk and Recorder's office executed Waivers of Right to Protest Creation of Special Improvement Districts (SID’s) on City standard form for the following: a. Street improvements to N Ferguson Avenue between W Oak Street and Kimberwicke Street including lighting, signalization, paving, curb/gutter, sidewalk, and storm drainage. b. Street improvements to Davis Lane between Baxter Lane and Kimberwicke Street including lighting, signalization, paving, curb/gutter, sidewalk, and storm drainage. c. Intersection improvements at Vaquero Parkway and Baxter Lane including lighting, signalization/channelization, paving, curb/gutter, sidewalk, and storm drainage. d. Intersection improvements at Caspian Avenue and Baxter Lane including lighting, signalization/channelization, paving, curb/gutter, sidewalk, and storm drainage. e. Intersection improvements at Tschache Lane and Davis Lane including lighting, signalization/channelization, paving, curb/gutter, sidewalk, and storm drainage. DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 12 of 44 f. Intersection improvements at Flanders Mill Road and Baxter Lane including lighting, signalization/channelization, paving, curb/gutter, sidewalk, and storm drainage. The document filed must specify that in the event an SID is not utilized for the completion of these improvements, the developer agrees to participate in an alternate financing method for the completion of said improvements on a fair share, proportionate basis as determined by square footage of property, taxable valuation of the property, traffic contribution from the development, or a combination thereof. The Applicant must provide a copy of the recorded SID waiver prior to final plat approval. SECTION 4 - CODE REQUIREMENTS REQUIRING PLAT CORRECTIONS The following are procedural requirements not yet demonstrated by the plat and must be satisfied at the final plat. 1. BMC 38.100.080.A. Compliance with regulations required. The Applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or State law. 2. BMC 38.220.040.A.3. Easements. All easements, existing and proposed, must be accurately described, dimensioned and shown on each subdivision block of the final plat in their true and correct location on the final plat application. Public utilities must be located within dedicated street right of ways. Utility easements must be provided and granted with the final plat in accordance with public and private design standards. 3. BMC 38.220.070. Final Plat notations. Among others, the final plat must contain the following notation on the Conditions of Approval sheet: a. All public stormwater facilities not on property dedicated to the City of Bozeman shall be located within public stormwater drainage easements that provide for storm water facility maintenance responsibility by the Home Owners’ Association (HOA) and which is so noted in the HOA Conditions, Covenants and Restrictions (CC&R) document. b. Due to known high groundwater conditions in the area, no basements will be permitted with future development of the site. No crawl spaces will be permitted with future development of the site unless a professional engineer registered in the State of Montana certifies that the lowest point of any proposed structure is located above the seasonal high groundwater level and provides supporting groundwater data to the City Engineering Department prior to the release of any building permit for the development. In addition, sump pumps are not allowed to be connected to the sanitary sewer system or the drainage system unless capacity is designed into the drainage system to accept the pumped water. Water from sump pumps may not be discharged on streets, such as into the curb and gutters, where they may create a safety hazard for pedestrians and vehicles. DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 13 of 44 c. In order to disclose to future purchasers their obligations regarding open space established in the Municipal Code, the following language shall be included on the Conditions of Approval Sheet of the final plat: “Ownership of Common Open Space, trails and the common area stormwater management facility, and responsibility for maintenance thereof and for maintenance of the alley or other City assessments levied on these common lands shall be that of the Home Owners’ Association (HOA). Maintenance responsibility shall include, in addition to the common open space, trails and the private alley, snow removal for those assets and irrigation of all vegetative ground cover, boulevard trees and maintenance of irrigation systems in the public right-of-way boulevard strips along all external perimeter development streets and as adjacent to public parks or other common open space areas. All areas within the subdivision that are designated herein as common areas, exclusive of the Lot CA-1 stormwater drainage facility, are for the use and enjoyment by residents of the development and the general public. The common area Lot CA-1 shall be used by this subdivision for stormwater management and shall be owned and maintained by the HOA. The HOA shall be responsible for levying annual assessments to provide for the maintenance, repair, and upkeep of all common areas inclusive of open space lots, trails, Lot CA-1 and the private alley. At the same time of recording the final plat of the subdivision the subdivider shall transfer ownership of all common areas to the HOA created by the subdivider to maintain all common areas within the Park View Crossing Major Subdivision.” d. Approval by any design review entity established in the HOA CC&Rs does not bind the City of Bozeman to approve any construction plan. e. All open space, trails and public access areas shall be owned and maintained by the Home Owners’ Association (HOA). f. Lots 3D, 4A, 7D and 8A within Block 2 of the Park View Crossing Major Subdivision are subject to a ten-foot building setback from the side property lines abutting the Open Space Lots OS-1 and OS-2. It is the obligation of the lot owner to be fully informed as to this additional standard before beginning any home or site design process. g. The alley shall be a public right-of-way that is maintained by the HOA. h. No landscaping, such as trees or woody shrubs, beyond ground cover or fencing shall be installed within a utility or access easement, per BMC 38.410.060. 4. 38.220.050.8. Noxious Weed Control. Noxious weed management and revegetation plan. Noxious weeds must be controlled in all developments as directed by the County Weed Control District (District) in accordance with the Montana County Noxious Weed Control Act (MCA 7-22-21). Prior to final plat approval, the developer must have any noxious weeds identified and their location mapped by a person with experience in weed management and knowledgeable in weed identification. A noxious weed management and revegetation plan approved by the district for control of noxious weeds must be recorded with the County Clerk and Recorder prior to final plat approval. This plan must ensure the control of noxious weeds upon final plat approval and the revegetation of any land disturbed during the construction DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 14 of 44 of subdivision improvements. The subdivision’s HOA, via the CC&R document, shall insure that the plan is implemented and enforced in perpetuity. 5. BMC 38.220.060.A.10.a. Water rights. Water rights, or cash-in-lieu thereof, as calculated by the Director of Public Works, is due with the filing of each subdivision final plat. Prior to final plat approval, the Applicant must satisfy Section 38.410.130 and provide documentation of all water rights pertaining to the proposed subdivision; e.g. previous estimates or actual payment-in-lieu of water rights, certified well logs, decrees or adjudications, etc.. 6. BMC 38.600.120. Floodplain disclosure. The current plans are unclear as to whether the proposed stormwater facility will encroach into the mapped floodplain. If encroachment is proposed, the Applicant shall provide an analysis of the impacts of the provided fill with the formal infrastructure submittal. Per 38.600.120, the base flood elevation may not be increased by more than 0.50 ft. Any fill encroachment must be designed to prevent erosion from the 100-year event. This condition must be addressed in the final plat application submittal and approved by the City Engineer prior to final plat approval. 7. BMC 38.220.070. Final Plat. a. The Applicant shall submit with the application for final plat review and approval, a written narrative stating how each of the conditions of preliminary plat approval and noted code provisions herein have been satisfactorily addressed. This narrative shall be in sufficient detail to direct the reviewer to the appropriate plat, plan, sheet, note, covenant, etc. in the submittal. b. The final plat must conform to all requirements of the Bozeman Municipal Code (BMC) and the State of Montana Uniform Standards for Monumentation, Certificates of Survey, and Final Subdivision Plats (ARM 24.183.1101, 24.183.1104 and 27.183.1107) and shall be accompanied by all required documents, including certification from the City Engineer that record drawings for public improvements were received, including a platting certificate, and all required and corrected certificates. 8. BMC 38.220.070.A.7. Final Plat documents. Simultaneously with filing of the final plat, in conjunction with required or offered dedications, the subdivider (or owner of the property being subdivided if the owner is not the subdivider) shall transfer ownership to the Home Owners’ Association (HOA) of open space lots OS-1 and OS-2, the stormwater drainage common area Lot CA-1, and the stub-out trail connecting the open space Lots OS-1 and OS-2 across Stokes Lane to the County Regional Park property line to the west. These assets shall be conveyed to the HOA and all its right, title, and interest in any improvements made to such open space, trail or drainage lot. For the transfer of real property, the subdivider or owner of the property shall submit with the application for the final plat a warranty deed or other instrument acceptable to the City Attorney transferring fee simple ownership to the HOA and associated realty transfer certificate. The subdivider or owner of the property must record the deed or instrument at the time of recording of the final plat. For personal property installed upon open space owned by the HOA, the subdivider shall provide an instrument acceptable to the City Attorney transferring all its rights, title and interest in such improvements including all applicable warranties to such improvements. DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 15 of 44 9. BMC 38.220.070. Final Plat. The final plat application shall include three (3) signed reproducible copies on a 3 mil or heavier stable base polyester film (or equivalent). The Gallatin County Clerk & Recorder’s office has elected to continue the existing medium requirements of two (2) Mylars with a 1½” binding margin on one side for both plats and COS’s. The Clerk and Recorder will file the new Conditions of Approval sheet as the last same sized Mylar sheet in the plat set. 10. BMC 38.220.300 & 310. The Home Owners’ Association (HOA) documents must be finalized and recorded with the final plat. The HOA documents must include the requirements of Section 38.220.300 and 320. 11. BMC 38.220.320. Covenants. a. A Draft Conditions, Covenants & Restrictions (CC&Rs) document must be submitted with initial final plat submittal to be reviewed and approved by the City and, when approved, recorded with the County Clerk and Recorder. b. In order to disclose to future purchasers their obligations regarding open space established in the Municipal Code, the following language shall be included in the CC&R document: “Ownership of Common Open Space, trails and the common area stormwater management facility, and responsibility for maintenance thereof and for maintenance of the alley or other City assessments levied on these common lands shall be that of the Home Owners’ Association (HOA). Maintenance responsibility shall include, in addition to the common open space, trails and the private alley, snow removal for those assets and irrigation of all vegetative ground cover, boulevard trees and maintenance of irrigation systems in the public right-of-way boulevard strips along all external perimeter development streets and as adjacent to public parks or other common open space areas. All areas within the subdivision that are designated herein as common areas, exclusive of the Lot CA-1 stormwater drainage facility, are for the use and enjoyment by residents of the development and the general public. The common area Lot CA-1 shall be used by this subdivision for stormwater management and shall be owned and maintained by the HOA. The HOA shall be responsible for levying annual assessments to provide for the maintenance, repair, and upkeep of all common areas inclusive of open space lots, trails, Lot CA-1 and the private alley. At the same time of recording the final plat of the subdivision the subdivider shall transfer ownership of all common areas to the HOA created by the subdivider to maintain all common areas within the Park View Crossing Major Subdivision.” 12. BMC 38.220.320. Covenants. A notice prepared by the City shall be recorded concurrently with the final plat so that it will appear on title reports. This note shall read substantially as follows: “Lots 3D, 4A, 7D and 8A within Block 2 of the Park View Crossing Major Subdivision are subject to a ten-foot building setback from the side property lines abutting the Open Space Lots OS-1 and OS-2. It is the obligation of the lot owner to be fully informed as to this additional standard before beginning any home or site design process. Approval by any design review entity established in the HOA CC&Rs does not bind the City of Bozeman to approve any construction plan.” DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 16 of 44 13. BMC 38.220.320. Covenants. Conditions, Covenants, Restrictions (CC&Rs), and articles of incorporation for the creation of a home owners’ association and the CC&R document shall be submitted with the final plat application for review and approval by the Department of Community Development and shall contain, but not be limited to the following items: (1) the orientation and setbacks for corner lots, (2) all additional setbacks required when lots are adjacent to pathway corridors, such as Lots OS-1 and OS-2, (3) provisions for fences, (4) provisions for snow removal, maintenance and upkeep of the alley ROW, all common areas, public trails and storm water runoff facilities, (5) guidelines that outline architectural and landscape requirements for each individual lot and/or phase of the subdivision related to placement of landscaping and boulevard trees within the ROW at a regular spacing for each residential lot, (6) provisions that outline the renewal of an annual contract with a certified landscape nursery person for the upkeep and maintenance of all common open space, trails, etc., (7) landscape details for detention ponds, outlet structures, boulevard trees, parkland, irrigation, etc., (8) mitigation of groundwater with established floor elevations, (9) noxious weed control, and (10) assessment of existing and future Special Improvement Districts, if applicable. These documents shall be submitted to the City Attorney and shall not be accepted by the City until approved as to legal form and effect. A draft of these documents must be submitted for review and approval by the Community Development Department at least 30 working days prior to submitting a final plat application. These documents shall be executed and submitted with the final plat to be recorded with the Gallatin County Clerk and Recorder at the time of final plat recordation. 14. BMC 38.240.150.A.3. Review of Covenants. Deeds and Realty transfer certificates must be provided for transfer of any platted public travelway or tract to the City or other entity in association with filing of the final plat. It is noted that the alley that bisects the subdivision shall be a public right-of-way (ROW) that would be maintained by the HOA. 15. BMC 38.240.150.A.3.d. Transfer of ownership of public land, off-site land, private land, personal property, improvements and water rights; documents required. a. For the transfer of real property in satisfaction of required or offered dedications to the City, and required or offered donations or grants to the home owners' association (HOA), the subdivider or owner of the property must submit with the application for final plat a warranty deed or other instrument acceptable to the City Attorney transferring fee simple ownership to the City or the HOA. b. For the transfer of personal property installed upon City-owned rights-of-way (ROW) or HOA-owned parkland improvements or open space, the subdivider must provide the City with an instrument acceptable to the City Attorney transferring all its rights, title and interest in such improvements, including all applicable warranties to such improvements, to the City or the HOA. c. The subdivider or owner of the property must record the deed or instrument transferring ownership or interests at the time of recording of the final plat with the original of such deed or instrument returned to the City or HOA as applicable. DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 17 of 44 d. For the transfer of ownership interest in water, the subdivider or owner of the property must submit with the application for final plat a deed or other instrument acceptable to the City Attorney transferring ownership to the City or HOA, along with all required State Department of Natural Resources and Conservation documentation, certification and authorization. 16. BMC 38.240.410. Dedication of Lands to the City of Bozeman. Stokes Lane and the extension of Tschache Lane within the subdivision shall be dedicated to the City of Bozeman. The north-south alleyway between Vaquero Parkway and Stokes Lane shall be a privately- maintained alley located within a public right-of-way (ROW) dedicated to the City. Prior to final plat approval, the certificate of dedication on the final plat shall include the specific names of the streets dedicated to the public for which the City accepts responsibility and shall reflect all such dedications and applicable private maintenance agreements. 17. BMC 38.240.420. Mortgagee. If there are liens or mortgages against the property, the appropriate Mortgagee certificate must be included. 18. BMC 38.240.430 and BMC 38.420.030.D. Cash donation in-lieu of parkland. Where a cash donation or combination of cash and improvement donation has been accepted in-lieu of on-site parkland by the City, the amount of the cash donation must be stated on the final plat. Where there will be a cash donation in-lieu of parkland dedication, plats of subdivision must show the following certificate: “Certificate accepting cash donation in-lieu of land dedication Finding dedication of parkland within the platted area of the Park View Crossing Subdivision would be undesirable for park and playground purposes, it is hereby ordered by the City Commission of the City of Bozeman, that land dedication for park purposes be waived and that cash-in-lieu, in the amount of _______________ dollars, and improvements-in-lieu with an estimated value of $___________ , be accepted in accordance with the provisions of the Montana, Subdivision and Platting Act (MCA 76-3-101 through 76-3-625) and the Bozeman Municipal Code. DATED this _______ day of _______, 20____. _______________________ Signature City of Bozeman Director of Parks and Recreation” 19. BMC 38.240.450 Improvements. This code requires a certificate of completion of improvements. The certificate must specifically list all installed improvements and financially guaranteed improvements. 20. BMC 38.240.450 and 38.240.520. Certificate of Completion of Improvements. The Applicant is advised where non-public and/or public improvements are to be installed prior to final plat approval, the final plat of the subdivision must contain a Certificate of Completion for these improvements. Prior to final plat approval, Sheet One certificates must list all completed and accepted improvements, as applicable. DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 18 of 44 21. BMC 38.240.510. Conditions of approval notifications and certifications. Separate the Conditions of Approval Notifications and Certifications Certificate from the non-public improvements certificate and match the language in this section of the BMC. 22. BMC 38.240.520 Certificate of completion of non-public Improvements. This code requires a certificate of completion of non-public improvements. Certificate must specifically list all installed improvements and financially guaranteed improvements. 23. BMC 38.240.530. Completion of water-related improvements. When irrigation of public facilities are to be installed prior to final plat approval, the final plat of subdivision must contain a certificate of completion of water-related improvements. The certificate must list all completed and accepted improvements, including but not limited to all irrigation system record drawings. This certificate must be provided on the final plat. 24. BMC 38.270.030. Completion of improvements. If it is the developer’s intent to file the plat prior to the completion of all required improvements, an Improvements Agreement shall be entered into with the City of Bozeman guaranteeing the completion of all improvements in accordance with the preliminary plat submittal information and conditions of approval. If the final plat is to be filed prior to the installation of all improvements, the developer shall supply the City of Bozeman with an acceptable method of security equal to 150 percent of the cost of the remaining improvements. 25. BMC 38.270.030. Completion of improvements. The Applicant must submit plans and specifications for water and sewer main extensions, streets, and storm water improvements, prepared and signed by a professional engineer (PE) registered in the State of Montana, which must be provided to and approved by the City Engineer. Water and sewer plans must also be approved by the Montana Department of Environmental Quality. The Applicant must also provide professional engineering services for construction inspection, post-construction certification, and preparation of Mylar record drawings. Construction shall not be initiated on the public infrastructure improvements until the plans and specifications have been approved and a preconstruction conference has been conducted. Building permits will not be issued prior to City acceptance of the site infrastructure improvements unless all provisions set forth in Section 38.270.030.C of the Bozeman Municipal Code are met to allow for concurrent construction. 26. BMC 38.270.030.B.3. Completion of Improvements, Lighting. Subdivision lighting must be installed or financially guaranteed prior to final plat approval. If a Subdivision Lighting Improvement District (SLID) is utilized for the lighting the Subdivision, the SLID information shall be submitted to the Clerk of Commission after Preliminary Plat approval in hard copy and digital form. The final plat application will not be deemed complete until the resolution to create the SLID has been approved by the City Commission. 27. BMC 38.270.090. Waiver of Park Maintenance District. Executed waivers of right to protest the creation of special improvement districts (SIDs) for a park maintenance district DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 19 of 44 will be required to be filed and of record with the Gallatin County Clerk and Recorder, unless already filed with annexation or prior development. 28. BMC 38.400.110.B.1, Transportation pathways. Developers must install transportation pathways, to provide adequate multimodal transportation facilities within the development as part of the required development improvements. Transportation pathways must meet Americans with Disabilities Act (ADA) accessibility standards and include the following types of facilities: a. Sidewalks (also see 38.400.080.B and 38.510 for sidewalk standards, depending on the applicable block frontage designation); b. On-street bike lanes and bike routes; c. Boulevard trails; and d. Class I trails. 29. BMC 38.410.040. Blocks. a. This subdivision includes a mid-block pedestrian crossing in-lieu of a street in order to meet the Block length and width standards of 38.410.040.B and C. This mid-block crossing is represented by the open space Lots OS-1 and OS-2. These lots must be delineated at their corner pins in accordance with 38.410.040 to distinguish them from the abutting private lots. b. With the final plat submittal, the Applicant shall provide design sections for the mid-block pedestrian crossing Lots OS-1 and OS-2 as well as for the stub-out trail along that alignment on the west side of Stokes Lane. These lots require 1 tree for every 50 feet per 38.550.050.D. 30. BMC 38.410.060.A. Easements. The final plat must provide all necessary utility and public access easements and they must be described, dimensioned and shown on each subdivision block of the final plat in their true and correct location. All written easements indicated below must be provided on City standard easements templates. Drafts must be prepared for review and approval by the City with the final plat submittal. Signed hard copies of the easements must be submitted to the City Engineering Department. Recorded easement numbers must be provided on the final plat prior to final plat approval. The Applicant may contact the review engineer to receive the standard templates. a. The Applicant must provide a ten foot wide utility easement (power, gas, communication, etc.) along the development’s property frontage in accordance with the Bozeman Municipal Code (BMC). The required 10-foot front yard utility easement required along the lots on Vaquero Parkway, Stokes Lane and Tschache Lane must be recorded prior to final plat approval. b. The Applicant must provide a stormwater drainage easement over the proposed storm water facility on Lot CA-1; DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 20 of 44 c. Prior to final plat approval, the Applicant shall record an irrevocable public access easement on the two open space Lots OS-1 and OS-2A as well as the short stub-out connection of this trail to the County Regional Park located on the west side of Stokes Lane; and d. The Applicant is advised that all dedicated public easements must be recorded the City’s standard template easement documents separate from the plat and the recorded document number must be listed on the final plat. Easements will be deemed inadequate if they are not in a final draft format (signatures are not required for the draft review). Easements must be stamped by a licensed professional surveyor. In preparing signature blocks on any upcoming documents, please use the following names: Jeff Mihelich, City Manager; Mike Maas, City Clerk; Cynthia L. Andrus, Mayor. If a new member is established, the easement documents must be updated. 31. BMC 38.410.120. Mail delivery. If mail delivery will not be to each individual lot within the development, the developer shall provide an off-street area for a vehicle to pull out of the vehicle or pedestrian travelway to access cluster mailboxes, in cooperation with the USPS. It shall not be the responsibility of the City to maintain or plow any mail delivery area constructed within a City right-of-way (ROW). If cluster boxes are used a dedicated area for a vehicle to pull up and access the boxes outside of the ROW must be shown and labeled on the final plat map. 32. BMC 38.410.130. Water rights. Compliance with BMC 38.410.130, Water Rights, shall be met prior to final plat approval. The Applicant shall provide documentation of all water rights appurtenant to the proposed subdivision; e.g. previous estimates or actual payment - in-lieu of water rights, certified well logs, decrees or adjudications, etc. The Applicant must contact Griffin Nielsen with the City of Bozeman Engineering Department for any cash-in-lieu of water rights determination. 33. BMC 38.410.080.H. Landscape amenities. Stormwater retention/detention facilities in landscaped areas shall be designed as landscape amenities. They shall be an organic feature with a natural, curvilinear shape. The facilities shall have 75 percent of surface area covered with live vegetation appropriate for the depth and design of the retention/detention facility, and be lined with native grasses, indigenous plants, wet root tolerant plant types and groupings of boulders to create a functional yet, natural site feature. 34. BMC 38.550.070. Landscaping of public lands. In accordance with the requirements of this section, installation by the developer of vegetative ground cover, boulevard trees, and irrigation system in the public right-of-way boulevard strips on perimeter streets and in and adjacent to City park lots and any open space lots is required prior to final plat approval or must be financially guaranteed. 35. BMC 38.570.030. Street Lights. The Applicant shall construct street lights per the DSSP and setup a special improvement lighting district (SILD) for maintenance of the lights with the City Finance Department prior to final plat approval. DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 21 of 44 SECTION 5 - RECOMMENDATIONS AND FUTURE ACTIONS On November 19, 2021, the Development Review Committee (DRC) determined that the application materials were adequate for continued review and found that application conforms to standards and is sufficient for approval with conditions and code provisions. The Recreation and Parks Department continues to work with the Applicant to enable him to prepare a final parkland plan for this subdivision as described in Condition of Approval No. 2. The Community Development Board, acting as the Planning Board, held a public hearing on the application on December 20, 2021. The Planning Board is the advisory body to the City Commission on this subdivision application. The Board, by a vote of 6 to 1, recommended approval of the project with the conditions and code provisions outlined in this staff report. The public hearing date for the City Commission consideration of this preliminary plat was held on January 25, 2022 in the City Commission Chamber, 121 N Rouse Avenue at 6 PM and was also held on Webex. After the City Commission reviewed and considered the application materials, staff report, advisory review board recommendations, public comment, and all the information presented, they made individual findings and voted 3 to 0 to approve the motion to approve the application (Mayor Andrus and Commissioner Coburn were absent). The Commission agreed that the application met the criteria established by the Bozeman Municipal Code. Therefore, the application was approved with conditions and applicable code provisions outlined in these findings. The City Commission’s review, deliberation and findings may be found under the linked minutes and recorded video of the meetings located at this web page filed under the date January 25, 2022: https://www.bozeman.net/services/city-tv-and-streaming-audio SECTION 6 - STAFF ANALYSIS AND FINDINGS Analysis and resulting recommendations are based on the entirety of the application materials, State and Municipal codes, standards, and plans, public comment, and all other materials available during the review period. Collectively, this information is the record of the review. The following analysis is a summary of the completed review. DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 22 of 44 Applicable Subdivision Review Criteria for City Advisory Board and City Commission Action on a Preliminary Plat per Bozeman Municipal Code (BMC) Sections 38.240.150.A.2. In considering applications for preliminary plat subdivision approval under this title, the City Commission shall consider the following review criteria. 1. BMC 38.240.150.A.2 and Montana Codes Annotated (MCA) Section 76-3-615, Public comments or documents presented at or prior to the City Commission’s consideration of a plat constitutes new information. Staff Evaluation: No new information has been presented to the City Commission prior to their January 25, 2022 decision. At that hearing, the staff report, staff presentation, and Applicant representative presentation was entered into the record. In the staff report, public comment received to date was described as follows: 2. BMC 38.240.150.B. The basis for the City Commission's decision to approve, conditionally approve or deny the subdivision must be whether the subdivision application, public hearing if required, planning advisory boards and agencies advice and recommendation and additional information demonstrates that development of the subdivision complies with the Bozeman Municipal Code (BMC), the City's growth policy as described in the Bozeman Community Plan, the Montana Subdivision and Platting Act and other adopted state and local ordinances, including, but not limited to, applicable zoning requirements. Staff Evaluation: The Preliminary Plat meets these criteria as noted below on pages 24 to 36. 3. BMC 38.240.050.B.2. Consider written comments from appropriate public agencies, utilities or other members of the public. Staff Evaluation: a. The Development Review Committee (DRC) reviewed this application and deemed it adequate for further review and public notice on November 19, 2021. b. The Community Development Board, acting as the Planning Board, reviewed this application on December 20, 2021 and, by a vote of 6 to 1, recommended approval of the preliminary plat with staff-recommended conditions and code provisions. The Board’s recommendation did not include support of the Applicant’s sidewalk variance request. Subsequent to the Board’s recommendation, on December 23, 2021, the Applicant withdrew in writing his sidewalk variance request. It is noted that Condition of Approval No. 3 for this Preliminary Plat requires a code-complying sidewalk along the west side of the new Stokes Lane. c. Public Comment. DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 23 of 44 (1) During the December 20, 2021 Community Development Board meeting, a neighbor of the proposed subdivision called in to comment on the application and described his concern with increased traffic and parking congestion along Vaquero Parkway due to the proposed development. (2) A December 21, 2021 Bozeman Daily Chronicle newspaper article about the December 20, 2021 Community Development Board meeting alerted a neighbor of the proposed subdivision and this neighbor called the Community Development Department to express her concern with potential loss of habitat for a local flock of Partridge birds who frequent the Site and neighboring park. The application material for this project noted that there are not Species of Concern located on or near the Site. Staff reviewed the Montana Natural Heritage Program website listing of Species of Concern and found that Partridge birds are not a Species of Concern and, therefore, the loss of 7-acres of habitat does not need to be mitigated. Furthermore, several site visits by staff after the neighbor’s alerting to the presence of these birds, did not reveal the birds on the Site. It is noted that these visits took place in winter and the snow on the ground made it easy to see a brownish bird. Only Macaw birds have been observed on the Site. 4. BMC 38.240.150.B.3. The City Commission shall consider the following: (a.) Relevant evidence relating to the public health, safety and welfare; (b.) Other regulations, code provisions or policies in effect in the area of the proposed subdivision; (c.) The recommendation of the advisory bodies; (d.) Any relevant public comment; and (e.) Individual phases, existing conditions, and changed circumstances for any phase reviewed under 76-3-617 MCA. Staff Evaluation: (a) Please see code evaluations noted on pages 22 through 36. (b) Please see code evaluations noted on pages 22 through 36. (c) Please see the recommendations noted on pages 1 and 2; (d) Please see the public comments noted above; (e) The subdivision infrastructure and utilities would be built in a single phase. 4. BMC 38.240.170, Certification that water and waste services are to be provided. Staff Evaluation: Per the Engineering Report for this subdivision, water and wastewater improvements would be designed to meet City standards and, with the recommended conditions of approval and code provisions, this subdivision would not significantly burden City water or sanitary sewer infrastructure. 5. BMC 38.240.150.B, Features, including well isolation zones, do not encroach onto private property. Staff Evaluation: Please see the Surface Water discussion below. DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 24 of 44 38.240.150. D, Finding of Fact. Federal or state governmental entity input. If a federal, BMC or state governmental entity submits a written or oral comment or an opinion regarding wildlife, wildlife habitat, or the natural environment relating to a subdivision application for the purpose of assisting a governing body's review, the comment or opinion may be included in the governing body's written statement under this section only if the comment or opinion provides scientific information or a published study that supports the comment or opinion. A governmental entity that is or has been involved in an effort to acquire or assist others in acquiring an interest in the real property identified in the subdivision application must disclose that the entity has been involved in that effort prior to submitting a comment, an opinion, or information as provided in this subsection. Staff Evaluation: No such comment was received for this application. BMC 38.220.060, Documentation of Compliance with State and Local Adopted Standards. BMC 38.220.060 A. Staff offers the following summary comments on the information required with BMC 38.220.060. 38.220.060. A.1. Surface Water. A small section of the Spring Ditch is located near the northern property boundary and encroaches into the northern portion of the subdivision’s stormwater easement. The original source of the Spring Ditch was believed to be from a natural spring located south of what is now the County Regional Park. Currently the water is collected underground (reportedly via a French drain system under Oak Street) and discharged to a pipe located in the bottom of the man-made Spring Ditch channel. The channel then flows north and crosses Baxter Lane. An existing irrigation easement (Doc. #2081799) is also located within the Regional Park. The existing wetlands located along Spring Ditch are shown on Sheets 1 and 2 of the Preliminary Plat as a wetlands boundary. The Spring Ditch or any associated wetlands would not be altered in any way with the construction of this development. 38.220.060. A.2 Floodplains. The portion of the Spring Ditch 100-year floodplain is located within the Common Area Lot 1 (Lot CA-1) for the stormwater detention pond within of this subdivision. Code Provision No. 6 would require the pond to be designed and built to assure that it would not erode during a 100-year flood event. 38.220.060. A.3. Groundwater. Groundwater is known to be high in this area. The Applicant provided GWIC monitoring wells to establish seasonal minimum and maximum groundwater depths. Code Provision No. 3b prohibits lot owners from building basements and crawl spaces due to high groundwater unless a certified engineer assures the City that no damage to structures would occur. DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 25 of 44 38.220.060. A.4. Geology, Soils and Slopes. Geology and soils will likely be similar to those encountered during the construction of Phases 4G & 4H of the Crossing 2 at Baxter Meadows subdivision to the east of the Site. There are no known geologic hazards associated with this property other than the regional designation of Seismic Zone 3. Conformance to relevant building codes can mitigate this degree of potential hazard. No unusual construction techniques are required due to geology, slopes, or soil types other than appropriate seismic design standards common throughout the Gallatin Valley. Significant slopes are not anticipated. The NRCS soils report was included with this preliminary plat submittal. Wetlands near Spring Ditch have been delineated and its lines are shown on the Preliminary Plat and would be shown on the final plat. 38.220.060. A.5. Vegetation. The property has been vacant for several years and has not been used agriculturally in the recent past. The property is adjacent to the Gallatin County Regional Park to the west, the Bozeman Fire Station No. 3 to the south, and residential development on all other sides. No known critical plant communities have been located on the property. After development, the majority of vegetation will be lawn, shrubs, and boulevard trees typical of residential subdivisions. Per Code Provision No. 4, an approved weed management plan must be provided with the final plat submittal and recorded prior to approval of the final plat and the subdivision CC&R document must clarify that the HOA is responsible for implementing and enforcing the weed management plan. 38.220.060. A.6. Wildlife. No animals listed under the “Animal Species of Special Concern”, (Montana Natural Heritage Program, Helena, 2003) have been observed or are known to occupy the property. Habitat most suitable for wildlife includes the area around the Spring Ditch that will not be developed. 38.220.060. A.7. Agriculture. Due to development in the area, no agricultural practices have been performed on the property for several years. 38.220.060. A.8 Agricultural Water User Facilities. The Spring Ditch agricultural facility will continue to flow and the existing irrigation easement located completely within the County Regional Park would not be abandoned or altered with this project. 38.220.060. A.9. Water and Sewer. Per the Engineering Report for this subdivision, water and wastewater improvements would be designed to meet City standards and, with the recommended conditions of approval and code provisions, this subdivision would not significantly burden City water or sanitary sewer infrastructure. 38.220.060. A.10. Stormwater Management. The subdivision would not significantly impact stormwater infrastructure. The stormwater systems would be designed to meet City standards and would be maintained by the Park View Crossing HOA [see Conditions of Approval No. 8 and 7 (k)]. 38.220.060. A.11. Streets, Roads and Alleys. The subdivision would not significantly impact the City’s street infrastructure. A single “loop” road called Stokes Lane would serve DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 26 of 44 the subdivision accessed from Vaquero Parkway and an extension of Tschache Lane into the subdivision from the intersection with Vaquero Parkway. The new Stokes Lane loop road would have the following characteristics: - 60-foot right-of-way - 33 feet from back of curb to back of curb - Standard City of Bozeman curb and applicable curb returns with the exception of a sidewalk along the western side of Stokes Lane which would be substituted by an existing shared-use path/trail within the County Regional Park along this same alignment. A new privately maintained alley ROW bisects the subdivision in a north/south orientation and would have the following characteristics: - 30-foot public access easement - 16-foot paved width - Inverse crown (without curb and gutter). This subdivision is not expected to adversely affect existing public land access. Access to the public lands of the County Regional Park and Dinosaur Park currently exist on Oak Street and at the Bozeman’s Firehouse No. 3. Furthermore, the Applicant would install a paved 10-foot wide shared-use pathway on the western side of Vaquero Parkway to provide trail/park connectivity for the community. This shared-use path would connect to and through the subdivision via Open Space Lots 1 and 2 and a short stub pathway on the west side of Stokes Lane to the 97-acre Gallatin County Regional Park property line. 38.220.060. A.12. Non-Municipal Utilities. This subdivision would not significantly impact non-municipal utilities. Standard 10-ft utility easements would be provided across all lots. All private utilities are available in the area to serve this subdivision. 38.220.060. A.13. Land Use. This subdivision is consistent with residential land uses allowed by the underlying R-3, Medium-density Residential zoning; specifically, the development of duplex, triplex and fourplex dwelling units are principal permitted uses within the R-3 district. The R-3 district requires a minimum density of 5 dwelling units per net -acre. The net -acreage of this 7-acre property excludes 2.93-acres of unbuildable lands of streets, open space lots and the stormwater common area lot. This 4.07 net-acre, 44- residential lot subdivision would more than double the minimum required density of 20 dwelling units. The townhome lots are allowed at 3,000 square feet (sf) per dwelling unit lot and the duplex lot is allowed at 2,500 sf per lot. The 4.07-net-acre, 44 dwelling unit subdivision provides 74 percent of the maximum density allowed in the R-3 zone for townhome dwelling units. The maximum density for this 4.07-acre subdivision would be 59 townhomes or 71 duplex dwelling units, depending on what type of residential structure is built. The proposed residential use would not adversely affect adjacent land uses in the area. Existing land uses bordering the east and north sides of the Park View Crossing property are residential, predominantly single-household detached dwelling units with some apartment buildings. The properties bordering the south and west are part of a Gallatin County Regional Park and are in public use, including a Fire Department Station and trail heads for the park. DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 27 of 44 The subdivision must provide a sidewalk and two open space lots which link Vaquero Parkway ROW to a new shared-use path/trail within the County Regional Park to the west. Two Open Space Lots, OS-1 and OS-2, serve as mid-block crossings for pedestrian and bicyclist and equate to 0.05-acres or 0.71% of the total area. One 0.29-acre lot serves as a Common Area Lot 1 stormwater drainage pond representing 4.14% of the land area. The streets equate to 2.59.64-acres or 37% of the total area. The residential lots total 4.07 net- acres and represent 58.14% of the 7-acre property. Access to the abutting County Regional Park would be enhanced by the development via sidewalks, the east-west mid-block open space lots extending pedestrian and bicycle access from Vaquero Parkway to the park property line. Both open space lots within the subdivision would be open to the public and easily accessible and would be landscaped and provided with trees and a minimum 5-foot wide sidewalk. No hazards or nuisances are expected to be created by the development. Safety issues related to construction activity would be effectively controlled by City standards for construction management practices. 38.220.060. A.14. Parks and Recreation Facilities. The Applicant seeks to satisfy Parkland requirements with a combination of cash-in-lieu and off-site trail corridor improvements. The Applicant requests to provide cash-in-lieu of parkland because there is a publicly-accessible 97-acre Gallatin County Regional Park abutting the subdivision to the west. The Applicant would provide a shared-use path along the subdivision’s eastern frontage, within the Vaquero Parkway ROW, as part of this parkland in-lieu requirement. The Applicant is continuing negotiations with the Parks Department to satisfy the parkland requirement of this subdivision. Per Condition of Approval No. 2, those agreements would be finalized prior to submittal of a final plat application. 38.220.060. A.15. Neighborhood Center Plan. Neighborhood centers are required for subdivisions of 10-acres or more per 38.410.020. This subdivision is 7-acres and, therefore, exempt from this requirement. However, the County Regional Park abuts the subdivision along its western frontage. 38.220.060. A.16. Lighting Plan. The preliminary street lighting plan is in accordance with the requirements of the BMC. Four street light fixtures are proposed with this development, each light spacing and design would meet City of Bozeman Design Standards and Specifications Policy. Per Code Provision No. 32, the Applicant is required to request the formation of a special improvement lighting district (SILD) for the district property owners, typically the HOA, to pay the costs of operation and maintenance of street light fixtures associated with this subdivision. 38.220.060. A.17. Miscellaneous. Not applicable. 38.220.060. A.18. Affordable Housing. The Applicant does not propose the inclusion of affordable housing meeting the provisions of BMC Section 38.380 and, due to the passage of DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 28 of 44 State law HB 259 by the 2021 State Legislature resulting in the provisions of MCA Section 76.3.514, the affordable housing provisions of 38.380.030 do not apply to this subdivision. Montana Code Annotated (MCA) 2021, Title 76. Land Resources and Use. 1. Compliance with the survey requirements of Part 4, Section 76-3-402 of the Montana Subdivision and Platting Act. a. The Preliminary Plat has been prepared in accordance with the survey requirements of the Montana Subdivision and Platting Act by a Professional Engineer registered in the State of Montana. A Subdivision Exemption lot line adjustment with the County Regional Park lands has been approved per Project No. 20312 but has not been recorded. This lot line adjustment is a result of a “land swap” with Gallatin County to adjust access to the northern portions of the park and the stormwater pond common area lot (CA-1) of this subdivision. Per Condition of Approval No.4, the approved Subdivision Exemption lot line adjustment plat map must be recorded with the Gallatin County Clerk and Recorder prior to approval of the final plat for this subdivision. Also outlined in Code Provision No. 1, the final plat must comply with State statute, Administrative Rules of Montana, and the Bozeman Municipal Code (BMC). A Condition of Approval sheet must be included with the final plat and updated with any additional required notations as required by these Preliminary Plat conditions or code provisions. 2. Compliance with the local subdivision regulations as provided for in Part 5 of the Montana Subdivision and Platting Act per BMC 38.240.130.A.5.e (1) Criteria, (b). The final plat must comply with the standards identified and referenced in the BMC. The Applicant is advised that unmet code provisions, or code provisions that are not specifically listed as a condition of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or State law. Sections 3 and 4 of this report identify conditions and code corrections necessary to meet all regulatory standards. Staff recommends Conditions of Approval No. 1 through 6 and Code requirements 1 through 35 to address necessary documentation and compliance with adopted standards. Therefore, upon satisfaction of all recommended conditions and applicable code corrections, the subdivision would comply with local subdivision regulations. 3. The provision of easements to and within the subdivision for the location and installation of any necessary utilities per BMC 38.410.060. Code Provision Numbers 2 and 30 require that all easements, existing and proposed, must be accurately depicted and addressed on the final plat and in the final plat application. Public utilities must be located within dedicated street right of ways. Utility easements need to be provided and granted with the final plat in accordance with public and private design standards. DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 29 of 44 4. The provision of legal and physical access to each parcel within the subdivision per BMC 38.240.130.A.5.e (1) Criteria, (d). Access to the property is from Vaquero Parkway which is a City-owned and maintained road. Tschache Lane is being extended into the subdivision from Vaquero Parkway and would be a City- owned and maintained road. The new loop road, Stokes Lane, would be dedicated to the City for ownership and maintenance. An alley ROW would bisect the subdivision in a north- south orientation and would be dedicated to the City although it is required to be privately- maintained by the subdivision HOA per Code Provisions 3c and 11b. 5. Compliance with the local subdivision review procedures provided for in Part 6 of the Montana Subdivision and Platting Act. The application was initially received on May 19, 2021 and was deemed inadequate for further review. Revised application materials were received on June 30, August 25, and November 19, 2021. The City deemed the application adequate for review on November 19, 2021. A public hearing was held by the Community Development Board on December 20, 2021 and the City Commission hearing was held on January 25, 2022 after the Applicant requested in writing a postponement from the originally-scheduled hearing for January 11, 2022. The hearings before the Community Development Board and City Commission have been properly noticed as required by the BMC. Based on the recommendation of the Development Review Committee (DRC) and other applicable review agencies, as well as any public testimony received on the matter, the Community Development Board, acting as the Planning Board per 38.240.130.A.3.b, must forward a written recommendation to the City Commission who will make the final decision on the Applicant’s request, per 38.240.130.A.5.c. The staff report for the January 25, 2022 City Commission hearing presented the Community Development Board’s written recommendation to the Commission on this application. That recommendation was for conditional-approval with the staff-recommended conditions and code provisions. The final decision for a Major Subdivision Preliminary Plat with less than 50 lots must be made within 60 working days of the date it was deemed adequate (November 19, 2021). Pursuant to BMC 38.240.130.A.5.a.4, the City Commission shall approve, conditionally approve or deny the subdivision application by January 19, 2021 unless there is a written extension from the developer, not to exceed one year. The Applicant requested a continuance of the City Commission’s consideration of this application to the January 25, 2021 meeting due to a previously unforeseen conflict with the Commission’s scheduling of cases on that date. Public notice for this application was given as described in Appendix B beginning on December 3, 2021 and ending on December 16, 2021. As of the date of this report, there were two public comments received; both after this public notice period. They are: (1.) During the public comment period of the December 20, 2021 Community Development Board meeting, a neighbor called in to express concern with (1) potential double-parking by park visitors along Vaquero Parkway; (2) concern with increased traffic congestion on DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 30 of 44 Vaquero Parkway due to the proposed development; and (3) objection to the sidewalk variance request due to lack of “undue hardship” to the Applicant who wants to avoid the cost of installing the concrete sidewalk. The Community Development Board proceedings may be viewed here under the date December 20, 2021: https://www.bozeman.net/services/city-tv-and-streaming-audio (2.) On December 22, 2021, another neighbor of the Site called our office to express concern that the increased number of residents of the subdivision would negatively affect a flock of partridge birds whose habitat includes the Site and the neighboring park. She asked if an environmental impact study had been conducted to identify the impact to these birds and their habitat. She stated that neighbors of the area delight in seeing the flock of partridges wander about the area. Staff explained that Montana subdivision law requires Applicants to provide information about wildlife and habitat that may be affected by the subdivision and this information was provided and can be found in the Community Development Board staff report which was sent to her. In response, staff researched the Montana Natural Heritage Species of Concern and Potential Species of Concern lists and the partridge species of birds is not listed therein [Please see 38.220.060.A.6, Wildlife subsection on page 26 of this report]. On December 27, 2021, the staff report for this Park View Crossing Major Subdivision Preliminary Plat application was completed and forwarded with a recommendation for consideration by the City Commission. Based on the recommendation of the DRC and other applicable review agencies, as well as any public testimony received on the matter, the Community Development Board forwarded their written recommendation via that staff report to the City Commission who made the final decision on the application on January 25, 2022. 8. Compliance with Chapter 38 of the Bozeman Municipal Code (BMC) and other relevant regulations. a. The final plat must comply with the standards identified and referenced in the BMC. The Applicant is advised in Code Provision No. 1 that unmet code provisions, or code provisions that are not specifically listed as a condition of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or State law. b. Sections 3 and 4 of this report identify staff-recommended conditions of approval and applicable code corrections necessary to meet all regulatory standards. It is expected that upon satisfaction of all 6 conditions of approval and 35 code provisions, the subdivision would comply with local subdivision regulations, meeting this criterion. DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 31 of 44 Primary Subdivision Review Criteria, Montana Code Annotated (MCA) Section 76-3-608. Criteria for local government review. (1) The basis for the governing body's decision to approve, conditionally approve, or deny a proposed subdivision is whether the subdivision application, preliminary plat, applicable environmental assessment, public hearing, planning board recommendations, or additional information demonstrates that development of the proposed subdivision meets the requirements of this chapter. A governing body may not deny approval of a proposed subdivision based solely on the subdivision's impacts on educational services or based solely on parcels within the subdivision having been designated as wildland-urban interface parcels under 76-13-145. Staff Comment: The proposed preliminary plat, when satisfying the 6 conditions of approval and 35 code provisions, would meet the requirements of MCA 76-3-608. It is expected that the nearby Meadowlark and Emily Dickinson Elementary Schools, the Chief Joseph Middle School and the Gallatin High School would serve students residing in the proposed subdivision with no adverse impacts to capacity. The Site is not designated a wildland-urban interface parcel. (2) The governing body shall issue written findings of fact that weigh the criteria in subsection (3), as applicable. Staff Comment: Section 7 of this report, found on pages 36 to 38, represent these Findings of Fact and Order. (3) A subdivision proposal must undergo review for the following primary criteria: (a) except when the governing body has established an exemption pursuant to subsection (6) or except as provided in 76-3-509, 76-3-609(2) or (4), or 76-3-616, the specific, documentable, and clearly defined impact on agriculture, agricultural water user facilities, local services, the natural environment, wildlife, wildlife habitat, and public health and safety, excluding any consideration of whether the proposed subdivision will result in a loss of agricultural soils; (b) compliance with: (i) the survey requirements provided for in part 4 of this chapter; (ii) the local subdivision regulations provided for in part 5 of this chapter; and (iii) the local subdivision review procedure provided for in this part; (c) the provision of easements within and to the proposed subdivision for the location and installation of any planned utilities; and (d) the provision of legal and physical access to each parcel within the proposed subdivision and the required notation of that access on the applicable plat and any instrument of transfer concerning the parcel. Staff Comment: Compliance with these elements and criteria are discussed on pages 25 through 28. DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 32 of 44 (4) The governing body may require the subdivider to design the proposed subdivision to reasonably minimize potentially significant adverse impacts identified through the review required under subsection (3) but may not require a set-aside of land or monetary contribution for the loss of agricultural soils. Pursuant to 76-3-620, the governing body shall issue written findings to justify the reasonable mitigation required under this subsection (4). Staff Comment: The subject property has lain fallow for several years and is no longer in agricultural use and, therefore, there are no adverse impacts to agricultural soils as a result of residential development of the Site. (5) (a) In reviewing a proposed subdivision under subsection (3) and when requiring mitigation under subsection (4), a governing body may not unreasonably restrict a landowner's ability to develop land, but it is recognized that in some instances the impacts of a proposed development may be deemed unmitigable and will preclude approval of the subdivision. Staff Comment: The six conditions of approval placed on this preliminary plat will not restrict the owner’s development of the Site. (b) When requiring mitigation under subsection (4) and consistent with 76-3-620, a governing body shall consult with the subdivider and shall give due weight and consideration to the expressed preference of the subdivider. Staff Comment: Under subsection 4 above, there is no loss of agricultural soils and, therefore, no mitigation required. (6) A governing body may conditionally approve or deny a proposed subdivision as a result of the water and sanitation information provided pursuant to 76-3-622 or public comment received pursuant to 76-3-604 on the information provided pursuant to 76-3- 622 only if the conditional approval or denial is based on existing subdivision, zoning, or other regulations that the governing body has the authority to enforce. Staff Comment: As noted on page 26, water and sanitary sewer service would be provided to the subdivision by the City of Bozeman and this service would not significantly burden City water or sanitary sewer infrastructure. (7) A governing body may not require as a condition of subdivision approval that a property owner waive a right to protest the creation of a special improvement district or a rural improvement district for capital improvement projects that does not identify the specific capital improvements for which protest is being waived. A waiver of a right to protest may not be valid for a time period longer than 20 years after the date that the final subdivision plat is filed with the county clerk and recorder. Staff Comment: The special improvement district (SID) waivers noted in Condition of Approval No. 6, found on page 11, follow City of Bozeman Resolution 5076, Policy 1 and are specifically pertinent to the development of this property and this subdivision. (8) A governing body may not approve a proposed subdivision if any of the features and improvements of the subdivision encroach onto adjoining private property in a manner that is not otherwise provided for under chapter 4 or this chapter or if the well isolation zone of DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 33 of 44 any proposed well to be drilled for the proposed subdivision encroaches onto adjoining private property unless the owner of the private property authorizes the encroachment. For the purposes of this section, "well isolation zone" has the meaning provided in 76-4-102. Staff Comment: A small section of the existing Spring Ditch agricultural irrigation facility is located near the northern boundary of this subdivision and encroaches into the northern portion of the subdivision’s stormwater easement. The Spring Ditch would not be altered with the development of this subdivision [see Surface Water discussion on page 25]. (9) If a federal or state governmental entity submits a written or oral comment or an opinion regarding wildlife, wildlife habitat, or the natural environment relating to a subdivision application for the purpose of assisting a governing body's review, the comment or opinion may be included in the governing body's written statement under 76-3-620 only if the comment or opinion provides scientific information or a published study that supports the comment or opinion. A governmental entity that is or has been involved in an effort to acquire or assist others in acquiring an interest in the real property identified in the subdivision application shall disclose that the entity has been involved in that effort prior to submitting a comment, an opinion, or information as provided in this subsection. Staff Comment: No federal or state governmental entity has commented on this subdivision proposal. (10) Findings of fact by the governing body concerning whether the development of the proposed subdivision meets the requirements of this chapter must be based on the record as a whole. The governing body's findings of fact must be sustained unless they are arbitrary, capricious, or unlawful. Staff Comment: These findings are noted in Section 7 of this report on pages 36 to 38. MCA 76.3.608(3)a. Effects on local services, the natural environment, wildlife and wildlife habitat, and public health and safety, 38.240.130.A.5.e (1) e. (3) The effect on local services. Water/Sewer – Water and sewer systems exist to serve the subdivision. The Applicant proposes to extend water and sewer mains to the subdivision. Code Provision No. 25 requires the Applicant to submit plans for water and sewer main extensions, approved by the Montana Department of Environmental Quality, to be reviewed by the City. Code Provision No. 2 requires a City standard sewer easement where the sewer system is located. Building permits would not be issued prior to City acceptance of site infrastructure improvements, unless concurrent construction is requested and conditions allow. Water rights exist for the subject property. The Applicant proposes to transfer to City ownership existing water rights as outlined in Code Provision No. 5. DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 34 of 44 Streets – The 2020 Bozeman Community Plan/Growth Policy and subdivision standards require adequate connectivity of a development to the street grid. Access to the Site would be taken from Vaquero Parkway, a designated local street. A new Stokes Lane would provide access from Vaquero Parkway along with a westward extension of Tschache Lane into the subdivision. An internal north-south alley bisecting the subdivision would be a publicly- accessible yet privately-maintained alley as outlined in Code Provision No. 3g. BMC 38.400.080, Sidewalks adjacent to public lands. This requires a sidewalk along the western side of the new Stokes Lane as it abuts a public park. Condition of Approval No. 3 requires the final plat to show a City-standard sidewalk meeting this code provision. This BMC standard and Condition of Approval No. 1 would implement the City Community Plan/Growth Policy N-1.8 which states: “Install, replace and maintain missing or damaged sidewalks, trails and shared use paths.” Walkability, Transit and Bikeability. This subdivision provides a sidewalk along the extension of Tschache Lane, along Stokes Lane, and provides a mid-block crossing pathway within the open space Lots OS-1 and OS-2. Not shown on Sheet 2 of the Preliminary Plat, but required by Condition of Approval No. 3, is a City-standard sidewalk along the west side of Stokes Lane, as required by the following BMC standards. Sec. 38.400.050. - Street and road right-of-way width and construction standards. A. All streets and roads providing access to, and within, the proposed development must meet the following standards: 1. Right-of-way width and construction standards contained in this chapter: the most recently adopted long range transportation plan; the City of Bozeman Design Standards and Specifications Policy; and the City of Bozeman Modifications to Montana Public Works Standard Specifications. Stokes Lane must meet the local street section and include sidewalk, boulevard, and street trees on both sides of the street. Sec. 38.400.080.B – Sidewalks adjacent to public lands. The developer must install sidewalks adjacent to public lands, including, but not limited to, parks, open space, and the intersection of alleys and streets or street easements. Applicable sidewalks and development frontages adjacent to public lands are subject to the provisions of section 38.510.030.I. Therefore, a 6- foot wide sidewalk is required on the west side of Stokes Lane per Condition of Approval No. 3. The Community Plan/growth policy encourages development to be walkable, which is defined in the Plan’s Appendix F Glossary as: Walkable. A walkable area has: • A center, whether it’s a main street or a public space. • People: Enough people for businesses to flourish and for public transit to run frequently. • Parks and public space: Functional and pleasant public places to gather and play. • Pedestrian design: Buildings are close to the street, parking lots are relegated to the back. • Schools and workplaces: Close enough that walking to and from home to these destinations is realistic. DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 35 of 44 • Complete streets: Streets designed for bicyclists, pedestrians, and transit. With the complexity of features needed to create a walkable environment, no one Site is likely to provide all the needed elements. The additional density of the proposed subdivision in this area is expected to help provide for element two above--to support public transit in in the area. Looking at the private, proprietary algorithm of WalkScore.com, the Site was given a Walk Score of 21 out of 100 which denotes that the Site and area are car-dependent. It has a Transit score of 19, which denotes minimal transit service, and a Bike Score of 41, which denotes that the area is “somewhat bikeable” according to the WalkScore.com algorithms. However, this algorithm walk, transit and bike score may not know the local assets in the area and there is no contact information on the website for staff to inquire as to how recent their data is for this area, or for the City. There is a Streamline “Brown line” bus stop at Oak at the County Regional Park. There are bicycle lanes surrounding the area on Davis Lane, Oak Street, Baxter Lane and Ferguson Avenue. A north-south bike route is located one block east on Hunters Way. The 2017 Bozeman Transportation Master Plan shows a recommended $250,000 bike path improvement (SP-16) which would extend bike travel lanes or a shared use path along Tschache Lane from Davis Lane west to N. 27th Avenue linking to other north-south facilities. There would be a shared use path along Vaquero Parkway installed by the Applicant and there are nearby shared use paths along Oak Street and Ferguson Avenue. Average walk score for the City as a whole was given a 48 out of 100. Again, these values are provided by Walk Score, a private organization which presents information on real estate and transportation through walkscore.com. A score is not an indication of safety or continuity of services or routes. Scores are influenced by proximity of housing, transit, trails, commerce and services and expected ability, as determined by the algorithm, to meet basic needs without using a car. There are no adopted BMC development standards relating to the walk score. A traffic impact summary was provided with the application and it found that the infrastructure that exists and is proposed for the project would adequately service the development and no upgrades were proposed for any nearby intersections. Police/Fire – The area of the subdivision is within the service area of both these departments. No concerns regarding service availability have been identified. Stormwater - The subdivision must construct storm water management and water quality facilities conforming to standards of the Bozeman Municipal Code. The maintenance of the stormwater facilities are the responsibility of the Home Owners’ Association (HOA) as outlined in Code Provisions Numbers 3a and 6. Inspection of installed facilities prior to final plat will verify that standards have been met. DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 36 of 44 Parklands – The Applicant has asked to provide both cash-in-lieu and improvements-in-lieu contributions in-lieu of providing parkland within the subdivision as required by BMC 38.420. Per conversations with the City of Bozeman Parks and Recreation Department (PARKS), a 10- foot wide paved shared-use pathway would be installed by the Applicant within the Vaquero Parkway right of way (ROW), located immediately east of the platted subdivision area, and would extend from the property’s northern boundary to the southern boundary. As part of this Improvements-in-lieu agreement, the shared use path may be further installed by the Applicant from Baxter Lane to Davis Lane. This has been discussed by PARKS as the ideal location for a shared-use pathway providing connectivity and access to the County Regional Park abutting the subdivision to the west through (1) the sidewalks within the subdivision; (2) through the mid-block crossing Open Space Lots OS-1 and OS-2; (3) to a stub-out concrete pad at the park’s eastern boundary on the same plane/alignment as the OS lots. This offer would be part of a combined cash- and improvements-in-lieu to satisfy their parkland requirement for the 44 new dwelling units. As the coordination of parkland contributions is ongoing with PARKS, the shared use path surfacing and exact locations and extents of the path improvements have yet to be finalized and, per Condition of Approval No. 2, details of this path must be finalized and submitted for City review and approval with the final plat application. (4) The effect on the natural environment. No significant negative impacts to the natural environment have been identified. The stormwater pond of Lot CA-1 at the northern end of the subdivision would be designed to ensure that stormwater would not adversely affect the Spring Ditch irrigation ditch and associated flora and fauna thereon. The Site is in a potential area of high groundwater which may negatively impact future structures or cause illicit discharges into the sanitary sewer and over burden the surface drainage system. Code Provision No. 3b prohibits crawl spaces or basement without first consulting a professional engineer certified in the State of Montana who would certify that groundwater would not harm these structures. This requirement will protect both future structure owners from future hazards of flooding and lessen burdens on the public from illicit discharges. BMC 38.550.070, Landscaping of public lands. This requires use of wells or surface water rights to irrigate right-of-way boulevard greens, parks and open spaces rather than municipal water supply. (5) The effect on wildlife and wildlife habitat. No animals listed under the “Animal Species of Special Concern”, (Montana Natural Heritage Program, Helena, 2003) have been observed or are known to occupy the property. Habitat most suitable for wildlife includes the area around the Spring Ditch that will not be developed. DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 37 of 44 (6) The effect on public health and safety. With the recommended conditions of approval and required plat corrections, the subdivision is not expected to adversely impact public health and safety. The intent of the regulations in Chapter 38 of the Bozeman Municipal Code (BMC) is to protect the public health, safety and general welfare. The subdivision has been reviewed by the DRC which has determined that it is in general compliance with the BMC standards with recommended conditions and code provisions. Conditions deemed necessary to ensure compliance have been noted throughout this staff report. Code Provision No. 1 requires full compliance with all applicable State and BMC code requirements. All subdivisions must be reviewed against the criteria listed in 76-3-608.3.b-d, Montana Code Annotated (MCA) and as a result, the Department of Community Development has reviewed this application against the listed criteria and further provides the following summary from Applicant submittal materials and code requirements. It is noted that all infrastructure would meet City standards. SECTION 7 – FINDINGS OF FACT, ORDER, AND APPEAL PROVISIONS A. PURSUANT to Chapter 38, Article 2, BMC, and other applicable sections of Chapter 38, BMC, public notice was given, opportunity to submit comment was provided to affected parties, and a review of the preliminary plat described in these findings of fact was conducted. B. The purposes of the preliminary plat review were to consider all relevant evidence relating to public health, safety, welfare, and the other purposes of Chapter 38, BMC; to evaluate the proposal against the criteria and standards of Chapter 38 BMC, BMC; and to determine whether the plat should be approved, conditionally approved, or denied. C. The matter of the preliminary plat application was considered by the City Commission at a public hearing on January 25, 2022 at which time the Department of Community Development Staff reviewed the project, submitted and summarized the conditions of approval, clarified unresolved issues and summarized the public comment submitted to the City prior to the public hearing. D. The owner and Applicant of this preliminary plat, Campeche Shores Development Company, LLC. Is represented by Hyalite Engineering and Mr. Brett Megaard who, on behalf of the owner/applicant, acknowledged understanding and agreement with the recommended conditions of approval and code provisions. E. The City Commission requested public comment at the public hearing on January 25, 2022 and no members of the public offered testimony on the proposed subdivision. F. It appeared to the City Commission that all parties and the public wishing to examine the proposed preliminary plat and offer comment were given the opportunity to do so. After receiving the recommendation of the relevant advisory bodies established by DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 38 of 44 Section Chapter 38, BMC, and considering all matters of record presented with the application and during the public comment period defined by Chapter 38, BMC, the City Commission has found that the proposed preliminary plat would comply with the requirements of the Bozeman Municipal Code if certain conditions were imposed. Therefore, being fully advised of all matters having come before her regarding this application, the City Commission makes the following decision. G. The preliminary plat has been found to meet the criteria of Chapter 38, BMC, and is therefore approved, subject to the conditions listed in Section 3 of this report and the correction of any elements not in conformance with the standards of the Chapter including those identified in Section 4 of this report. The evidence contained in the submittal materials, advisory body review, public testimony, and this report, justify the conditions imposed on this development to ensure that the final site plan and subsequent construction complies with all applicable regulations, and all applicable criteria of Chapter 38, BMC. H. This City Commission order may be appealed by bringing an action in the Eighteenth District Court of Gallatin County, within 30 days after the adoption of this document by the City Commission, by following the procedures of Section 76-3-625, MCA. The preliminary approval of this single phased major subdivision shall be effective for two (2) years from the date of the signed Findings of Fact and Order approval for this single-phase subdivision. At the end of this period the City may, at the request of the subdivider, grant an extension to its approval by the Community Development Director for a period of mutually agreed upon time. DATED this ______ day of ___________, 2022 BOZEMAN CITY COMMISSION ____________________________ Cynthia L. Andrus Mayor ATTEST _______________________ Mike Maas City Clerk DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 15th February Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 39 of 44 APPROVED AS TO FORM: ___________________________ GREG SULLIVAN City Attorney DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 40 of 44 APPENDIX A –PROJECT SITE ZONING AND GROWTH POLICY Project Site Zoning. The subject property is zoned R-3, Medium-density Residential District. The property was annexed into the City in 2001 by Resolution No. 3487. Records indicating when the property was given the R-3 zoning are unclear but by 2010, the Site was zoned R-3. Figure 5: R-3 zoning for the subject property and PLI zoning for the County Park The intent of the R-3 residential medium density district is to provide for the development of one- to five-household residential structures near service facilities within the city. This purpose is accomplished by: 1. Providing for minimum lot sizes in developed areas consistent with the established development patterns while providing greater flexibility for clustering lots and mixing housing types in newly developed areas. 2. Providing for a variety of housing types, including single household dwellings, two to four household dwellings, and townhouses to serve the varied needs of households of different size, age and character, while reducing the adverse effect of non-residential uses. Use of this zone is appropriate for areas with good access to parks, community services and/or transit. R-3 PLI DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 41 of 44 Staff Findings: This subdivision is located next to a regional park. The Streamline Brown Line bus route has a stop at the regional park along W. Oak Street. The Subdivision would provide lots for duplex, triplex and fourplex townhome dwelling units offering a mix of lot sizes. Adopted Growth Policy Designation: The Future Land Use Map of the Bozeman Community Plan designates the subject property to develop as “Parks and Open Space Lands” (green color on map). This is deemed a “Scribner’s error” or a mistake on our 2020 Community Plan land use map, as the property is zoned R-3, Medium-density Residential and is surrounded by lands designated the “Urban Neighborhood” land use category. The zoning designation of R- 3 District for this property confers to the owner the right to develop the land according to the uses and standards allowed by that R-3 District. The zoning surpasses the land use designation. When the Community Plan Future Land Use Map (FLUM) is next updated, this error will be corrected to reflect the correct designation of “Urban Neighborhood” for this Site. Figure 6: 2020 Community Plan Future Land Use Map of Site The Urban Neighborhood category (tan color on map) primarily includes “urban density homes in a variety of types, shapes, sizes, and intensities. Large areas of any single type of housing are discouraged. In limited instances, an area may develop at a lower gross density due to site constraints and/or natural features such as floodplains or steep slopes. Complementary uses such as parks, home-based occupations, fire stations, churches, schools, DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 42 of 44 and some neighborhood-serving commerce provide activity centers for community gathering and services.” “Higher density residential areas are encouraged to be, but are not required or restricted to, proximity to commercial mixed use areas to facilitate the provision of services and employment opportunities without requiring the use of a car.” Staff Findings: The proposed subdivision would provide a mix of lot sizes and a mix of housing types which are consistent with the Urban Neighborhood land use category and the Community Plan/growth policy goals and objectives. In particular, the mix of lot sizes and housing types would provide the mix of housing in this generally single-household neighborhood that addresses the objective that “Large areas of any single type of housing are discouraged.” Applicant’s Narrative. The following is a description by the Applicant as to the subdivision’s compliance with applicable Community Plan policies and objectives. “The Park View Crossing Subdivision has been carefully designed in conformance with the Bozeman Community Plan 2020. As a planned residential community, it is consistent with the Plan Themes and community-derived desired outcomes; specifically: “Theme 2: A City of Unique Neighborhoods” Goal N-1: Support well-planned, walkable neighborhoods. Park View Crossing will provide residents easy access to the neighboring park, while also being centrally located within the city and having multi-modal access to public transportation. A shared use pathway will be constructed along the west side of Vaquero Parkway that will provide park connection from the northern property boundary to the southern edge of the property. Sidewalks will also be provided throughout the development. Goal N-2: Pursue Simultaneous emergence of commercial nodes and residential development through diverse mechanisms in appropriate locations. The proposed subdivision will be the last of its kind in the vicinity, as it is surrounded by existing residential development on three sides and the County Regional Park on its fourth. Goal N-3: Promote a diverse supply of quality housing units. The townhomes constructed with the development will range from 4-plex to duplex units with individual lot sizes ranging from 7,600 sq. ft. to 2,800 sq. ft. This will provide residents with a variety of home choices while retaining the affordability of the individual units. Goal N-4: Continue to encourage Bozeman’s sense of place. The neighborhood will be sought after as it will provide more multifamily housing near the widely known and frequented County Park while maintaining close access to schools, off-leash facilities for dog walking, and public transportation into the city. The property is well within the City of Bozeman Limits, and planned for extension of water and wastewater infrastructure for conveyance to the City. All interior subdivision roads will be paved and include concrete curb, DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 43 of 44 gutter and sidewalks (per City of Bozeman Standard Specifications). The interior alley will be paved with an inverted crown.” Staff Findings: The proposed subdivision would provide a mix of housing types and lot sizes that would facilitate a mix of housing sizes and prices which could accommodate middle- income households and could provide smaller dwellings for “starter families” and/or “empty nest” households who could vacate older, larger homes elsewhere in the city which, in turn, could accommodate larger families. This supports the following Community Plan policies: N-1.1: “Promote housing diversity, including missing middle housing.” N-1.11: “Enable a gradual and predictable increase in density in developed areas over time.” N-3.7: “Support compact neighborhoods, small lot sizes, and small floor plans, especially through mechanisms such as density bonuses.” N-3.8: “Promote the development of “Missing Middle” housing (side by side or stacked duplex, triplex, live-work, cottage housing, group living, rowhouses/townhouses, etc) as one of the most critical components of affordable housing.” APPENDIX B – NOTICING AND PUBLIC COMMENT Notice was provided at least 15 and not more than 45 days prior to the Community Development Board and City Commission public hearings. Pursuant to BMC 38.220.420, notice was provided by posting the site, mailing by certified mail to the Applicant and adjacent property owners and by first class mail to all other owners within 200 feet on December 2, 2021. The site was posted with a notice on December 2, 2021 and a legal advertisement was published in the Bozeman Daily Chronicle on December 3rd and 17th, 2021. Content of the notice contained all elements required by Article 38.220., BMC. No written public comment has been received as of the writing of this staff report. A commenter spoke at the December 20, 2021 Community Development Board public hearing. Another commenter called the Community Development office on December 22, 2021 to express her concerns about the proposed development. The January 11, 2022 City Commission agenda contained an “action item” that requested the Commission to postpone the hearing on this application to their January 25, 2022 meeting. DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 Park View Crossing Major Subdivision Preliminary Plat; 21158 Page 44 of 44 APPENDIX C - OWNER INFORMATION Owner/Applicant: Campeche Shores Development Company, LLC. PO Box 3088, Galveston, TX 77552 Applicant Representative: Mr. Brett Megaard, PE, Hyalite Engineers, PLLC, 2304 N. 7th Avenue, Suite L, Bozeman, MT 59715 Report By: Susana Montana, Senior Planner, Development Review Division, Community Development Department. Staff Engineer: Karl Johnson, PE, Engineering Department ATTACHMENTS A-1 Application Form Subdivision Plat Sheets 1 through 3 (in a single document) The full application and file of record can be viewed digitally at https://www.bozeman.net/government/planning/using-the-planning-map, select the “Project Documents Folder” link and navigate to application #21158, as well as digitally at the Community Development Department at 20 E. Olive Street, Bozeman, MT 59715. Application materials – Available through the Laserfiche archive linked agenda materials and the full file is linked below. This project can be viewed on the Community Development Viewer interactive map directly with this link: https://gisweb.bozeman.net/Html5Viewer/?viewer=planning&FILE_NUMBER=21-158 Analysis and resulting recommendations are based on the entirety of the application materials, municipal codes, standards, and plans, public comment, and all other materials available during the review period. Collectively this information is the record of the review. The analysis is a summary of the completed review. DocuSign Envelope ID: 7A2B7E6E-A4EF-43D2-B254-3B88BABD16E5 193211DESIGNED BYCONSTRUCTION PLANSFOR PARKVIEW CROSSINGINFRASTRUCTURE IMPROVEMENTSBOZEMAN, MTCAMPECHE SHORES DEVELOPMENT COMPANY, LLC 03/08/2022PROJECT LOCATIONLOT 4 OF MINOR SUBDIVISION 400 LOCATED IN THE NE 14 OF SECTION 34, TOWNSHIP 1S, RANGE 5E, P.M.M., CITY OF BOZEMAN, GALLATIN COUNTY,MONTANA. THE PROJECT SITE IS GENERALLY LOCATED ALONG VAQUERO PARKWAY FROM EAST BAXTER LANE TO DAVIS LANE._______________________________ DATE: _____________BRETT MEGAARD, P.E.PROJECT ENGINEERSCALE: 1" = 500'GOVERNING SPECIFICATIONSMONTANA PUBLIC WORKS STANDARD SPECIFICATIONS (SEVENTH EDITION), CITY OF BOZEMAN MODIFICATIONS TO MONTANA PUBLICWORKS STANDARD SPECIFICATIONS (2011), CITY OF BOZEMAN DESIGN STANDARDS AND SPECIFICATIONS (2004 - INCLUDING ALL ADDENDA),AND OTHER CONTRACT PROVISIONS INCLUDED AND REFERENCED HEREIN.UTILITY COMPANIESNOTICE TO UTILITIES SHALL BE GIVEN BY THE CONTRACTOR. THE NOTICE SHALL STATE THE CONTEMPLATED START DATE, CONSTRUCTIONSCHEDULE, AND AREAS TO BE DISTURBED.THE CONTRACTOR IS REQUIRED TO GIVE 72-HOUR NOTICE TO ALL UTILITIES COMPANIES WHOSE UTILITIES MAY BE WITHIN THE PROJECTAREA OF PENDING CONSTRUCTION. EXISTING UTILITIES MAY EXIST AT LOCATIONS NOT SHOWN ON THE PLANS.A MONTANA 1-CALL SYSTEM EXISTS TO FACILITATE REQUESTS FOR UNDERGROUND FACILITY LOCATE INFORMATION. THE CONTRACTOR ISCAUTIONED THAT ALL UTILITIES ARE NOT INCLUDED WITH THE 1-CALL SYSTEM. THE 1-CALL DISPATCH NUMBER IS 1-800-425-5555.Project No.Know what'sbelow.before you dig.CallRG1.0W E B : w w w . h y a l i t e e n g . c o m2304 NORTH 7TH AVENUE STE. L B O Z E M A N , M T 5 9 7 1 8P H O N E : ( 4 0 6) 5 8 7 - 2 7 8 1 F A X : ( 4 0 6 ) 5 2 2 - 9 2 2 5PLANS PREPARED BY Mar 08, 2022 - 3:12pmCAD FILE: M:\193211\Drawings\Construction Drawings\_G1.0-COVER SHEET.dwg CONSTRUCTION DRAWINGS - 22x34 originalsHYALITE Engineers, PLLCPROJECT SITEMissoulaMiles CityMaltaKalispellHelenaHamiltonGreat FallsGlendiveButteBozemanBillingsCANADAWYOMINGNORTH DAKOTAIDAHO MONTANABRETT C.No. 29106 PEMEGAARDPEFORSOILNASRENI G ENE 03/08/2022VICINITY MAPSCALE: N.T.S.HUFFINE LNDURSTON RDBAXTER LANEI-9019TH AVENUE CITY OFBOZEMANFOURCORNERSVALLEY CENTER RDLOVE LNFERGUSON AVE PROJECT SITESHEET INDEXSHEET NUMBERSHEET TITLEG1.0COVER SHEETG1.1GENERAL NOTES & LEGENDC 1.0OVERALL SITE PLANC 2.0OVERALL SEWER PLANC 2.1LOOP SEWER P&PC 2.2ALLEY SEWER P&PC 2.10SEWER DETAILSC 2.11SEWER DETAILS (CONT.)C 3.0OVERALL WATER PLANC 3.1LOOP WATER P&PC 3.2ALLEY WATER P&PC 3.10WATER DETAILSC 3.11WATER DETAILS (CONT.)C 4.0OVERALL STORM WATER PLANC 4.1LOOP STORM P&PC 4.2DETENTION POND CONSTRUCTION DETAILC 4.10STORM DETAILSC 5.0OVERALL ROAD PLANC 5.1LOOP ROADS P&PC 5.2ALLEY ROADS P&PC 5.3SIGNAGE AND STRIPING PLANC 5.4LIGHTING PLANC 5.10ROAD DETAILSC 5.11ROAD DETAILS (CONT.)C 5.12LIGHTING DETAILSCITY OF BOZEMAN APPROVED FOR ONE YEAR FROM THIS DATE These plans an specifications have been reviewed by the Cityof Bozeman and are hereby approved. This approval does notimply any specific warranty of the project design by the City ofBozeman. All engineering design details and constructionoperations performance are the responsibility of the designengineer and the owner._____________________________________________________Date City Review Engineer03/14/2022kajohnson HEC Mar 08, 2022 - 3:12pmCAD FILE: M:\193211\Drawings\Construction Drawings\_G1.1-GENERAL NOTES & LEGEND.dwg REVISIONSDATEPROJECT NUMBERHYALITE Engineers, PLLC2304 N 7th Ave. Ste. LBozeman, MT 59715Tel: (406) 587.2781w w w . hyaliteeng. comFax: (406) 522.92252018PARKVIEW CROSSINGS BOZEMAN, MTCAMPECHE SHORES DEVELOPMENT, LLCMARCH 8, 2022193211CONSTRUCTION DRAWINGS - 22x34 originals INFRASTRUCTURE IMPROVEMENTSSCALESHEET TITLEDESIGN BYP.O. BOX 3088GALVESTON, TXAS NOTEDBVAS NOTEDG1.1GENERAL NOTES &LEGENDSANITARY SEWER MANHOLESANITARY SEWER SERVICESTANDARD FIRE HYDRANTWATER MAIN VALVETEMPORARY BLOW-OFF HYDRANTWATER SERVICESIDEWALKTRAILFENCINGEXTERIOR PROPERTY LINEINTERIOR PROPERTY LINEEASEMENT LINERIGHT OF WAYROAD CENTERLINEPROPOSED 8" SANITARY SEWER MAINPROPOSED 8" WATER MAINPROPOSED 16" SEWER MAINPROPOSED CURB AND GUTTEREXISTING BURIED FIBER OPTIC LINEEXISTING BURIED GAS LINEEXISTING OVERHEAD POWEREXISTING 8" WATER LINEEXISTING 16" WATER LINEEXISTING 8" SANITARY SEWER LINESECTION CORNER MONUMENT14 SECTION MONUMENTCONTROL POINT (SEE BENCHMARKS)PROPOSED CULVERTPROPOSED STORM MANHOLE IN CURBPROPOSED CATCH BASINS IN CURBPROPOSED STORM DRAIN PIPESTORM DRAINAGE FLOW DIRECTIONEXISTING SEWER MANHOLEEXISTING FIRE HYDRANTEXISTING WATER VALVEEXISTING TEMP. BLOW-OFF HYDRANTMASTER LINE & SYMBOL LEGENDSABBREVIATIONS1.ALL CONSTRUCTION WORK ON THIS PROJECT SHALL BE COMPLETED IN ACCORDANCEWITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS (SEVENTH EDITION), CITY OFBOZEMAN MODIFICATIONS TO MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS(2011), CITY OF BOZEMAN DESIGN STANDARDS AND SPECIFICATIONS (2004), AND OTHERCONTRACT PROVISIONS INCLUDED AND REFERENCED HEREIN.2.THE BENCHMARK DATUM USED FOR THIS PROJECT IS NAVD88.3.THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES. UTILITIES ARE KNOWNTO EXIST IN THE PROJECT AREA. THE 1-CALL NUMBER FOR MT IS 1-800-424-5555. ALLUTILITY INFORMATION SHOWN ON THE PLANS IS FROM THE BEST AVAILABLE DATA AT THETIME OF SITE SURVEY. THE CONTRACTOR SHALL CONTACT THE UTILITY COMPANIES FORLOCATIONS OF ALL UTILITY LINES AND SERVICES PRIOR TO CONSTRUCTIONCOMMENCEMENT.4.THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY MAJOR DISCREPANCIESBETWEEN FIELD CONDITIONS AND INFORMATION SHOWN ON PLANS.5.CONTRACTOR SHALL FIELD-VERIFY LINE AND GRADE OF EXISTING UTILITY CONNECTIONSPRIOR TO START OF CONSTRUCTION FOR THE APPROPRIATE UTILITY.6.MAINTAIN A MINIMUM OF 10 FEET HORIZONTAL AND 18 INCHES VERTICAL SEPARATIONBETWEEN SEWER MAINS AND WATER MAINS.7.ALL MAINS AND SERVICE LINES WITH LESS THAN DESIGNED BURY DEPTHS SHALL BEINSULATED WITH ADEQUATE AMOUNT OF RIGID INSULATION BOARD (1" OF RIGIDINSULATION BOARD IS EQUIVALENT TO 1' OF BURY DEPTH).8.CONTRACTOR SHALL VERIFY WITH ENGINEER ALL EXCAVATION PROCEDURES INCLUDINGSTORAGE OF TOP SOIL, DISTRIBUTION OF EXCESS SOIL, ROUGH GRADE, FINISH GRADE,ETC.9.CONTRACTOR SHALL PROVIDE POSITIVE SITE DRAINAGE AWAY FROM BUILDINGS AND/ORSTORAGE FACILITIES ON ALL SIDES AND PROTECT MATERIAL STOCKPILES FROM EROSION.10.U.N.O., BACKFILLING SHALL BE DONE IN 8" LIFTS OR LESS ACCORDING TO THE SPECIFIEDCOMPACTION STANDARDS. FILL AND BACKFILL SHALL BE COMPACTED AT OR NEAROPTIMUM MOISTURE CONTENT PER MPWSS.11.ALL MATERIALS USED FOR PIPE BEDDING SHALL CONSIST OF CLEAN, GRANULARMATERIALS, AND SHALL CONFORM TO THE REQUIREMENTS LISTED FOR BEDDING MATERIALIN THE SPECIFIED STANDARDS.12.U.N.O. BACKFILL SHOULD BE COMPACTED TO 95% RELATIVE COMPACTION IN AREAS UNDERSTRUCTURES, UTILITIES, ROADWAYS, PARKING AREAS AND CONCRETE FLATWORK, AND TO90% RELATIVE COMPACTION IN UNDEVELOPED AREAS. RELATIVE COMPACTION SHALL BEIN ACCORDANCE WITH ASTM D698 COMPACTION TEST METHOD.13.THE CONTRACTOR SHALL SUBMIT CONSTRUCTION SUBMITTALS FOR ALL COMPONENTSBEFORE INSTALLING AND CONSTRUCTING THE IMPROVEMENTS AND PRIOR TO ORDERINGTHE MATERIALS. THE ENGINEER SHALL HAVE FIVE (5) WORKING DAYS TO REVIEW THESUBMITTALS.14.CONTRACTOR SHOULD TAKE NOTE CONSTRUCTION DE-WATERING IS MOST LIKELYNEEDED.15.THE ENGINEER IS RESPONSIBLE FOR ALL CONSTRUCTION STAKING, PROVIDING;·VERTICAL CONTROL- PROVIDED BY SEVERAL BENCHMARKS THROUGHOUT THE SITE, ASSHOWN ON CONSTRUCTION PLANS. (SEE SHEET G1.2)·PIPING- HORIZONTAL AND VERTICAL CONTROL WILL BE GIVEN AT EACH CHANGE INHORIZONTAL ALIGNMENT, PIPE TERMINATION, STRUCTURE, EACH FITTING AND AT 50 FOOTINTERVALS ALONG THE PIPE OFFSET FROM EXCAVATIONS.·STRUCTURES- HORIZONTAL AND VERTICAL CONTROL WILL BE GIVEN AT THE PIPECENTERLINE OF EACH NEW STRUCTURE.·STRIPPING LIMITS, WATER, SEWER, AND STORM WATER STAKES WILL BE STAKED ONETIME EACH, WITH TBC STAKES BEING STAKED TWICE, ONCE FOR ROUGH GRADE AND FORFINAL GRADE. OTHER INSTANCES WILL BE STAKED AT THE REQUEST AND EXPENSE OFTHE CONTRACTOR.16.THE ENGINEER IS RESPONSIBLE FOR ALL CONSTRUCTION INSPECTION & QUALITYCONTROL;·THE ENGINEER SHALL BE RESPONSIBLE FOR QUALITY CONTROL TESTS AND INSPECTIONSTO CONTROL CONTRACTOR PRODUCTION AND CONSTRUCTION PROCESSES.·SAMPLING AND TESTING TO ASSURE SPECIFICATION CONFORMANCE AND PERFORMED BYTHE OWNER OR THE OWNER'S REPRESENTATIVE AS QUALITY ASSURANCE TESTING.·QUALITY ASSURANCE TESTING IS PERFORMED AT THE OWNER'S DISCRETION ANDFOLLOWING THE STANDARDS IN THE MPWSS AS WELL AS THE CITY OF BOZEMANMODIFICATIONS TO MPWSS.·CONTRACTOR TO REFERENCE SECTION 02230 OF THE CITY OF BOZEMAN MODIFICATIONSTO MPWSS FOR REQUIREMENTS ON EXCAVATION, BACKFILL AND COMPACTION.·TEMPORARY MATERIALS STORAGE AND STOCKPILE LOCATION SHALL BE WITHIN CLIENTPROPERTY IN THE VICINITY OF THE PROJECT SITE, U.N.O..·MATERIALS AND CONSTRUCTION METHODS SHALL CONFORM TO THE CONTRACTDOCUMENTS AND SPECIFICATIONS.GENERAL CONSTRUCTION NOTESHYDS@CLCONCCONTCPDIDIA, ØEAEGELECELEVEQFGFMH, HTHORIZIDINTMATLMAXMECHMFRMHMJMINMISCMTLNTSO.C.ODP&PRREFREQ'DROWSCHEDSDISFSIMSPECSQSTDSVCTBCT.O.TYPU.N.O.W/W/OATCENTER LINECONCRETECONTINUOUSCONTROL POINTDRAIN INLETDIAMETEREACHEXISTING GRADEELECTRICALELEVATIONEQUALFINISH GRADEFORCE MAINHEIGHTHORIZONTALINSIDE DIAMETERINTERIORMATERIALMAXIMUMMECHANICALMANUFACTURERMANHOLEMECHANICAL JOINTMINIMUMMISCELLANEOUSMETALNOT TO SCALEON CENTEROUTSIDE DIAMETERPLAN & PROFILERADIUSREFERENCEREQUIREDRIGHT OF WAYSCHEDULESTORM DRAIN INLETSQUARE FEETSIMILARSPECIFICATIONSQUARESTANDARDSERVICETOP BACK OF CURBTOP OFTYPICALUNLESS NOTED OTHERWISEWITHWITHOUT8''S8''W16''WGASFOOHP8''W16''WST GENERAL SEWER CONSTRUCTION NOTES1.THE CONTRACTOR SHALL ADJUST ALL MANHOLES AND LIDS TO FINAL GRADE UPONCOMPLETION OF ALL CIVIL/SITE CONSTRUCTION. ANY PROPERTIES DAMAGED OROTHERWISE DISTURBED BY THE CONTRACTOR SHALL BE REPAIRED AT THECONTRACTORS OWN EXPENSE.2.SANITARY SEWER SYSTEM INSTALLATIONS SHALL BE IN ACCORDANCE WITH ALLAPPLICABLE CODES AND REGULATIONS.3.SANITARY SEWER STUB-OUTS FOR FUTURE CONNECTION SHALL BE CAPPED 8' PAST THEPROPERTY LINE. THE CAPPING OF THE SANITARY SEWER MAINS AND SERVICES SHALLINCLUDE A PLUG/CAP AND WOOD MARKER POST PAINTED GREEN.4.PIPE LENGTHS ARE CALCULATED FROM EDGE OF STRUCTURE TO EDGE OF STRUCTURE.THE PIPE GRADES SHOWN ARE CALCULATED FROM ACTUAL DISTANCES BETWEENINVERT IN AND INVERT OUT TO ILLUSTRATE ACTUAL SLOPE. GENERAL WATER CONSTRUCTION NOTES1.THE CONTRACTOR SHALL ADJUST ALL VALVE BOXES AND CURB BOXES TO FINAL GRADEUPON COMPLETION OF ALL CIVIL/SITE CONSTRUCTION. ANY PROPERTIES DAMAGED OROTHERWISE DISTURBED BY THE CONTRACTOR SHALL BE REPAIRED AT THECONTRACTORS OWN EXPENSE.2.WATER SERVICES SHALL BE INSTALLED UNDER PROPOSED UTILITIES TO MAINTAIN 18"VERTICAL SEPARATION (U.N.O.). CARE SHALL BE TAKEN TO INSURE HIGH POINTS ARE NOTCREATED IN THE SERVICE LINES.3.WATER SYSTEM INSTALLATIONS SHALL BE IN ACCORDANCE WITH ALL APPLICABLE CODESAND REGULATIONS.4.CONTRACTOR TO MAINTAIN OR PROVIDE ACCESS TO ALL RESIDENTIAL HOMES AND/ORCOMMERCIAL BUSINESSES FOR THE DURATION OF THE CONSTRUCTION PROJECT.5.SIZE OF FITTING(S) SHOWN ON DRAWINGS CORRESPOND TO ADJACENT STRAIGHT RUNOF PIPE UNLESS OTHERWISE INDICATED. TYPE OF JOINT AND FITTING MATERIAL SHALLBE THE SAME AS SHOWN FOR ADJACENT STRAIGHT RUN OF PIPE.6.THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURSPRIOR TO BEGINNING ANY WORK. CITY OF BOZEMAN WILL OPERATE ALL EXISTINGVALVES.7.WATER SYSTEM STUB OUTS FOR FUTURE CONNECTIONS SHALL BE CONSTRUCTED WITHA CURB STOP 8' PAST THE RIGHT OF WAY. THE WATER SERVICES SHALL INCLUDE A CURBSTOP AND STEEL POST PAINTED BLUE.8.ALL VALVES, END CAPS AND PIPING TEES, CROSSES AND BENDS GREATER THAN OREQUAL TO 22.5° MUST HAVE THE PROPER THRUST BLOCKING IN PLACE. MEGA-LUGS CANBE USED AS PROPER THRUST BLOCKING (WITH APPROVED LENGTHS OF PIPE). GENERAL STORM DRAINAGE CONSTRUCTION NOTES1.THE CONTRACTOR SHALL ADJUST ALL STORM DRAIN INLETS TO FINAL GRADE UPONCOMPLETION OF ALL CIVIL/SITE CONSTRUCTION. ANY PROPERTIES DAMAGED OROTHERWISE DISTURBED BY THE CONTRACTOR SHALL BE REPAIRED AT THECONTRACTORS OWN EXPENSE.2.STORM SEWER SYSTEM INSTALLATIONS SHALL BE IN ACCORDANCE WITH ALL APPLICABLECODES AND REGULATIONS.3.ALL UTILITIES CROSSING THE STORM SEWER MAIN SHALL MAINTAIN 18" OF SEPARATIONOR PROVIDE RIGID INSULATION APPROVED FOR BURY TO PROVIDE 18" EQUIVALENTSEPARATION.4.PIPE LENGTHS ARE CALCULATED FROM EDGE OF STRUCTURE TO EDGE OF STRUCTURE.THE PIPE GRADES SHOWN ARE CALCULATED FROM ACTUAL DISTANCES BETWEEN INVERTIN AND INVERT OUT TO ILLUSTRATE ACTUAL SLOPE. GENERAL ROAD CONSTRUCTION NOTES1.CONTRACTOR TO COORDINATE WITH ENGINEER IF USING GPS GRADE CONTROLEQUIPMENT FOR ROAD CONSTRUCTION, PRIOR TO STARTING CONSTRUCTION.8''SCPBV 4705STSTSTSTSTSTSTST STSTSTSTSTSTSTSTSTSTSTSTSTSTSTST8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S 8''S 8''S 8''S 8''S 8''S 8''S 8''S 8''S 8''S8''S8''S8''S8''SSSSSSSSS8''S8''S8''S8'' S SSS8''SSSS8''W8''W8''W8''W8''W8''W8''WHYD8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''WHYDHYDHYD8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''WHYDHYD471547 1 0 4710LOT 1ALOT 1B7595SQ FT0.17ACRESLOT 1CLOT 1D3800SQ FT0.09ACRES4187SQ FT0.10ACRES6740SQ FT0.15ACRES4927SQ FT0.11ACRES4346SQ FT0.10ACRES3045SQ FT0.07ACRES2754SQ FT0.06ACRES2849SQ FT0.07ACRES3268SQ FT0.08ACRES4117SQ FT0.09ACRES4113SQ FT0.09ACRES5006SQ FT0.11ACRES3588SQ FT0.08ACRES3899SQ FT0.09ACRES3499SQ FT0.08ACRES3900SQ FT0.09ACRES5504SQ FT0.13ACRES3717SQ FT0.09ACRES4851SQ FT0.11ACRES3804SQ FT0.09ACRES2820SQ FT0.06ACRES3497SQ FT0.08ACRES3441SQ FT0.08ACRES4226SQ FT0.10ACRES3886SQ FT0.09ACRES3089SQ FT0.07ACRES2820SQ FT0.06ACRES2979SQ FT0.07ACRES4551SQ FT0.10ACRES4353SQ FT0.10ACRES7691SQ FT0.18ACRES3914SQ FT0.09ACRES4681SQ FT0.11ACRES4332SQ FT0.10ACRES3651SQ FT0.08ACRES5377SQ FT0.12ACRES3759SQ FT0.09ACRES4032SQ FT0.09ACRES3309SQ FT0.08ACRESLOT 9ALOT 8CLOT 9BLOT 7CLOT 8DLOT 9DLOT 7DLOT 8BLOT 6BLOT 7BLOT 6ALOT 7ALOT 6DLOT 6CLOT 9CLOT 8A2820SQ FT0.06ACRESLOT 3CLOT 3B2820SQ FT0.06ACRESOS-1 950 SQ FTOS-2 1234 SQ FTLOT 3DLOT 5ALOT 1ALOT 1BLOT 1CLOT 2ALOT 4CLOT 4BLOT 4ALOT 4DLOT 5BLOT 5CLOT 5DLOT 2BLOT 3ALOT 1DLOT 2ALOT 1BLOT 1CLOT 2BLOT 2CLOT 1A2879SQ FT0.07ACRES2824SQ FT0.06ACRESCA 112679SQ FT0.29ACRESHEC Mar 08, 2022 - 3:13pmCAD FILE: M:\193211\Drawings\Construction Drawings\C1.0 OVERALL.dwg REVISIONSDATEPROJECT NUMBERHYALITE Engineers, PLLC2304 N 7th Ave. Ste. LBozeman, MT 59715Tel: (406) 587.2781w w w . hyaliteeng. comFax: (406) 522.92252018PARKVIEW CROSSINGS BOZEMAN, MTCAMPECHE SHORES DEVELOPMENT, LLCMARCH 8, 2022193211CONSTRUCTION DRAWINGS - 22x34 originals INFRASTRUCTURE IMPROVEMENTSSCALESHEET TITLEDESIGN BYP.O. BOX 3088GALVESTON, TXAS NOTEDBV0'60'120'180'OVERALL SITE PLANC1.0CONNECT TO EXTG8" WATER MAINEXISTINGSTORM POND5BPROPOSED FIREHYDRANT (TYP.)PROPOSED 8" SSWRMAIN (TYP.)PROPOSED 8"WATER MAIN (TYP.)UNDERGROUND DRYUTILITY CONDUITSPER NWE (TYP.)CONNECT TO EXTG8" WATER MAINCONNECT TO EXTGSEWER MAIN STUBTHE CROSS ING AT BAXTER MEADOWSPROPOSED STORMINLET (TYP.)PROPOSED SSWRMANHOLE (TYP.)PROPOSED STORMMANHOLE (TYP.)PROPOSED 15"STORM SEWER (TYP.)TSCHACHE LANEVAQUERO PARKWAYROAD APROPOSEDSTORM PONDEXTENSIONPROPOSED WATERVALVE (TYP.)EXISTING WATER MAIN(TYP.)EXISTING SEWER MAIN(TYP.)EXISTING STORM MAIN(TYP.)60'PROPOSEDR.O.W.10'UTIL ITYEASEMENT(TYP . )50' WATERCOURSE SETBACKZONE 1: 0-30' FROM HIGH WATERZONE 2: 30-50' FROM HIGH WATERZONE 2ZONE 110' WIDE SHARED USE PATHWAYTO BE CONSTRUCTED FROM NORTHERNTO SOUTHERN PROPERTY BOUNDARY,WITHIN VAQUERO PARKWAY R.O.W. STSTSTSTSTSTSTST STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTLOT 1ALOT 1BLOT 1CLOT 1DLOT 9ALOT 8CLOT 9BLOT 7CLOT 8DLOT 9DLOT 7DLOT 8BLOT 6BLOT 7BLOT 6ALOT 7ALOT 6DLOT 6CLOT 9CLOT 8ALOT 3CLOT 3BLOT 3DLOT 5ALOT 1ALOT 1BLOT 1CLOT 2ALOT 4CLOT 4BLOT 4ALOT 4DLOT 5BLOT 5CLOT 5DLOT 2BLOT 3ALOT 1DLOT 2ALOT 1BLOT 1CLOT 2BLOT 2CLOT 1ACA 18''W8''W8''W8''W8''W8''W8''WHYD8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''WHYDHYDHYD8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''WHYDHYD0+001+002+003+004+005+006+007+008+009+0010+001 1 + 0 0 1 2 + 0 0 1 3 + 0 0 1 4 + 0 0 1 4 + 4 8 100+00101+00102+00103+00104+00105+00106+00107+008''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S 8''S 8''S 8''S 8''S 8''S 8''S 8''S 8''S8''S8''S8''S8''SSSSSSSSS8''S8''S8''S8'' S SSS8''SSSS47154710471047050'60'120'180'HEC Mar 08, 2022 - 3:13pmCAD FILE: M:\193211\Drawings\Construction Drawings\C2.0 SEWER.dwg REVISIONSDATEPROJECT NUMBERHYALITE Engineers, PLLC2304 N 7th Ave. Ste. LBozeman, MT 59715Tel: (406) 587.2781w w w . hyaliteeng. comFax: (406) 522.92252018PARKVIEW CROSSINGS BOZEMAN, MTCAMPECHE SHORES DEVELOPMENT, LLCMARCH 8, 2022193211CONSTRUCTION DRAWINGS - 22x34 originals INFRASTRUCTURE IMPROVEMENTSSCALESHEET TITLEDESIGN BYP.O. BOX 3088GALVESTON, TXAS NOTEDBVOVERALL SEWER PLANC2.0CONNECT TO EXTG. SEWERMAIN STUB W/NEW MANHOLE1.ALSO SEE NOTES ON SHEET G1.1.2.PROTECT IN PLACE ALL EXISTING UTILITIES UNLESS NOTED OTHERWISE. IF CONFLICT EXISTS,NOTIFY THE ENGINEER IMMEDIATELY.3.EXISTING VEGETATION OUTSIDE OF ROADWAY CUT FILL SLOPES MUST BE PROTECTED.EXISTING VEGETATION WITHIN THE NEW ROADWAY PRISM IS TO BE REMOVED AND DISPOSED OFBY THE CONTRACTOR.4.WHERE LOT DIMENSIONS ALLOW, SEWER SERVICES ARE TO BE LOCATED 15' OFF THEDOWNSTREAM PROPERTY LINE (OTHERWISE LOCATED AS SHOWN). ALL SEWER SERVICES SHALLEND 8' INSIDE OF THE PROPERTY LINE.5.ALL SEWER MANHOLES ARE TO BE WATERPROOFED, AS GROUNDWATER WILL MOST LIKELY BE AFACTOR.GENERAL SEWER NOTESPROPOSED 48" DIA.MANHOLE (TYP.)PROPOSED8" SDR35PVC SEWERMAIN (TYP.)PROPOSED 4" SCH 40PVC SSWR SVC (TYP.)LOOPALIGNMENTALLEYALIGNMENTTSCHACHE LANEVAQUERO PARKWAYROAD A 46904700471047204730469047004710472047300+004705.24705.64699.071+004706.14699.774706.94700.832+004707.74708.53+004709.24709.64+004709.94710.15+004710.4 4710.66+004710.9 4711.17+004711.4 4711.68+004712.0 4712.39+004712.7 4713.110+004713.4 4713.811+004714.0 4713.712+004713.2 4712.913+004712.8 4712.114+008" Ø SDR35 PVC L=120.43' S=2.07%8" Ø SDR35 PVC L=43.83' S=-2.03%8" Ø SDR35 PVC L=91.81' S=-1.30%8" Ø SDR35 PVC L=51.76' S=-2.03%SSMH-3STA. 2+06.34 (-6.01' L)RIM ELEV = 4706.858"INV OUT = 4700.95SSMH-1STA. 0+54.98 (-7.14' L)RIM ELEV = 4705.038" INV IN = 4698.518"INV OUT = 4698.31 SSMH-9 STA. 10+48.90 (5.48' R) RIM ELEV = 4713.24 8"INV OUT = 4706.05 SSMH-8 STA. 12+21.13 (5.49' R) RIM ELEV = 4713.37 8"INV OUT = 4704.45 EXISTING MH-2STA. 3+86.10 (0.00' )RIM ELEV = 4705.378" INV IN = 4697.90 INSTALL 150 LF OF 8"Ø SDR 35PVC SEWER MAININSTALL 170 LF OF 8"Ø SDR 35PVC SEWER MAINSTA. (ALLEY)INV IN = 4699.90INV IN = 4699.90INV OUT = 4699.70SSMH-2STA. 1+50.59 (-6.01' L)RIM ELEV = 4706.16100+16.38 STA. (ALLEY) INV IN = 4703.56 INV IN = 4703.56 INV OUT = 4703.36 SSMH-7 STA. 11+73.31 (5.50' R) RIM ELEV = 4713.75 106+96.76STA. 0+67.5512"Ø A2000 PVC PIPEINV. ELEV.= 4702.57STA. 1+61.798" DIA. DI WATER PIPEINV. ELEV.= 4697.4318" MIN.SEPARATIONBLOCK 2 BLOCK 1 BLOCK 3 LOT 1A LOT 1B LOT 1C LOT 1DLOT 9ALOT 8C LOT 9B LO T 7C LOT 8D LOT 9D LO T 7D LO T 8B LO T 6B LO T 7B LO T 6A LO T 7A LO T 6D LO T 6C LOT 9C LO T 8A LO T 3C LO T 3B LO T 3D LO T 5A LOT 1ALOT 1BLOT 1CLOT 2A LO T 4C LO T 4B LO T 4A LO T 4D LO T 5B LO T 5C LO T 5D LOT 2BLOT 3A LOT 1D LO T 2A LO T 1B LO T 1C LO T 2B LO T 2C LO T 1A CA 18''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S S S S S S S 8''S8''S8''S8''S8''S S S S8''SS S S STSTSTSTSTSTSTSTSTSTSTST ST ST ST STSTSTSTSTSTSTSTSTSTST STSTSTST8''W8''W8''W8''W8''W8''W 8''W 8''W HY D 8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W HYD8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''WHY D HYD 172°SVC @ STA.0+80.56' (38.00')SVC @ STA.1+22.95' (38.00')SVC @ STA.1+65.38' (38.00')SVC @ STA.1+96.29' (38.00')SVC @ STA.10+68.10' (38.00')SVC @ STA.11+02.10' (38.00')SVC @ STA.11+36.10' (38.00')SVC @ STA.11+80.10' (38.00')SVC @ STA.12+00.10' (38.00')0+001+002+003+004+005+006+007+008+009+0010+0011+00 12+00 13+00SSMH-7SSMH-2SSMH-8SSMH-9SSMH-1SSMH-30'50'100'150'SCALE1" = 50' HORIZ.1" = 5' VERT.LOOP SEWER P&PSTA. 0+00 TO STA. 14+00AS NOTEDFINISHED GRND. ELEV. @ ℄ PIPE INVERT ELEV. @ ℄LOOP SEWER P&PC2.1HEC Mar 08, 2022 - 3:13pmCAD FILE: M:\193211\Drawings\Construction Drawings\C2.1 SEWER P&P.dwg REVISIONSDATEPROJECT NUMBERHYALITE Engineers, PLLC2304 N 7th Ave. Ste. LBozeman, MT 59715Tel: (406) 587.2781w w w . hyaliteeng. comFax: (406) 522.92252018PARKVIEW CROSSINGS BOZEMAN, MTCAMPECHE SHORES DEVELOPMENT, LLCMARCH 8, 2022193211CONSTRUCTION DRAWINGS - 22x34 originals INFRASTRUCTURE IMPROVEMENTSSCALESHEET TITLEDESIGN BYP.O. BOX 3088GALVESTON, TXAS NOTEDBVDRY UTILITY CONDUITS (TYP.)INSTALL PER NWE STANDARDSLOOPALIGNMENTROAD AEXISTING SSWRSERVICE TO LOT 2C 469047004710472047304690470047104720473097+0098+0099+00100+004706.54700.014707.14700.21101+004707.74700.414708.1 4700.61102+004708.4 4701.02 4708.6 4701.23103+004708.9 4701.64 4709.2 4701.86104+004710.0 4702.07 4711.0 4702.28105+004712.0 4702.70 4713.0 4702.92106+004713.9 4703.13 4713.8 4703.35107+00108+00109+00110+00111+00INSTALL 670 LF OF 8"Ø SDR 35PVC SEWER MAIN8" Ø SDR35 PVC L=195.23' S=-0.41%8" Ø SDR35 PVC L=89.24' S=-0.45%8" Ø SDR35 PVC L=182.16' S=-0.44%8" Ø SDR35 PVC L=194.21' S=-0.44%SSMH-4 STA. 102+22.23 (-3.17' L) RIM ELEV = 4708.24 8" INV IN = 4700.90 8"INV OUT = 4700.70 SSMH-5 STA. 103+16.97 (-3.96' L) RIM ELEV = 4708.70 8" INV IN = 4701.50 8"INV OUT = 4701.30 SSMH-6 STA. 105+03.68 (-4.45' L) RIM ELEV = 4711.03 8" INV IN = 4702.50 8"INV OUT = 4702.30 STA. (ALLEY)INV IN = 4699.90INV IN = 4699.90INV OUT = 4699.70SSMH-2STA. 1+50.59 (-6.01' L)RIM ELEV = 4706.16 100+22.33 STA. (ALLEY) INV IN = 4703.56 INV IN = 4703.56 INV OUT = 4703.36 SSMH-7 STA. 11+73.31 (5.50' R) RIM ELEV = 4713.75 107+02.2618" MIN.SEPARATIONSTA. 106+90.918" DIA. DI WATER PIPEINV. ELEV.= 4705.59BLOCK 2 BLOCK 1 BLOCK 3 LOT 1A LOT 1B LOT 1C LOT 1DLOT 9ALOT 8C LOT 9B LO T 7C LOT 8D LOT 9D LO T 7D LO T 8B LO T 6B LO T 7B LO T 6A LO T 7A LO T 6D LO T 6C LOT 9C LO T 8A LO T 3C LO T 3B LO T 3D LO T 5A LOT 1ALOT 1BLOT 1CLOT 2A LO T 4C LO T 4B LO T 4A LO T 4D LO T 5B LO T 5C LO T 5D LOT 2BLOT 3A LOT 1D LO T 2A LO T 1B LO T 1C LO T 2B LO T 2C LO T 1A CA 18''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S S S S S S S 8''S8''S8''S8''S8''S S S S8''SS S S STSTSTSTSTSTSTSTSTSTSTST ST ST ST STSTSTSTSTSTSTSTSTSTST STSTSTST8''W8''W8''W8''W8''W8''W 8''W 8''W HY D 8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W HYD8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''WHY D HYD 172°SVC @ STA.100+64.13' (23.00') SVC @ S T A . 1 0 6 + 2 4 . 5 3 ' ( - 2 3 . 0 0 ' ) SVC @ S T A . 1 0 5 + 9 6 . 0 7 ' ( - 2 3 . 0 0 ' ) SVC @ S T A . 1 0 5 + 6 5 . 9 5 ' ( - 2 3 . 0 0 ' ) SVC @ S T A . 1 0 4 + 8 1 . 0 3 ' ( - 2 3 . 0 0 ' ) SVC @ S T A . 1 0 4 + 5 0 . 9 6 ' ( - 2 3 . 0 0 ' ) SVC @ S T A . 1 0 4 + 2 0 . 9 0 ' ( - 2 3 . 0 0 ' ) SVC @ S T A . 1 0 3 + 9 0 . 8 4 ' ( - 2 3 . 0 0 ' ) SVC @ S T A . 1 0 3 + 2 4 . 0 1 ' ( - 2 3 . 0 0 ' ) SVC @ S T A . 1 0 2 + 8 3 . 1 4 ' ( - 2 3 . 0 0 ' ) SVC @ STA.1 0 2 + 5 0 . 1 1 ' ( - 2 2 . 9 9 ' ) SVC @ STA.102+02.30' (-23.00')SVC @ STA.101+65.67' (-23.00')SVC @ STA.101+35.13' (-23.00')SVC @ STA.101+03.71' (-23.00')SVC @ STA.100+59.73' (-23.00')SVC @ STA.101+23.36' (23.00')SVC @ STA.101+53.78' (23.00')SVC @ STA.101+83.44' (23.00')SVC @ STA.102+11.49' (23.00')SVC @ STA.102+39.73' (23.00')SVC @ STA.102+65.52' (23.00')SVC @ STA . 1 0 2 + 9 7 . 3 7 ' ( 2 3 . 0 0 ' ) SVC @ S T A . 1 0 3 + 2 5 . 6 5 ' ( 2 3 . 0 0 ' ) SVC @ S T A . 1 0 3 + 5 5 . 2 9 ' ( 2 3 . 0 0 ' ) SVC @ S T A . 1 0 4 + 1 6 . 3 8 ' ( 2 3 . 0 0 ' ) SVC @ S T A . 1 0 4 + 4 6 . 3 9 ' ( 2 3 . 0 0 ' ) SVC @ S T A . 1 0 4 + 7 6 . 4 0 ' ( 2 3 . 0 0 ' ) SVC @ S T A . 1 0 4 + 9 6 . 7 5 ' ( 2 3 . 0 0 ' ) SVC @ S T A . 1 0 5 + 3 7 . 7 8 ' ( 2 3 . 0 0 ' ) SVC @ S T A . 1 0 5 + 6 7 . 7 8 ' ( 2 3 . 0 0 ' ) SVC @ S T A . 1 0 5 + 9 7 . 7 8 ' ( 2 3 . 0 0 ' ) SVC @ S T A . 1 0 6 + 2 7 . 7 8 ' ( 2 3 . 0 0 ' )100+00101+00102+00103+00104+00105+00106+00107+00SSMH-4SSMH-5SSMH-60'50'100'150'SCALE1" = 50' HORIZ.1" = 5' VERT.ALLEY SEWER P&PSTA. 97+00 TO STA. 111+00AS NOTEDFINISHED GRND. ELEV. PIPE INVERT ELEV. @ ℄ALLEY SEWER P&PC2.2HEC Mar 08, 2022 - 3:13pmCAD FILE: M:\193211\Drawings\Construction Drawings\C2.1 SEWER P&P.dwg REVISIONSDATEPROJECT NUMBERHYALITE Engineers, PLLC2304 N 7th Ave. Ste. LBozeman, MT 59715Tel: (406) 587.2781w w w . hyaliteeng. comFax: (406) 522.92252018PARKVIEW CROSSINGS BOZEMAN, MTCAMPECHE SHORES DEVELOPMENT, LLCMARCH 8, 2022193211CONSTRUCTION DRAWINGS - 22x34 originals INFRASTRUCTURE IMPROVEMENTSSCALESHEET TITLEDESIGN BYP.O. BOX 3088GALVESTON, TXAS NOTEDBVALLEYALIGNMENT83.5°162.5°168.6°170.5° SCALE: N.T.S.51UTILITY TRENCHSCALE: N.T.S.52SEWER SERVICE (CoB DRAWING NO. 20730-2)COMPACTEDBACKFILLSERVICE INVERTNO LOWER THANSPRING LINE OFSEWER MAIN FORWYE FITTINGSSEWER MAININ-LINE WYEFITTINGS FORNEWINSTALLATIONS.45° ELBOWPLUG2"x2" WOODMARKERSERVICE LINE: SLOPE =1/4" PER FOOT MIN.1/2" PER FOOT MAXPROPERTY LINE OREASEMENT LINEGROUNDSURFACEGREEN STEEL POST ATEND OF SERVICESERVICE PIPETYPE 2 PIPE BEDDING WHEREREQUIRED FOR SOFT ORUNSTABLE FOUNDATIONTYPE 1 PIPE BEDDING PLACED IN6" MAX. LAYERS AND COMPACTEDTHOROUGHLYSELECT TYPE 1 BEDDING MATERIALPLACED IN 6" LAYERS ANDCOMPACTED THOROUGHLYNOTE: SLOPING, BENCHING ORSUPPORT SYSTEMS SHALLCONFORM W/ O.S.H.A. CONSTR.STANDARDS FOR EXCAVATIONS.MOUND TRENCH W/ 6" NATIVETOPSOIL OR SUBGRADE PREP.AS REQ'DTYPE 'A' OR 'B' TRENCHBACKFILL AS PER PLANSTRENCH WIDTH = SEE SCHEDULEINSTALL DETECTABLEWARNING TAPE1.5' MAX DEPTH(SEWER)MINIMUM DEPTH COVER6"4"SEE SCHEDULENOTES:1.SEE O.S.H.A. CONSTRUCTION STANDARDS FOR EXCAVATIONS.2.TYPE 1 PIPE BEDDING SHALL BE GRAVEL, GRAVEL-SAND, OR SAND. THE MATERIALSHALL BE WELL GRADED AND SHALL CONFORM TO THE SOIL TYPE GW (GRAVEL, WELLGRADED) OR SW (SAND, WELL GRADED) OF THE UNIFIED SOIL CLASSIFICATION SYSTEM(USCS). THE MAXIMUM SIZE GRAVEL SHALL BE 34 IN. TYPE 1 BEDDING CONSISTS OF MIN4", OR 18 THE OUTSIDE DIAMETER OF THE PIPE, WHICHEVER IS GREATER, UNDER THEPIPE AND A MIN. OF 6" ABOVE THE PIPE. PLACE IN MAX. LIFTS OF 6" USING HAND OROTHER COMPACTION METHODS W/O DAMAGING OR DISTURBING THE PIPE.THOROUGHLY COMPACT EACH LAYER.3.TYPE "B" BACKFILL - PLACE BACKFILL IN MAXIMUM 8" LIFTS WITHIN 3% OPTIMUMMOISTURE CONTENT, AND COMPACT TO AT LEAST 90% OF MAXIMUM DENSITY ASDETERMINED BY AASHTO T99 OR BY ASTM D698.4.TYPE 'A' BACKFILL: PLACE TRENCH BACKFILL IN MAX. 8" COMPACTED LIFTS W/IN 3% OFOPTIMUM MOISTURE CONTENT, AND COMPACT TO AT LEAST 95% OF MAX. DRY DENSITYDETERMINED BY AASHTO T99 OR BY ASTM D698.5.SLOPING, BENCHING OR SUPPORT SYSTEMS SHALL CONFORM WITH O.S.H.A.CONSTRUCTION STANDARDS FOR EXCAVATIONS.HIGH DENSITY RIGID FOAMINSULATION BOARD AS NEEDEDSCALE: N.T.S.5048" Ø MANHOLE (CoBOZEMAN DRAWING NO. 02720-3)NOTES:1.SLOPE ALL SHELVES TO CHANNEL AT 1" PER FOOT.2.ALL JOINTS BETWEEN MANHOLE SECTIONS, MANHOLE RING & TOP SECTION, AND AROUND SEWER PIPE INTO MANHOLE SHALL BE WATERTIGHT. JOINTINGMATERIAL SHALL BE "RAM-NEK" OR EQUAL FOR ALL JOINTS EXCEPT BETWEEN SEWER PIPE AND MANHOLE WALL.3.MANHOLES SHALL BE TESTED FOR WATERTIGHTNESS IN ACCORDANCE WITH DEQ CIRCULAR 2, SECTION 34.7. ONE OPTION IS TO VACUUM TEST THEMANHOLES PER ASTM C1244.CHANNEL = DIA. OF PIPEAAINV. ININV. OUTRIM ELEV.SLOPE AT 1" PER FOOTCHANNEL TO FULLPIPE DEPTHSECTION A-AFRAME AND COVER5.0" (TYP.)PRECAST REINFORCEDCONCRETE MANHOLE RISERAND ECCENTRIC CONE TOPMANUFACTURED INACCORDANCE WITH ASTMDESIGNATION C-478.SHELF-SLOPE 1"PER FOOTTOWARDCHANNEL.SEE SECTION A-A#4 BARS - 1'-0" c-cPRECAST OR CAST-IN-PLACE BASE. POURED-IN-PLACEBASE, MINIMUM CONCRETE THICKNESS BELOW PIPE IS8 INCHES. PRECAST BASE, MINIMUM THICKNESS IS 6INCHES. ALL BASES REINFORCED AS SHOWN.FLEXIBLE GASKETEDJOINT (TYPICAL FORRECAST BASES - SEEJOINT DETAIL)JOINT DETAIL℄MANHOLE STEPSAT 16" CENTERS12" MAX (TYP FORCAST-IN-PLACE BASES)GROUT INVERT TO SPRINGLINE OFPIPE IF GAP BETWEEN PIPE ANDCHANNEL IS GREATER THAN 18"CHANNELFLOWLINEMANHOLE BASEVARIES 4'2'7"ADJUSTABLE RINGS,2" MIN., 12" MAX48" MANHOLE: 48" DIA. MINSCALE: N.T.S.53MAIN SEPERATIONNOTES:1.NO EXCEPTION TO THE MIN. SEPARATION REQUIREMENTS (VERT. OR HOR.) ISPERMITTED WHEN THE SEWAGE CARRYING PIPE IS A FORCE MAIN. ALL CROSSINGSSHALL BE ARRANGED SO THAT THE SEWER MAIN OR SEWER FORCE MAIN JOINTS WILLBE EQUIDISTANT AND AS FAR AS POSSIBLE FROM THE WATER MAIN BEING CROSSED.2.WHERE LESS THAN MINIMUM VERTICAL SEPARATION HAS BEEN APPROVED, THE NEWGRAVITY SEWER MAIN, OR THE NEW WATER MAIN, AT THE CROSSING SHALL BE MADEFROM A FULL LENGTH OF PIPE CENTERED ON THE CROSSING, AND THE CROSSINGANGLE SHALL BE APPROXIMATELY 90°. NEW GRAVITY SEWER MAINS CROSSING WITHIN18" OF A NEW OR EXISTING WATER MAIN MUST ALSO MEET OR EXCEED THEREQUIREMENTS OF "RECOMMENDED PRACTICE FOR LOW-PRESSURE AIR TESTING OFINSTALLED SEWER PIPE" (UNI-8-90, OR LATEST VERSION).3."L" IS THE LONGEST AVAILABLE STANDARD LENGTH OF PIPE AS SUPPLIED BY A PIPEMANUFACTURER.4.ADEQUATE STRUCTURAL SUPPORT FOR PIPES AT CROSSINGS SHALL BE PROVIDED.WATER ORSEWERMAINWATER ORSEWER MAINEXISTINGPIPEEXISTINGPIPENEW PIPEMIN.SEPARATIONDIST. = 10'VERTICALSEPERATION = 18"NEW PIPELCROSSINGSPARALLEL ARRANGEMENTL/2VERTICALSEPERATION = 18"NO VERTICAL SEPARATION REQ'DL/2LIF OVERALL DEPTH IS LESSTHAN 5', FORGO CONESECTION & INSTALL FLAT TOPCONCRETE LIDTOP OF PIPE MAY NOTEXTEND PAST INSIDEWALL OF MANHOL. ISNECESSARY TOP HALF OFPIPE MAY BE TRIMMEDOFF SMOOTH (8" Ø ONLY)4'2.5'C2.10AS NOTEDHEC Mar 08, 2022 - 3:13pmCAD FILE: M:\193211\Drawings\Construction Drawings\C2.10 - SSWR DETAILS.dwg REVISIONSDATEPROJECT NUMBERHYALITE Engineers, PLLC2304 N 7th Ave. Ste. LBozeman, MT 59715Tel: (406) 587.2781w w w . hyaliteeng. comFax: (406) 522.92252018PARKVIEW CROSSINGS BOZEMAN, MTCAMPECHE SHORES DEVELOPMENT, LLCMARCH 8, 2022193211CONSTRUCTION DRAWINGS - 22x34 originals INFRASTRUCTURE IMPROVEMENTSSCALESHEET TITLEDESIGN BYP.O. BOX 3088GALVESTON, TXAS NOTEDBVSEWER DETAILS HIGH DENSITY RIGID FOAM INSULATION1" = 1' BURY DEPTH, 4' WIDE SHEETSPARTDETAILSTYPICAL INSULATION SCHEDULE56PARTDESCRIPTION248" Ø MANHOLE48" Ø CONCRETE MANHOLEASTM C-478DAMP PROOFING2 COATS PER MANHOLE, CS-55 OR MASTERLIFE 300D ADMIX.CONCRETE GRADE RINGSASTM C-478FRAMEEJIW 3772COVEREJIW 3771 ( WITH CoB LOGO)JOINT SEALANTASTM C-990MANHOLE DETAILCoBOZEMAN MOD'S TO MPWSS, DRAWING NO. 02720-3PRECAST MANHOLE BASESMPWSS, 2010 STANDARD DRAWING NO. 02720-6TYPICAL MANHOLE CHANNEL DETAILSMPWSS, 2010 STANDARD DRAWING NO. 02720-7STANDARD CAST IRON COVERCoBOZEMAN MOD'S TO MPWSS, DRAWING NO. 02720-2STANDARD 24" CAST IRON RINGCoBOZEMAN MOD'S TO MPWSS, DRAWING NO. 02720-2NOTES:PARTDESCRIPTION52SEWER SERVICEFITTINGS & PIPESCH. 40MINIMUM DEPTH OF COVER4'INSULATION1" = 1'RESIDENTIAL SERVICE PIPE4" ØDISTANCE FROM PROPERTY LINE8'SANITARY SEWER SERVICE LINECoBOZEMAN MOD'S TO MPWSS, DRAWING NO. 02730-2NOTES:PARTDESCRIPTION51UTILITY TRENCHTRENCH WIDTHOUTSIDE Ø OF PIPE(S) + 3'PIPE BEDDING MATERIALTYPE 1MINIMUM DEPTH OF COVER4'INSULATION1" = 1'DETECTABLE WARNING TAPE DEPTH1.5' MINIMUM, 2' MAXIMUM BELOW GROUND SURFACEHORIZ. SEPERATION DIST. FROM WATER10' MINIMUMVERTICAL SEPERATION DISTANCE1.5' MINIMUMNOTES:C2.11AS NOTEDHEC Mar 08, 2022 - 3:14pmCAD FILE: M:\193211\Drawings\Construction Drawings\C2.10 - SSWR DETAILS.dwg REVISIONSDATEPROJECT NUMBERHYALITE Engineers, PLLC2304 N 7th Ave. Ste. LBozeman, MT 59715Tel: (406) 587.2781w w w . hyaliteeng. comFax: (406) 522.92252018PARKVIEW CROSSINGS BOZEMAN, MTCAMPECHE SHORES DEVELOPMENT, LLCMARCH 8, 2022193211CONSTRUCTION DRAWINGS - 22x34 originals INFRASTRUCTURE IMPROVEMENTSSCALESHEET TITLEDESIGN BYP.O. BOX 3088GALVESTON, TXAS NOTEDBVSEWER DETAILS (CONT.) STSTSTSTSTSTSTST STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTLOT 1ALOT 1BLOT 1CLOT 1DLOT 9ALOT 8CLOT 9BLOT 7CLOT 8DLOT 9DLOT 7DLOT 8BLOT 6BLOT 7BLOT 6ALOT 7ALOT 6DLOT 6CLOT 9CLOT 8ALOT 3CLOT 3BLOT 3DLOT 5ALOT 1ALOT 1BLOT 1CLOT 2ALOT 4CLOT 4BLOT 4ALOT 4DLOT 5BLOT 5CLOT 5DLOT 2BLOT 3ALOT 1DLOT 2ALOT 1BLOT 1CLOT 2BLOT 2CLOT 1ACA 18''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S 8''S 8''S 8''S 8''S 8''S 8''S 8''S 8''S 8''S8''S8''S8''S8''SSSSSSSSS8''S8''S8''S8'' S SSS8''SSSSGASGASGA SS8'' S 8'' S 8'' S 8'' S 8'' S 8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''WHYD8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''WHYDHYDHYD8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''WHYDHYD100+00101+00102+00 103+00104+00105+00106+00107+000+001+002+003+004+005+006+007+008+009+0010+001 1 + 0 0 1 2 + 0 0 1 3 + 0 0 1 4 + 0 0 1 4 + 4 8 4715471047104705HEC Mar 08, 2022 - 3:14pmCAD FILE: M:\193211\Drawings\Construction Drawings\C3.0 WATER.dwg REVISIONSDATEPROJECT NUMBERHYALITE Engineers, PLLC2304 N 7th Ave. Ste. LBozeman, MT 59715Tel: (406) 587.2781w w w . hyaliteeng. comFax: (406) 522.92252018PARKVIEW CROSSINGS BOZEMAN, MTCAMPECHE SHORES DEVELOPMENT, LLCMARCH 8, 2022193211CONSTRUCTION DRAWINGS - 22x34 originals INFRASTRUCTURE IMPROVEMENTSSCALESHEET TITLEDESIGN BYP.O. BOX 3088GALVESTON, TXAS NOTEDBV0'60'120'180'OVERALL WATER PLANC3.0CONNECT TO EXTG.8" WATER MAIN1.ALSO SEE NOTES ON SHEET G1.1.2.PROTECT IN PLACE ALL EXISTING UTILITIES UNLESS NOTED OTHERWISE. IF CONFLICT EXISTS,NOTIFY THE ENGINEER IMMEDIATELY.3.EXISTING VEGETATION OUTSIDE OF ROADWAY CUT FILL SLOPES MUST BE PROTECTED.EXISTING VEGETATION WITHIN THE NEW ROADWAY PRISM IS TO BE REMOVED AND DISPOSED OFBY THE CONTRACTOR.4.WHERE LOT DIMENSIONS ALLOW, WATER SERVICES ARE TO BE LOCATED AT THE CENTER OFTHE LOT (OTHERWISE LOCATED AS SHOWN). ALL WATER SERVICE SHALL END 8' INSIDE OF THEPROPERTY LINE.5.EACH PIPE JOINT MUST HAVE 3 BRASS OR BRONZE CONDUCTIVE WEDGES INSTALLED.6.JOINT DEFLECTION OF 8" DI PIPE IS ALLOWED UP TO 5°.GENERAL WATER NOTESCONNECT TO EXTG.8" WATER MAINPROPOSED 8"GATEVALVE (TYP.)PROPOSED FIREHYDRANT (TYP.)PROPOSED 1" WATERSERVICE (TYP.)LOOPALIGNMENTALLEYALIGNMENTTSCHACHE LANEVAQUERO PARKWAYROAD APROPOSED 8" CLASS 51 DUCTILEIRON WATER MAIN (TYP.) 46804690470047104720468046904700471047200+004705.24705.64696.711+004706.14697.244706.94698.542+004707.74699.804708.53+004709.24709.64+004709.94710.15+004710.4 4710.66+004710.9 4711.17+004711.4 4711.68+004712.0 4712.39+004712.7 4713.110+004713.4 4713.811+004714.0 4713.712+004713.2 4712.913+004712.8 4712.114+00DRY UTILITY CONDUITS (TYP.)INSTALL PER NWE STANDARDSSTA. 0+56.11 (11.89')CONNECT TO EXTG. 8" WATERSTUB W/ 8" GATE VALVE & VBINV. ELEV.= 4696.23'STA. 1+36.57 (5.53')INSTALL 8" DIA. GATE VALVE &VB W/ MJ RESTRAINTSINV. ELEV.= 4697.09'STA. 1+61.24 (5.47')INSTALL 8"x8"x8" DI TEEW/ MJ RESTRAINTSINV. ELEV.= 4697.37'STA. 1+83.42 (5.49')INSTALL 8" DIA. GATE VALVE &VB W/ MJ RESTRAINTSINV. ELEV.= 4698.06'STA. 2+42.73 (5.49')INSTALL 8"x8"x6" DI TEEW/ MJ RESTRAINTS &25 LF FH LEAD TO THE SOUTHINV. ELEV.= 4699.80' STA. 10+61.54 (-5.50') INSTALL 8"x8"x6" DI TEE W/ MJ RESTRAINTS & 9 LF FH LEAD TO THE NORTH INV. ELEV.= 4705.76' STA. 11+51.32 (-5.49') INSTALL 8" DIA. GATE VALVE & VB W/ MJ RESTRAINTS INV. ELEV.= 4705.62' STA. 11+60.97 (-5.51') INSTALL 8"x8"x8" DI TEE W/ MJ RESTRAINTS INV. ELEV.= 4705.60' STA. 11+81.29 (-5.82') INSTALL 8" DIA. GATE VALVE & VB W/ MJ RESTRAINTS INV. ELEV.= 4705.57' STA. 12+71.70 (-7.23') CONNECT TO EXTG. 8" WATER STUB W/ 8" GATE VALVE & VB INV. ELEV.= 4705.41'7.5' HYD7.5' HYDINSTALL 432 LF OF 8"Ø CLASS 51 DI WATER MAININCLUDE CORROSION PROTECTION (V-BIOPOLYETHYLENE OR EQUIVALENT)STA. 0+67.5512"Ø A2000 PVC PIPEINV. ELEV.= 4702.57STA. 11+73.048"Ø SDR 35 PVC PIPEINV. ELEV.= 4703.3418" MIN.SEPARATION6.5' MIN.BURY(TYP.)STA. 0+61.26 (12.02')INSTALL 22.5° DI BENDW/ MJ RESTRAINTSINV ELEV. = 4696.29'STA. 0+79.04 (5.14')INSTALL 22.5° DI BENDW/ MJ RESTRAINTSINV ELEV. = 4696.49'STSTSTSTSTSTSTSTSTSTSTST ST ST ST STSTSTSTSTSTSTSTSTST STSTSTSTSTBLOCK 2 BLOCK 1 BLOCK 3 LOT 1A LOT 1B LOT 1C LOT 1DLOT 9ALOT 8C LOT 9B LO T 7C LOT 8D LOT 9D LO T 7D LO T 8B LO T 6B LO T 7B LO T 6A LO T 7A LO T 6D LO T 6C LOT 9C LO T 8A LO T 3C LO T 3B LO T 3D LO T 5A LOT 1ALOT 1BLOT 1CLOT 2A LO T 4C LO T 4B LO T 4A LO T 4D LO T 5B LO T 5C LO T 5D LOT 2BLOT 3A LOT 1D LO T 2A LO T 1B LO T 1C LO T 2B LO T 2C LO T 1A CA 18''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S S S S S S S 8''S8''S8''S8''S8''S S S S8''SS S S 0+001+002+003+004+005+006+007+008+009+0010+0011+00 12+00 13+00 14+00SVC @ STA.0+92.16' (38.00')SVC @ STA.1+33.54' (38.00')SVC @ STA.1+72.06' (38.00')SVC @ STA.2+51.62' (38.00')SVC @ STA.10+56.23' (38.00')SVC @ STA.10+92.10' (38.00')SVC @ STA.11+26.10' (38.00')SVC @ STA.11+62.09' (38.00')SVC @ STA.12+09.58' (38.00')SVC @ STA.12+44.10' (38.00')8''W8''W8''W8''W8''W8''W 8''W 8''W HY D 8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W HYD8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''WHY D HYD 0'50'100'150'SCALE1" = 50' HORIZ.1" = 5' VERT.LOOP WATER P&PSTA. 0+00 TO STA. 14+00AS NOTEDFINISHED GRND. ELEV. @ ℄ PIPE INVERT ELEV. @ ℄LOOP WATER P&PC3.1HEC Mar 08, 2022 - 3:14pmCAD FILE: M:\193211\Drawings\Construction Drawings\C3.1 WATER P&P.dwg REVISIONSDATEPROJECT NUMBERHYALITE Engineers, PLLC2304 N 7th Ave. Ste. LBozeman, MT 59715Tel: (406) 587.2781w w w . hyaliteeng. comFax: (406) 522.92252018PARKVIEW CROSSINGS BOZEMAN, MTCAMPECHE SHORES DEVELOPMENT, LLCMARCH 8, 2022193211CONSTRUCTION DRAWINGS - 22x34 originals INFRASTRUCTURE IMPROVEMENTSSCALESHEET TITLEDESIGN BYP.O. BOX 3088GALVESTON, TXAS NOTEDBVSAW CUTEXISTINGASPHALT(TYP.)LOOPALIGNMENTALLEYALIGNMENTINSTALL 8" DI END CAPW/ MJ RESTRAINTSINSTALL 8" DI END CAPW/ MJ RESTRAINTSSTA. 2+46.04 (-19.50')INSTALL HYDRANTPER DET. 53/C3.10BURY LINE ELEV. = 4708.9STA. 10+61.56 (-19.50')INSTALL HYDRANTPER DET. 53/C3.10BURY LINE ELEV. = 4708.9REQUIRED JOINT RESTRAINT LENGTH BY DEPTH OF COVERFITTING6.5'7.0'7.5'8.0'22.5° HORIZ. BEND4'3'3'3'VALVE / END CAP29'28'27'26'*FOR TEE FITTINGS, LENGTH ALONG RUN MUST BE ATLEAST 8' INEITHER DIRECTION 468046904700471047204680469047004710472097+0098+0099+00100+004706.54697.874707.14698.51101+004707.74699.154708.1 4699.79102+004708.4 4700.27 4708.6 4700.63103+004708.9 4701.05 4709.2 4701.71104+004710.0 4702.38 4711.0 4703.05105+004712.0 4703.75 4713.0 4704.45106+004713.9 4705.15 4713.8107+00108+00109+00110+00111+00INSTALL 680 LF OF 8"Ø CLASS 51 DI WATER MAIN.INCLUDE CORROSION PROTECTION (V-BIOPOLYETHYLENE OR EQUIVALENT)℄ ROAD ASTA. 1+61.24 (5.47')INSTALL 8"x8"x8" DI TEEW/ MJ RESTRAINTSINV. ELEV.= 4697.37'STA. 1+65.26 (-30.14')INSTALL 8" DIA. GATE VALVE &VB W/ MJ RESTRAINTSINV. ELEV.= 4697.85' STA. 102+22.16 (7.99') INSTALL 11.25° DI BEND W/ MJ RESTRAINTS INV ELEV. = 4700.07' STA. 103+16.39 (7.10') INSTALL 11.25° BEND W/ MJ RESTRAINTS INV ELEV. = 4700.74' STA. 6+67.24 (-132.35') INSTALL 8" DIA. GATE VALVE & VB W/ MJ RESTRAINTS INV. ELEV.= 4700.99' STA. 105+06.26 (6.85') INSTALL 11.25° DI BEND W/ MJ RESTRAINTS INV ELEV. = 4703.13' STA. 106+66.25 (5.49') INSTALL 8" DIA. GATE VALVE & VB W/ MJ RESTRAINTS INV. ELEV.= 4705.38' STA. 11+60.97 (-5.51') INSTALL 8"x8"x8" DI TEE W/ MJ RESTRAINTS INV. ELEV.= 4705.60' ℄ ROAD ASTA. 100+32.1015"Ø A2000 PVC PIPEINV. ELEV.= 4702.986.5' MIN.BURY(TYP.)STA. 103+60.20 (6.60') INSTALL 8"x8"x6" DI TEE W/ MJ RESTRAINTS & 18 LF FH LEAD TO THE EAST INV ELEV. = 4701.18'7.5' HYDSTSTSTSTSTSTSTSTSTSTSTST ST ST ST STSTSTSTSTSTSTSTST STSTSTSTSTSTBLOCK 2 BLOCK 1 BLOCK 3 LOT 1A LOT 1B LOT 1C LOT 1DLOT 9A LO T 8C LOT 9B LO T 7C LO T 8D LOT 9D LO T 7D LO T 8B LO T 6B LO T 7B LO T 6A LO T 7A LO T 6D LO T 6C LOT 9C LO T 8A LO T 3C LO T 3B LO T 3D LO T 5A LOT 1ALOT 1BLOT 1CLOT 2A LO T 4C LO T 4B LO T 4A LO T 4D LO T 5B LO T 5C LO T 5D LO T 2B LO T 3A LOT 1D LO T 2A LO T 1B LO T 1C LO T 2B LO T 2C LO T 1A CA 18''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S S S S S S S 8''S8''S8''S8''S8''S S S S8''SS S S SVC @ STA.100+69.73' (-23.00')SVC @ STA.101+12.26' (-23.00')SVC @ STA.101+44.41' (-23.00')SVC @ STA.10 1 + 7 4 . 8 4 ' ( - 2 3 . 0 0 ' ) SV C @ S T A . 1 0 2 + 2 8 . 5 3 ' ( - 2 3 . 0 0 ' ) SV C @ S T A . 1 0 2 + 7 1 . 4 2 ' ( - 2 3 . 0 0 ' ) SV C @ S T A . 1 0 3 + 0 2 . 3 0 ' ( - 2 3 . 0 0 ' )100+00101+00102+00103+00104+00105+00106+00107+00SV C @ S T A . 1 0 3 + 3 4 . 7 7 ' ( - 2 3 . 0 0 ' ) SV C @ S T A . 1 0 4 + 0 0 . 8 4 ' ( - 2 3 . 0 0 ' ) SV C @ S T A . 1 0 4 + 3 0 . 9 0 ' ( - 2 3 . 0 0 ' ) SV C @ S T A . 1 0 4 + 6 0 . 9 6 ' ( - 2 3 . 0 0 ' ) SV C @ S T A . 1 0 4 + 9 1 . 1 4 ' ( - 2 3 . 0 0 ' ) SV C @ S T A . 1 0 5 + 4 6 . 5 1 ' ( - 2 3 . 0 0 ' ) SV C @ S T A . 1 0 5 + 7 6 . 3 1 ' ( - 2 3 . 0 0 ' ) SV C @ S T A . 1 0 6 + 0 7 . 2 7 ' ( - 2 3 . 0 0 ' ) SV C @ S T A . 1 0 6 + 3 4 . 5 3 ' ( - 2 3 . 0 0 ' ) SVC @ S T A . 1 0 6 + 3 7 . 7 8 ' ( 2 3 . 0 0 ' ) SVC @ S T A . 1 0 6 + 0 7 . 7 8 ' ( 2 3 . 0 0 ' ) SVC @ S T A . 1 0 5 + 7 7 . 7 8 ' ( 2 3 . 0 0 ' ) SVC @ S T A . 1 0 5 + 4 7 . 7 8 ' ( 2 3 . 0 0 ' ) SVC @ S T A . 1 0 5 + 0 3 . 8 2 ' ( 2 3 . 0 0 ' ) SVC @ S T A . 1 0 4 + 8 6 . 4 0 ' ( 2 3 . 0 0 ' ) SVC @ S T A . 1 0 4 + 5 6 . 3 9 ' ( 2 3 . 0 0 ' ) SVC @ S T A . 1 0 4 + 2 6 . 3 8 ' ( 2 3 . 0 0 ' ) SVC @ S T A . 1 0 3 + 6 5 . 2 9 ' ( 2 3 . 0 0 ' ) SVC @ S T A . 1 0 3 + 3 5 . 2 8 ' ( 2 3 . 0 0 ' ) SVC @ S T A . 1 0 3 + 0 6 . 5 5 ' ( 2 3 . 0 0 ' ) SVC @ S T A . 1 0 2 + 7 8 . 6 5 ' ( 2 3 . 0 0 ' ) SVC @ S T A . 1 0 2 + 4 9 . 0 3 ' ( 2 3 . 0 0 ' ) SVC @ STA.102+22.9 5 ' ( 2 3 . 0 0 ' ) SVC @ STA.101+93.96' (23.00')SVC @ STA.101+64.46' (23.00')SVC @ STA.101+34.57' (23.00')SVC @ STA.100+74.19' (23.00')8''W8''W8''W8''W8''W8''W 8''W 8''W HY D 8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8' 'W8''W8''W8''W8''W8''W8''W HYD8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''WHY D HYD 0'50'100'150'SCALE1" = 50' HORIZ.1" = 5' VERT.ALLEY WATER P&PSTA. 97+00 TO STA. 111+00AS NOTEDFINISHED GRND. ELEV. @ ℄ PIPE INVERT ELEV. @ ℄ALLEY WATER P&PC3.2HEC Mar 08, 2022 - 3:14pmCAD FILE: M:\193211\Drawings\Construction Drawings\C3.1 WATER P&P.dwg REVISIONSDATEPROJECT NUMBERHYALITE Engineers, PLLC2304 N 7th Ave. Ste. LBozeman, MT 59715Tel: (406) 587.2781w w w . hyaliteeng. comFax: (406) 522.92252018PARKVIEW CROSSINGS BOZEMAN, MTCAMPECHE SHORES DEVELOPMENT, LLCMARCH 8, 2022193211CONSTRUCTION DRAWINGS - 22x34 originals INFRASTRUCTURE IMPROVEMENTSSCALESHEET TITLEDESIGN BYP.O. BOX 3088GALVESTON, TXAS NOTEDBVLOOPALIGNMENTALLEYALIGNMENTREQUIRED JOINT RESTRAINT LENGTH BY DEPTH OF COVERFITTING6.5'7.0'7.5'8.0'22.5° HORIZ. BEND4'3'3'3'VALVE / END CAP29'28'27'26'*FOR TEE FITTINGS, LENGTH ALONG RUN MUST BE ATLEAST 8' INEITHER DIRECTION SCALE: N.T.S.51UTILITY TRENCHSCALE: N.T.S.54CORPORATION STOP (CoB DRAWING # 02660-6)SCALE: N.T.S.53FIRE HYDRANT (CoB DRAWING NO. 02660-4)SCALE: N.T.S.52WATER SERVICE (CoB DRAWING NO. 02660-6)SCALE: N.T.S.56GATE VALVETYPE 2 PIPE BEDDING WHEREREQUIRED FOR SOFT ORUNSTABLE FOUNDATIONTYPE 1 PIPE BEDDING PLACED IN6" MAX. LAYERS AND COMPACTEDTHOROUGHLYSELECT TYPE 1 BEDDING MATERIALPLACED IN 6" LAYERS ANDCOMPACTED THOROUGHLYNOTE: SLOPING, BENCHING ORSUPPORT SYSTEMS SHALLCONFORM WITH O.S.H.A. CONSTR.STANDARDS FOR EXCAVATIONS.MOUND TRENCH W/ 6" NATIVETOPSOIL OR SUBGRADE PREP.AS REQ'DTYPE 'A' OR 'B' TRENCHBACKFILL AS PER PLANSTRENCH WIDTH = SEE SCHEDULEINSTALL DETECTABLEWARNING TAPEPER SCHEDULE(WATER)MINIMUMDEPTH COVER6"4"SEE SCHEDULENOTES:1.SEE O.S.H.A. CONSTRUCTION STANDARDS FOR EXCAVATIONS.2.TYPE 1 PIPE BEDDING SHALL BE GRAVEL, GRAVEL-SAND, OR SAND. THE MATERIALSHALL BE WELL GRADED AND SHALL CONFORM TO THE SOIL TYPE GW (GRAVEL, WELLGRADED) OR SW (SAND, WELL GRADED) OF THE UNIFIED SOIL CLASSIFICATION SYSTEM(USCS). THE MAXIMUM SIZE GRAVEL SHALL BE 34 IN. TYPE 1 BEDDING CONSISTS OF MIN4", OR 18 THE OUTSIDE DIAMETER OF THE PIPE, WHICHEVER IS GREATER, UNDER THEPIPE AND A MIN. OF 6" ABOVE THE PIPE. PLACE IN MAX. LIFTS OF 6" USING HAND OROTHER COMPACTION METHODS W/O DAMAGING OR DISTURBING THE PIPE.THOROUGHLY COMPACT EACH LAYER.3.TYPE "B" BACKFILL - PLACE BACKFILL IN MAXIMUM 8" LIFTS WITHIN 3% OPTIMUMMOISTER CONTENT, AND COMPACT TO AT LEAST 90% OF MAXIMUM DENSITY ASDETERMINED BY AZE ASHTO T99 OR BY ASTM D698.4.TYPE 'A' BACKFILL: PLACE TRENCH BACKFILL IN MAX. 8" COMPACTED LIFTS W/IN 3% OFOPTIMUM MOISTURE CONTENT, AND COMPACT TO AT LEAST 95% OF MAX. DRY DENSITYDETERMINED BY AASHTO T99 OR BY ASTM D698.5.SLOPING, BENCHING OR SUPPORT SYSTEMS SHALL CONFORM WITH O.S.H.A.CONSTRUCTION STANDARDS FOR EXCAVATIONS.HIGH DENSITY RIGID FOAMINSULATION BOARD (IF REQ'D)CURB STOP VALVE. PROVIDE THENECESSARY TRANSITIONFITTINGS FROM SERVICE PIPE TOF.I.P. THREADSSEE CORPORATIONSTOP DETAILTAP BYCONTRACTORWATER MAINGROUND SURFACE8' FROMPROPERTYLINE ORBASEMENT6.5' MIN COVERPROPERTY OREASEMENT LINE4'CORPORATION STOPSERVICE SADDLESELECT MATERIALBACKFILL AREA (SEESPECIFICATIONS ONBACKFILL FORAPPURTENANCES)TRENCH BOTTOMWATER SERVICEPIPE1234NOTES:1.ADJUST WATER VALVES UPWARD OR DOWNWARD AS REQ'D.2.ADJUSTABLE SCREW-TYPE RISERS MAY BE USED TO RAISE OR ADJUST EXISTING VALVEBOXES ONLY.COMPACTED BASE &SUBGRADETRAFFIC BOX W/ CAST IRONFRAME & COVER LID SHALLREAD "WATER"CRUSHED ROCKGATE VALVEREBAR ANCHORNOTES:1.COAT ANCHOR REBAR WITH 'KOPPERS' BITUMASTIC #50 COATING OR EQUAL THRUSTBLOCKING & ANCHORS ARE REQ'D ON ALL VALVES. COMPACT SUBGRADE TO 95% MAX.DRY DENSITY2.INSTEAD OF CONCRETE THRUST BLOCKS, THRUST RESTRAINT MAY BE PROVIDEDUTILIZING MEGALUG PER CoBOZEMAN MODIFICATIONS TO THE MPWSS6"6"1/8" MIN., 1/4" MAX.'C''A'CURB BOX WITH 5'STATIONARY RODBASE MATERIALNEW HYDRANT, MUELLERSUPER CENTURION 250 ORWATEROUS PACERPUMPER NOZZLE TO FACEROADWAY UNLESSDIRECTED OTHERWISEADJUSTABLE SCREW TYPEVALVE BOX WITH LIDELEV. ASSHOWN ONPLANS OR 0.2'ABOVE TBCCONC.THRUSTBLOCK MIN.2 SQ FTBEARINGSURFACEMIN. 0.5CUBIC YARDWASHEDGRAVELCONC,THRUSTBLOCKAWWA TEE ORTAPPINGSLEEVE ONWATER MAINNOTES:1.MEGA-LUG OR APPROVED EQUAL JOINT RESTRAINTS MAY BE USED INSTEAD OFCONCRETE THRUST BLOCK.2.HYDRANT WEEP HOLES TO REMAIN UNOBSTRUCTED. INSTALL PLUMB W/ MIN. 4'-0"CLEAR ALL AROUND (TREES, HEDGES, BUSHES, ETC.)WATERMAINUNDISTURBED EARTHNEW 6" AUXILIARYGATE VALVEMIN. COVER6.5'WATERSERVICE LINESCALE: N.T.S.55MAIN SEPARATIONNOTES:1.NO EXCEPTION TO THE MIN. SEPARATION REQUIREMENTS (VERT. OR HOR.) ISPERMITTED WHEN THE SEWAGE CARRYING PIPE IS A FORCE MAIN. ALL CROSSINGSSHALL BE ARRANGED SO THAT THE SEWER MAIN OR SEWER FORCE MAIN JOINTS WILLBE EQUIDISTANT AND AS FAR AS POSSIBLE FROM THE WATER MAIN BEING CROSSED.2.WHERE LESS THAN MINIMUM VERTICAL SEPARATION HAS BEEN APPROVED, THE NEWGRAVITY SEWER MAIN, OR THE NEW WATER MAIN, AT THE CROSSING SHALL BE MADEFROM A FULL LENGTH OF PIPE CENTERED ON THE CROSSING, AND THE CROSSINGANGLE SHALL BE APPROXIMATELY 90°. NEW GRAVITY SEWER MAINS CROSSING WITHIN18" OF A NEW OR EXISTING WATER MAIN MUST ALSO MEET OR EXCEED THEREQUIREMENTS OF "RECOMMENDED PRACTICE FOR LOW-PRESSURE AIR TESTING OFINSTALLED SEWER PIPE" (UNI-8-90, OR LATEST VERSION).3."L" IS THE LONGEST AVAILABLE STANDARD LENGTH OF PIPE AS SUPPLIED BY A PIPEMANUFACTURER.4.ADEQUATE STRUCTURAL SUPPORT FOR PIPES AT CROSSINGS SHALL BE PROVIDED.WATER ORSEWERMAINWATER ORSEWER MAINEXISTINGPIPEEXISTINGPIPENEW PIPEMIN.SEPARATIONDIST. = 10'VERTICALSEPERATION = 18"NEW PIPELCROSSINGSPARALLEL ARRANGEMENTL/2VERTICALSEPERATION = 18"NO VERTICAL SEPARATION REQ'DL/2LSTEEL POST MARKERPAINTED BLUECURB BOX2.5'NOTES:1.NO COUPLINGS OR OTHER JOINTS ALLOWED ON SERVICE PIPE FROM CORP STOP TOCURB STOM FOR 34" AND 1" SERVICES.2.STRAIGHT COPPER PIPE SHALL BE USED FOR 1 12" AND 2" DERVICESC3.10AS NOTEDHEC Mar 08, 2022 - 3:14pmCAD FILE: M:\193211\Drawings\Construction Drawings\C3.10-WATR DETAILS.dwg REVISIONSDATEPROJECT NUMBERHYALITE Engineers, PLLC2304 N 7th Ave. Ste. LBozeman, MT 59715Tel: (406) 587.2781w w w . hyaliteeng. comFax: (406) 522.92252018PARKVIEW CROSSINGS BOZEMAN, MTCAMPECHE SHORES DEVELOPMENT, LLCMARCH 8, 2022193211CONSTRUCTION DRAWINGS - 22x34 originals INFRASTRUCTURE IMPROVEMENTSSCALESHEET TITLEDESIGN BYP.O. BOX 3088GALVESTON, TXAS NOTEDBVWATER DETAILS PARTDESCRIPTION53FIRE HYDRANTFIRE HYDRANTFIRE HYDRANT LEAD PIPEGATE VALVE & VALVE BOXFIRE HYDRANT SPECFIRE HYDRANT LOCATION SPECNOTES:CoBOZEMAN MOD'S TO MPWSS, DRAWING NO. 02660-05CoBOZEMAN MOD'S TO MPWSS, DRAWING NO. 02660-046" GATE VALVE W/ VALVE BOX6" DI CLASS 51MUELLER SUPER CENTURION 250PARTDESCRIPTION52WATER SERVICEDISTANCE FROM PROPERTY LINEMIN BURY DEPTHCURB STOP VALVECURB STOP VALVE BOXCOMPRESSION CONNECTIONWATER SERVICE LINENOTES:1" TYPE K ANNEALED COPPER PIPE1" MUELLER (MODEL H-15403)MULLER H10388 CURB BOX 1 ¼” WITH A 2 ½” BASE TAPPING1" MUELLER BALL VALVE (MODEL B-25155)6.5'8'PARTDESCRIPTION54CORPORATION STOPCORPORATION STOP1" MULLER B-25008SERVICE SADDLE1" MUELLER BR 2 B SERIESWATER SERVICE LINE1" TYPE K ANNEALED COPPER PIPENOTES:PARTDESCRIPTION62GATE VALVEGATE VALVEVALVE BOXNOTES:EJIW 8560 SERIES MUELLER 2360 PARTDESCRIPTION51UTILITY TRENCHTRENCH WIDTHOUTSIDE Ø OF PIPE(S) + 3'PIPE BEDDING MATERIALTYPE 1MINIMUM DEPTH OF COVER4'INSULATION1" = 1'DETECTABLE WARNING TAPE DEPTH1.5' MINIMUM, 2' MAXIMUM BELOW GROUND SURFACEHORIZ. SEPERATION DIST. FROM SEWER10' MINIMUMVERTICAL SEPERATION DISTANCE1.5' MINIMUMNOTES:NOTES: ALL SPEC'S O.A.E. VIA CoBOZEMAN MOD'S TO MPWSSC3.11AS NOTEDHEC Mar 08, 2022 - 3:14pmCAD FILE: M:\193211\Drawings\Construction Drawings\C3.10-WATR DETAILS.dwg REVISIONSDATEPROJECT NUMBERHYALITE Engineers, PLLC2304 N 7th Ave. Ste. LBozeman, MT 59715Tel: (406) 587.2781w w w . hyaliteeng. comFax: (406) 522.92252018PARKVIEW CROSSINGS BOZEMAN, MTCAMPECHE SHORES DEVELOPMENT, LLCMARCH 8, 2022193211CONSTRUCTION DRAWINGS - 22x34 originals INFRASTRUCTURE IMPROVEMENTSSCALESHEET TITLEDESIGN BYP.O. BOX 3088GALVESTON, TXAS NOTEDBVWATER DETAILS (CONT.) 8''W8''W8''W8''W8''W8''W8''WHYD8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''WHYDHYD8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''WHYDHYD8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S 8''S 8''S 8''S 8''S 8''S 8''S 8''S 8''S 8''S8''S8''S8''S8''SSSSSSSSS8''S8''S8''S8'' S SSS8''SSSSLOT 1ALOT 1BLOT 1CLOT 1DLOT 9ALOT 8CLOT 9BLOT 7CLOT 8DLOT 9DLOT 7DLOT 8BLOT 6BLOT 7BLOT 6ALOT 7ALOT 6DLOT 6CLOT 9CLOT 8ALOT 3CLOT 3BLOT 3DLOT 5ALOT 1ALOT 1BLOT 1CLOT 2ALOT 4CLOT 4BLOT 4ALOT 4DLOT 5BLOT 5CLOT 5DLOT 2BLOT 3ALOT 1DLOT 2ALOT 1BLOT 1CLOT 2BLOT 2CLOT 1ACA 1STSTSTSTSTSTSTST STSTSTSTSTSTSTSTSTSTSTSTSTSTSTST4710470547104705 4705 4715HEC Mar 08, 2022 - 3:15pmCAD FILE: M:\193211\Drawings\Construction Drawings\C4.0 STORM.dwg REVISIONSDATEPROJECT NUMBERHYALITE Engineers, PLLC2304 N 7th Ave. Ste. LBozeman, MT 59715Tel: (406) 587.2781w w w . hyaliteeng. comFax: (406) 522.92252018PARKVIEW CROSSINGS BOZEMAN, MTCAMPECHE SHORES DEVELOPMENT, LLCMARCH 8, 2022193211CONSTRUCTION DRAWINGS - 22x34 originals INFRASTRUCTURE IMPROVEMENTSSCALESHEET TITLEDESIGN BYP.O. BOX 3088GALVESTON, TXAS NOTEDBVOVERALL STORM WATERPLANC4.0EXISTINGSTORMWATERINLETS (TYP.)PROPOSED 15" DIA.A2000 PVC STORMSEWER (TYP.)EXISTINGSTORM POND5B1.ALSO SEE NOTES ON SHEET G1.1.2.PROTECT IN PLACE ALL EXISTING UTILITIES UNLESS NOTED OTHERWISE. IF CONFLICT EXISTS,NOTIFY THE ENGINEER IMMEDIATELY.3.STORM DRAIN INLETS SHALL CONFORM TO CITY OF BOZEMAN STANDARD DRAWINGS NO.02720-1A AND NO. 02720-14.ALL STORM DRAIN STATIONING IS REFERENCED TO THE CENTERLINE OF THE LOOP ROAD.5.RIM ELEVATION IS EQUAL TO FLOWLINE ELEVATION FOR ALL STORM DRAIN INLETSGENERAL STORMWATER NOTES0'60'120'180'PROPOSED INLET (TYP.)EXISTINGSTORM POND1BLOOPALIGNMENTPROPOSED STORMWATERDETENTION PONDEXTENSIONPROPOSED STORMDRAIN MANHOLE (TYP.)TSCHACHE LANEVAQUERO PARKWAYROAD APROPOSED DRAINAGEDIRECTION (TYP.)1C4.2 46904700471047204730469047004710472047302.96%-3.04%0.67%1.61%3.00%-3.00%-0.01%-1.47%0.50%0.72%-1.01%4704.30+004703.84705.224703.84705.551+004705.84706.124707.04706.932+004708.44707.744709.44708.543+004709.94709.214710.44709.604+004710.74709.854711.3 4710.105+004711.1 4710.35 4710.6 4710.606+004710.1 4710.85 4710.1 4711.117+004710.1 4711.36 4710.3 4711.648+004710.6 4711.97 4710.8 4712.339+004711.4 4712.69 4712.5 4713.0510+004712.8 4713.41 4713.4 4713.7711+004713.1 4713.97 4713.0 4713.7412+004712.6 4713.24 4710.8 4712.9213+004711.6 4712.78 4712.1 4712.1314+00SDI-106 - 48" CIRC SDISTA. 0+68.25 (-15.82' L)FLOWLINE ELEV = 4704.7815" INV IN = 4702.3212" INV IN = 4702.3215"INV OUT = 4702.3215" A-2000 PVC L=183.82' S=-0.79%SDI-104 - 48" CIRC SDISTA. 2+55.63 (-15.43' L)FLOWLINE ELEV = 4707.3115" INV IN = 4703.7615"INV OUT = 4703.7615" A-2000 PVC L=173.43' S=-0.90%MH-100 - 36" MANHOLESTA. 4+59.10 (7.29' R)FLOWLINE ELEV = 4709.6815" INV IN = 4705.3215"INV OUT = 4705.32 15" A-2000 PVC L=253.99' S=0.50%SDI-100 - 48" CIRC SDI STA. 12+68.37 (15.43' R) FLOWLINE ELEV = 4712.53 15"INV OUT = 4710.07 SDI-102 - 24" X 36" RECT SDI STA. 7+16.40 (15.78' R) FLOWLINE ELEV = 4710.63 12" INV IN = 4706.60 15"INV OUT = 4706.60 BLOCK 2 BLOCK 1 BLOCK 3 LOT 1A LOT 1B LOT 1C LOT 1DLOT 9A LO T 8C LOT 9B LO T 7C LOT 8D LOT 9D LO T 7D LO T 8B LO T 6B LO T 7B LO T 6A LO T 7A LO T 6D LO T 6C LOT 9C LO T 8A LO T 3C LO T 3B LO T 3D LO T 5A LOT 1ALOT 1BLOT 1CLOT 2A LO T 4C LO T 4B LO T 4A LO T 4D LO T 5B LO T 5C LO T 5D LOT 2B LO T 3A LOT 1D LO T 2A LO T 1B LO T 1C LO T 2B LO T 2C LO T 1A CA 18''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S S S S S S S 8''S8''S8''S8''S8''S S S S8''SS S S8''W8''W8''W8''W8''W8''W 8''W 8''W HY D 8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W HYD8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''WHY D HYD 12"A-2000 PVCL=27.03' S=1.87%0+001+002+003+004+005+006+007+008+009+0010+0011+00 12+00 13+00 14+00 STSTSTSTSTSTSTSTSTSTSTSTSTSTST ST ST ST STSTSTSTSTSTSTSTSTST STSTSTSTST47154710471047104705 4705SDI-105 - 24" X 36" RECT SDISTA. 0+66.88 (15.16' R)RIM ELEV = 4704.83S 12" DIA. INV OUT = 4702.8212"A-2000 PVCL=27.55' S=-0.73%SDI-103 - 24" X 36" RECT SDISTA. 7+15.65 (-15.76' L)RIM ELEV = 4710.63SW 12" DIA. INV OUT = 4706.804704 4703 4702 0'50'100'150'SCALE1" = 50' HORIZ.1" = 5' VERT.LOOP STORM P&PSTA. 0+00 TO STA. 14+00HEC Mar 08, 2022 - 3:15pmCAD FILE: M:\193211\Drawings\Construction Drawings\C4.1 STORM P&P.dwg REVISIONSDATEPROJECT NUMBERHYALITE Engineers, PLLC2304 N 7th Ave. Ste. LBozeman, MT 59715Tel: (406) 587.2781w w w . hyaliteeng. comFax: (406) 522.92252018PARKVIEW CROSSINGS BOZEMAN, MTCAMPECHE SHORES DEVELOPMENT, LLCMARCH 8, 2022193211CONSTRUCTION DRAWINGS - 22x34 originals INFRASTRUCTURE IMPROVEMENTSSCALESHEET TITLEDESIGN BYP.O. BOX 3088GALVESTON, TXAS NOTEDBVEXISTING GRND. ELEV. @ ℄ FINISHED GRND. ELEV. @ ℄LOOP STORM P&PC4.1CONNECT TOEXISTING 15"ØA-2000 PVCLOOPALIGNMENTDRY UTILITY CONDUITS (TYP.)INSTALL PER NWE STANDARDSROAD SLOPE / FLOWDIRECTION (TYP.)CONNECT TOEXISTING 15"ØA-2000 PVC ST ST STSTSTST ST4705FG = 4699.50FG = 4701.50FG = 4699.50FG = 4701.50FG = 4699.50FG = 4700.09EG = 4703.45EG = 4704.14EG = 4702.26EG = 4701.47EG = 4701.24EG = 4702.284704470347024692470446924704-0+254703.7 4703.690+004703.3 4699.50 4702.8 4699.500+504701.9 4699.50 4701.9 4699.501+004701.2 4701.44 4700.11+504695.9 2+000'10'20'30'C4.2AS NOTEDDETENTION PONDCONSTRUCTION DETAILHEC Mar 08, 2022 - 3:15pmCAD FILE: M:\193211\Drawings\Construction Drawings\C4.1 STORM P&P.dwg REVISIONSDATEPROJECT NUMBERHYALITE Engineers, PLLC2304 N 7th Ave. Ste. LBozeman, MT 59715Tel: (406) 587.2781w w w . hyaliteeng. comFax: (406) 522.92252018PARKVIEW CROSSINGS BOZEMAN, MTCAMPECHE SHORES DEVELOPMENT, LLCMARCH 8, 2022193211CONSTRUCTION DRAWINGS - 22x34 originals INFRASTRUCTURE IMPROVEMENTSSCALESHEET TITLEDESIGN BYP.O. BOX 3088GALVESTON, TXAS NOTEDBVEXISTING STORM PONDREQUIRED STORAGE = 2611 CFPROVIDED STORAGE = 5495 CF2 C4.2 EXISTING GRND. ELEV. @ ℄ FINISHED GRND. ELEV. @ ℄BOTTOM ELEV. = 4699.50'TOP ELEV. = 4701.50'EXISTING OUTLET STRUCTURE(TO BE RELOCATED AND REUSED)EXISTING OUTFALL LOCATION(TO REMAIN)PROPOSED OUTLETSTRUCTURE LOCATION(SEE DET. 6/C4.10)8" DIA. A2000 PVCLENGTH = 30'SLOPE = 11.7%INV. OUT = 4696'PROPOSEDSTORM POND EXTENSIONREQUIRED STORAGE = 9901 CFPROVIDED STORAGE = 10198 CF4:1 SLOPE4:1 SLOPE 1SCALE: N.T.S.2SCALE: N.T.S.CIRCULAR STORM DRAIN INLET24" x 36" RECTANGULAR STORM DRAIN INLETPOST (2" x 2" NOMINAL)SILT FENCE FABRIC TOPOST6" x 6" TRENCH24" MIN.18" MIN.SILT FABRICSTAPLED TOPOSTSCOMPACTEDBACKFILLSILT FENCE FABRICANCHORED IN TRENCHAND ATTACHEDFIRMLY TO POSTFLOWTRENCH 6" x 6"FLOWFLOWO.D.AS REQUIRED INLETCASTINGOPENING24" SQUARE OPENING48" R.C.P. ASTM C-76 CLASS 2BLOCK OUT FORINLET/OUTLETPIPES9" SUMP6" PRECAST BASE6"FLAT TOPAS REQUIRED INLETCASTINGOPENING24"BLOCK OUT FORINLET PIPE9" SUMP6" PRECAST BASE6"FLAT TOPI.D.PLAN VIEWPLAN VIEWSECTION VIEWSECTION VIEWO.D.I.D.4" WALLTBC ELEV.TOP OF CONC.ELEV.TBC ELEV.TOP OF CONC.ELEV.PARTMANUFACTURERFRAMEEAST JORDANIRON WORKSMATERIALRATINGIRONTRAFFIC RATEDCOVEREAST JORDANIRON WORKSIRONTRAFFIC RATEDPRODUCT #3772-Z13771-C1NOTES:1.COVER TO BE STAMPED "STORM DRAIN" WITH CITY OF BOZEMAN LOGO2.ASSURE THAT ALL COVERS HAVE TWO PICK HOLES, 1”MINIMUM, 1 ¼ ” MAXIMUMDIAMETERPARTMANUFACTURERFRAMEEAST JORDANIRON WORKSMATERIALRATINGIRONTRAFFIC RATEDGRATEEAST JORDANIRON WORKSIRONTRAFFIC RATEDBACKEAST JORDANIRON WORKSIRONTRAFFIC RATEDPRODUCT #007030-Z1007030-M6 ORM7 FOR SAG007030-T1STAKE(2"x2" NOMINAL)TWINE/WIREBACKFILL MATERIAL(COMPACT SOIL TOPREVENT PIPING)FLOWSTAKED ANDENTRENCHEDEROSION BALETWINE/WIRESTAKEFILTERED RUNOFFRUNOFF12"4"3TYPICAL STRAW BALE DETAILWOVEN WIRE FENCE (14 GA.MIN., MAX 6" MESH SPACING)WITH FILTER CLOTH COVER.EMBED FILTER FABRIC MIN. 8"INTO GROUNDSECTION36" MIN. FENCE POSTUNDISTURBEDGROUNDFLOW20" MIN.16" MIN.4TYPICAL SILT FENCE DETAILSCALE: N.T.S.SCALE: N.T.S.RIM ELEV. = FLOWLINERIM ELEV. = FLOWLINENOTES:1.INLET CASTINGS SHALL HAVE A LOGO CAST INTO THE CURB PIECE STATING“DUMP NO WASTE, DRAINS TO WATERWAYS”STORM MANHOLESSTORM DRAIN INLETSSCALE: N.T.S.CONTRACTOR TOGROUT ANNULARSPACES OR USESUPPLIED GASKETSCONTRACTOR TOGROUT ANNULARSPACES OR USESUPPLIED GASKETS9"SUMP6" BASEGRADERINGS ASNEEDEDPLAN VIEWSECTION VIEW24"Ø OPENINGSTORMSEWEREJIW-IFCOMADEINUSACAST IRON 4" OR 7"FRAME AND COVERCONTRACTOR TOGROUT ANNULARSPACES OR USESUPPLIED GASKETS5TYPICAL STORM MANHOLESCALE: N.T.S.DIAMETER VARIESSEE SCHEDULERIM ELEV.STORMWATER STRUCTURE SCHEDULENAMEEXISTING SDI-1EXISTING SDI-2MH-100SDI-100SDI-102SDI-103SDI-104SDI-105SDI-106TYPE36" CIRC36" CIRC36" MANHOLE48" CIRC SDI24" X 36" RECT SDI24" X 36" RECT SDI48" CIRC SDI24" X 36" RECT SDI48" CIRC SDIGRATE7030-M67030-M6MH LID7030-M67030-M67030-M67030-M67030-M67030-M6RIM ELEV4711.644705.464709.684712.534710.634710.634707.314704.834704.78PIPES INW 15"Ø INV IN =4709.86W 15"Ø INV IN =4701.80SE 15"Ø INV IN =4705.32NE 12"Ø INV IN =4706.60S 15"Ø INV IN =4703.76W 15"Ø INV IN =4702.32N 12"Ø INV IN =4702.32PIPES OUTNE 15"Ø INV OUT =4709.86E 15"Ø INV OUT =4701.80N 15"Ø INV OUT =4705.32E 15"Ø INV OUT =4710.07NW 15"Ø INV OUT =4706.60SW 12"Ø INV OUT =4706.80E 15"Ø INV OUT =4703.76S 12"Ø INV OUT =4702.82E 15"Ø INV OUT =4702.32PROPOSED GRADING (TYPE 'B' COMPACTION)PLACE OVERFLOW WEIR ALIGNED W/ SWALEFOR EMERGENCY OVERFLOW SPILLWAYOVERFLOW STRUCTURE, EXISTINGSTRUCTURE TO BE RE-USEDEXISTING GROUNDOUTLET PROTECTION(4"-6" COBBLES)OUTLET PIPINGNOTES:1. 4:1 SIDE SLOPESDAYLIGHTINLET GRATE TO FACEINSIDE OF POND, INVERTOF GRATE TO BE 4" ABOVEPOND BOTTOMSCALE: N.T.S.DETENTION POND W/ OUTLET STRUCTURE6STORMWATER STRUCTURE SCHEDULES7C4.10AS NOTEDHEC Mar 08, 2022 - 3:15pmCAD FILE: M:\193211\Drawings\Construction Drawings\C4.10-STRM DETAILS.dwg REVISIONSDATEPROJECT NUMBERHYALITE Engineers, PLLC2304 N 7th Ave. Ste. LBozeman, MT 59715Tel: (406) 587.2781w w w . hyaliteeng. comFax: (406) 522.92252018PARKVIEW CROSSINGS BOZEMAN, MTCAMPECHE SHORES DEVELOPMENT, LLCMARCH 8, 2022193211CONSTRUCTION DRAWINGS - 22x34 originals INFRASTRUCTURE IMPROVEMENTSSCALESHEET TITLEDESIGN BYP.O. BOX 3088GALVESTON, TXAS NOTEDBVSTORM DETAILS LOT 1ALOT 1BLOT 1CLOT 1DLOT 9ALOT 8CLOT 9BLOT 7CLOT 8DLOT 9DLOT 7DLOT 8BLOT 6BLOT 7BLOT 6ALOT 7ALOT 6DLOT 6CLOT 9CLOT 8ALOT 3CLOT 3BLOT 3DLOT 5ALOT 1ALOT 1BLOT 1CLOT 2ALOT 4CLOT 4BLOT 4ALOT 4DLOT 5BLOT 5CLOT 5DLOT 2BLOT 3ALOT 1DLOT 2ALOT 1BLOT 1CLOT 2BLOT 2CLOT 1ACA 18''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S 8''S 8''S 8''S 8''S 8''S 8''S 8''S 8''S 8''S8''S8''S8''S8''SSSSSSSSS8''S8''S8''S8'' S SSS8''SSSSLOT 1ALOT 1BLOT 1CLOT 1DLOT 9ALOT 8CLOT 9BLOT 7CLOT 8DLOT 9DLOT 7DLOT 8BLOT 6BLOT 7BLOT 6ALOT 7ALOT 6DLOT 6CLOT 9CLOT 8ALOT 3CLOT 3BLOT 3DLOT 5ALOT 1ALOT 1BLOT 1CLOT 2ALOT 4CLOT 4BLOT 4ALOT 4DLOT 5BLOT 5CLOT 5DLOT 2BLOT 3ALOT 1DLOT 2ALOT 1BLOT 1CLOT 2BLOT 2CLOT 1ACA 1BLOCK 9LO T 9 L O T 8 L O T 7 L O T 5 L O T 6 PHASE 4HLOT 9LOT 8LOT 7LOT 6LOT 5LOT 4LOT 3LOT 2LOT 1PHASE 4GBLOCK 10PHA SE 4F PHASE 4F TSCHACHE LANE VAQUERO PARKWAYVAQUERO PARKWAYSTSTSTSTSTSTSTST ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST8''W8''W8''W8''W8''W8''W8''WHYD8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''WHYDHYD8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''WHYDHYD100+00101+00102+00103+00104+00105+00106+00107+00107+130+001+002+003+004+005+006+007+008+009+0010+001 1 + 0 0 1 2 + 0 0 1 3 + 0 0 1 4 + 0 0 1 4 + 4 8 HEC Mar 08, 2022 - 3:16pmCAD FILE: M:\193211\Drawings\Construction Drawings\C5.0 ROADS.dwg REVISIONSDATEPROJECT NUMBERHYALITE Engineers, PLLC2304 N 7th Ave. Ste. LBozeman, MT 59715Tel: (406) 587.2781w w w . hyaliteeng. comFax: (406) 522.92252018PARKVIEW CROSSINGS BOZEMAN, MTCAMPECHE SHORES DEVELOPMENT, LLCMARCH 8, 2022193211CONSTRUCTION DRAWINGS - 22x34 originals INFRASTRUCTURE IMPROVEMENTSSCALESHEET TITLEDESIGN BYP.O. BOX 3088GALVESTON, TXAS NOTEDBVOVERALL ROAD PLANC5.0REMOVE EXTG. DEADEND BARRICADESBEGIN PROJECT0+57SAW-CUT AND MATCHEXTG. ASPHALTEND PROJECTSTA. 12+70SAW-CUT AND MATCHEXTG. ASPHALTMATCH CROSS SECTION0'60'120'180'UNDERGROUND DRYUTILITY CONDUITSPER NWE(SEE DETAIL 5/C5.10)ALLEYALIGNMENTLOOPALIGNMENTENTIRE LOOP ROAD TO BECONSTRUCTED TO CoBSTANDARDS, WITH A 33'TBC TO TBC WIDTHENTIRE ALLEY TO BE CONSTRUCTEDTO CoB STANDARDS, WITH A 2'CONCRETE PAVING EDGE ALONGEACH SIDE OF THE ALLEY10' WIDE SHARED USE PATHWAYTO BE CONSTRUCTED FROM NORTHERNTO SOUTHERN PROPERTY BOUNDARY,WITHIN VAQUERO PARKWAY R.O.W.6' WIDE SIDEWALK ALONGPARK FRONTAGE5' WIDE INTERNALSUBDIVISION SIDEWALK ℄ VAQUERO PARKWAY ℄ VAQUEROPARKWAY469047004710 47204730469047004710472047302.96%-3.04%0.67%1.61%3.00%-3.00%-0.01%-1.47%0.50%0.72%-1.01%PVI STA: 1+24.95PVI ELEV: 4705.72K: 53.01LVC: 50.00BVCS: 0+99.95BVCE: 4705.55EVCS: 1+49.95EVCE: 4706.12 PVI STA: 7+98.73PVI ELEV: 4711.60K: 456.17LVC: 100.00BVCS: 7+48.73 BVCE: 4711.35 EVCS: 8+48.73 EVCE: 4711.96 PVI STA: 3+49.91PVI ELEV: 4709.35K: 89.90LVC: 100.00BVCS: 2+99.91BVCE: 4708.54EVCS: 3+99.91EVCE: 4709.60 PVI STA: 11+57.08PVI ELEV: 4714.18K: 57.69LVC: 100.00BVCS: 11+07.08 BVCE: 4713.82 EVCS: 12+07.08 EVCE: 4713.68 4704.30+004703.84705.224703.84705.551+004705.84706.124707.04706.932+004708.44707.744709.44708.543+004709.94709.214710.44709.604+004710.74709.854711.3 4710.105+004711.1 4710.35 4710.6 4710.606+004710.1 4710.85 4710.1 4711.117+004710.1 4711.36 4710.3 4711.648+004710.6 4711.97 4710.8 4712.339+004711.4 4712.69 4712.5 4713.0510+004712.8 4713.41 4713.4 4713.7711+004713.1 4713.97 4713.0 4713.7412+004712.6 4713.24 4710.8 4712.9213+004711.6 4712.78 4712.1 4712.1314+00STA = 12+95.46ELEV = 4712.78END LOOP STATION 12+70 BEGIN LOOPSTATION 0+57℄ ALLEYSTATION 1+52.88 ℄ ALLEY STATION 11+62.99STA = 12+30.04ELEV = 4713.43STA = 0+33.05ELEV = 4705.10STA = 0+17.54ELEV = 4705.57STA = 13+10.96ELEV = 4713.25STSTSTSTSTSTSTSTSTSTSTST ST ST ST STSTSTSTSTSTST STSTSTSTSTSTSTSTBLOCK 2 BLOCK 1 BLOCK 3 LOT 1A LOT 1B LOT 1C LOT 1D LO T 9A LO T 8C LOT 9B LO T 7C LO T 8D LOT 9D LO T 7D LO T 8B LO T 6B LO T 7B LO T 6A LO T 7A LO T 6D LO T 6C LOT 9C LO T 8A LO T 3C LO T 3B LO T 3D LO T 5A LOT 1ALOT 1BLOT 1C LO T 2A LO T 4C LO T 4B LO T 4A LO T 4D LO T 5B LO T 5C LO T 5D LO T 2B LO T 3A LOT 1D LO T 2A LO T 1B LO T 1C LO T 2B LO T 2C LO T 1A CA 18''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S S S S S S S 8''S8''S8''S8''S8''S S S S8''SS S S8''W8''W8''W8''W8''W8''W 8''W 8''W HY D 8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8' 'W8''W8''W8''W8''W HYD8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''WHY D HYD VAQUERO PARKWAYSTSTSTSTSTST0+001+002+003+004+005+006+007+008+009+0010+0011+00 12+00 13+00100+00101+00102+00103+00104+00105+00106+00107+00107+13ALIGNMENT=LOOP TO TSCHACHESTATION=1+52.63OFFSET=0.00NORTHING=532246.09EASTING=1562548.94ALIGNMENT=ALLEYSTATION=100+16.65OFFSET=0.00NORTHING=532246.09EASTING=1562548.94ALIGNMENT=LOOP TO TSCHACHESTATION=11+66.53OFFSET=0.00NORTHING=531655.93EASTING=1562833.94ALIGNMENT=ALLEYSTATION=106+96.49OFFSET=0.00NORTHING=531655.93EASTING=1562833.940'50'100'150'SCALE1" = 50' HORIZ.1" = 5' VERT.CONTOUR INTERVAL = 1'LOOP ROADS P&PSTA. 0+00 TO STA. 14+00HEC Mar 08, 2022 - 3:16pmCAD FILE: M:\193211\Drawings\Construction Drawings\C5.1 ROADS P&P.dwg REVISIONSDATEPROJECT NUMBERHYALITE Engineers, PLLC2304 N 7th Ave. Ste. LBozeman, MT 59715Tel: (406) 587.2781w w w . hyaliteeng. comFax: (406) 522.92252018PARKVIEW CROSSINGS BOZEMAN, MTCAMPECHE SHORES DEVELOPMENT, LLCMARCH 8, 2022193211CONSTRUCTION DRAWINGS - 22x34 originals INFRASTRUCTURE IMPROVEMENTSSCALESHEET TITLEDESIGN BYP.O. BOX 3088GALVESTON, TXAS NOTEDBVAS NOTEDSAJEXISTING GRND. ELEV. @ ℄ FINISHED GRND. ELEV. @ ℄LOOP ROADS P&PC5.1DRY UTILITY CONDUITS (TYP.)INSTALL PER NWE STANDARDSLOOPALIGNMENTALLEYALIGNMENTBEGIN LOOPSTATION 0+57END LOOPSTATION 12+70 46904700471047204730469047004710472047300.50%2.11%3.19%-2.76%4.34%1.22%PVI STA: 104+15.00PVI ELEV: 4709.20K: 62.18LVC: 100.00BVCS: 103+65.00 BVCE: 4708.95 EVCS: 104+65.00 EVCE: 4710.25 PVI STA: 101+75.00PVI ELEV: 4708.00K: 139.32LVC: 100.00BVCS: 101+25.00BVCE: 4707.39 EVCS: 102+25.00 EVCE: 4708.25 PVI STA: 105+99.98PVI ELEV: 4713.10K: 191.94LVC: 100.00BVCS: 105+49.98 BVCE: 4712.05 EVCS: 106+49.98 EVCE: 4713.8999+004705.7100+004706.14706.484706.84707.09101+004707.5 4707.67 4708.0 4708.10102+004708.5 4708.38 4707.8 4708.62103+004708.4 4708.88 4708.9 4709.22104+004708.9 4709.96 4710.0 4710.99105+004711.2 4712.05 4712.4 4713.03106+004712.5 4713.89 4713.0 4713.84107+00108+00℄ LOOP STATION 106+96.49 ℄ LOOPSTATION 100+16.65STA = 100+32.29ELEV = 4705.89STA = 106+80.97ELEV = 4713.11STA = 100+16.65ELEV = 4706.17STA = 106+96.49ELEV = 4713.42STSTSTSTSTSTSTSTSTSTSTST ST ST ST STSTSTSTSTSTST STSTSTSTSTSTSTSTBLOCK 2 BLOCK 1 BLOCK 3 LOT 1A LOT 1B LOT 1C LOT 1D LO T 9A LO T 8C LOT 9B LO T 7C LO T 8D LOT 9D LO T 7D LO T 8B LO T 6B LO T 7B LO T 6A LO T 7A LO T 6D LO T 6C LOT 9C LO T 8A LO T 3C LO T 3B LO T 3D LO T 5A LOT 1ALOT 1BLOT 1C LO T 2A LO T 4C LO T 4B LO T 4A LO T 4D LO T 5B LO T 5C LO T 5D LO T 2B LO T 3A LOT 1D LO T 2A LO T 1B LO T 1C LO T 2B LO T 2C LO T 1A CA 18''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S S S S S S S 8''S8''S8''S8''S8''S S S S8''SS S S8''W8''W8''W8''W8''W8''W 8''W 8''W HY D 8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8' 'W8''W8''W8''W8''W HYD8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''WHY D HYD VAQUERO PARKWAYSTSTSTSTSTST0+001+002+003+004+005+006+007+008+009+0010+0011+00 12+00 13+00100+00101+00102+00103+00104+00105+00106+00107+00107+13ALIGNMENT=LOOP TO TSCHACHESTATION=1+52.63OFFSET=0.00NORTHING=532246.09EASTING=1562548.94ALIGNMENT=ALLEYSTATION=100+16.65OFFSET=0.00NORTHING=532246.09EASTING=1562548.94ALIGNMENT=LOOP TO TSCHACHESTATION=11+66.53OFFSET=0.00NORTHING=531655.93EASTING=1562833.94ALIGNMENT=ALLEYSTATION=106+96.49OFFSET=0.00NORTHING=531655.93EASTING=1562833.940'50'100'150'SCALE1" = 50' HORIZ.1" = 5' VERT.CONTOUR INTERVAL = 1'ALLEY ROADS P&PSTA. 99+00 TO STA. 108+00HEC Mar 08, 2022 - 3:16pmCAD FILE: M:\193211\Drawings\Construction Drawings\C5.1 ROADS P&P.dwg REVISIONSDATEPROJECT NUMBERHYALITE Engineers, PLLC2304 N 7th Ave. Ste. LBozeman, MT 59715Tel: (406) 587.2781w w w . hyaliteeng. comFax: (406) 522.92252018PARKVIEW CROSSINGS BOZEMAN, MTCAMPECHE SHORES DEVELOPMENT, LLCMARCH 8, 2022193211CONSTRUCTION DRAWINGS - 22x34 originals INFRASTRUCTURE IMPROVEMENTSSCALESHEET TITLEDESIGN BYP.O. BOX 3088GALVESTON, TXAS NOTEDBVAS NOTEDSAJEXISTING GRND. ELEV. @ ℄ FINISHED GRND. ELEV. @ ℄ALLEY ROADS P&PC5.2LOOPALIGNMENTALLEYALIGNMENTBEGIN ALLEYSTATION 100+32.39END LOOPSTATION 12+70END ALLEYSTATION 106+80.97PROVIDE ALLEYAPPROACH PER CITY OFBOZEMAN STD. DWG. 02529-7APROVIDE ALLEYAPPROACH PER CITY OFBOZEMAN STD. DWG. 02529-7A LOT 9ALOT 8CLOT 9BLOT 7CLOT 8DLOT 9DLOT 7DLOT 8BLOT 6BLOT 7BLOT 6ALOT 7ALOT 6DLOT 6CLOT 9CLOT 8ALOT 3CLOT 3BLOT 3DLOT 5ALOT 1ALOT 1BLOT 1CLOT 2ALOT 4CLOT 4BLOT 4ALOT 4DLOT 5BLOT 5CLOT 5DLOT 2BLOT 3ALOT 1DLOT 2ALOT 1BLOT 1CLOT 2BLOT 2CLOT 1A8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S 8''S 8''S 8''S 8''S 8''S 8''S 8''S 8''S8''S8''S8''S8''S8''S8''SSSSSSS8''S8''S8''S8''S8''S8'' S 8'' S SSS8''S8''SSSSLOT 9ALOT 8CLOT 9BLOT 7CLOT 8DLOT 9DLOT 7DLOT 8BLOT 6BLOT 7BLOT 6ALOT 7ALOT 6DLOT 6CLOT 9CLOT 8ALOT 3CLOT 3BLOT 3DLOT 5ALOT 1ALOT 1BLOT 1CLOT 2ALOT 4CLOT 4BLOT 4ALOT 4DLOT 5BLOT 5CLOT 5DLOT 2BLOT 3ALOT 1DLOT 2ALOT 1BLOT 1CLOT 2BLOT 2CLOT 1ABLOCK 9L O T 9 L O T 8 L O T 7 L O T 5 L O T 6 PHASE 4HLOT 9LOT 8LOT 7LOT 6LOT 5LOT 4LOT 3PHASE 4GBLOCK 10PHASE 4F PHASE 4F T SCHACHE LANEVAQUERO PARKWAYSTSTSTSTSTSTSTSTSTSTSTST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST VAQUERO PKWYSTOPNOPARKINGANYTIME8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''WHYD8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''WHYD8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''WHYDHYDMIRYNN LNVAQUERO PKWYSTOPNOPARKINGANYTIMETSCHACHE LNMIRYNN LNT S C H A C H E L N HEC Mar 08, 2022 - 3:16pmCAD FILE: M:\193211\Drawings\Construction Drawings\C5.0 ROADS.dwg REVISIONSDATEPROJECT NUMBERHYALITE Engineers, PLLC2304 N 7th Ave. Ste. LBozeman, MT 59715Tel: (406) 587.2781w w w . hyaliteeng. comFax: (406) 522.92252018PARKVIEW CROSSINGS BOZEMAN, MTCAMPECHE SHORES DEVELOPMENT, LLCMARCH 8, 2022193211CONSTRUCTION DRAWINGS - 22x34 originals INFRASTRUCTURE IMPROVEMENTSSCALESHEET TITLEDESIGN BYP.O. BOX 3088GALVESTON, TXAS NOTEDBVSIGNAGE AND STRIPINGPLANC5.3REMOVE EXTG. DEADEND BARRICADESINSTALL NO PARKING SIGN &STREET NAME/STOP SIGN PERCITY OF BOZEMAN DETAILS(SEE DETAIL 3/C5.10)0'40'80'120'INSTALL NO PARKING SIGN &STREET NAME/STOP SIGN PERCITY OF BOZEMAN DETAILS (SEEDETAIL 3/C5.10)YELLOW CURB PAINT FORNO PARKING (TYP.) PERCITY OF BOZEMAN REG'SRED CURB PAINT IN FRONTOF HYDRANTS (TYP.) PERCITY OF BOZEMAN REG'STYPE "B" CROSSWALKSTRIPING, PER COB STD.DWG. #02581-2 (TYP.)INSTALL PEDESTRIAN CROSSINGSIGN (MUTCD NO. W11-2) ANDARROW (MUTCD NO. W16-7P)(TYP.)SIGN TO BE INSTALLEDON LIGHT POLE LOT 1ALOT 1BLOT 1CLOT 1DLOT 9ALOT 8CLOT 9BLOT 7CLOT 8DLOT 9DLOT 7DLOT 8BLOT 6BLOT 7BLOT 6ALOT 7ALOT 6DLOT 6CLOT 9CLOT 8ALOT 3CLOT 3BLOT 3DLOT 5ALOT 1ALOT 1BLOT 1CLOT 2ALOT 4CLOT 4BLOT 4ALOT 4DLOT 5BLOT 5CLOT 5DLOT 2BLOT 3ALOT 1DLOT 2ALOT 1BLOT 1CLOT 2BLOT 2CLOT 1ACA 18''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S8''S 8''S 8''S 8''S 8''S 8''S 8''S 8''S 8''S 8''S8''S8''S8''S8''SSSSSSSSS8''S8''S8''S8'' S SSS8''SSSSLOT 1ALOT 1BLOT 1CLOT 1DLOT 9ALOT 8CLOT 9BLOT 7CLOT 8DLOT 9DLOT 7DLOT 8BLOT 6BLOT 7BLOT 6ALOT 7ALOT 6DLOT 6CLOT 9CLOT 8ALOT 3CLOT 3BLOT 3DLOT 5ALOT 1ALOT 1BLOT 1CLOT 2ALOT 4CLOT 4BLOT 4ALOT 4DLOT 5BLOT 5CLOT 5DLOT 2BLOT 3ALOT 1DLOT 2ALOT 1BLOT 1CLOT 2BLOT 2CLOT 1ACA 1BLOCK 9LO T 9 L O T 8 L O T 7 L O T 5 L O T 6 PHASE 4HLOT 9LOT 8LOT 7LOT 6LOT 5LOT 4LOT 3LOT 2LOT 1PHASE 4GBLOCK 10PHA SE 4F PHASE 4F TSCHACHE LANE VAQUERO PARKWAYVAQUERO PARKWAYSTSTSTSTSTSTSTST ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST12''ST8''W8''W8''W8''W8''W8''W8''WHYD8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''WHYDHYD8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''WHYDHYDHEC Mar 08, 2022 - 3:16pmCAD FILE: M:\193211\Drawings\Construction Drawings\C5.0 ROADS.dwg REVISIONSDATEPROJECT NUMBERHYALITE Engineers, PLLC2304 N 7th Ave. Ste. LBozeman, MT 59715Tel: (406) 587.2781w w w . hyaliteeng. comFax: (406) 522.92252018PARKVIEW CROSSINGS BOZEMAN, MTCAMPECHE SHORES DEVELOPMENT, LLCMARCH 8, 2022193211CONSTRUCTION DRAWINGS - 22x34 originals INFRASTRUCTURE IMPROVEMENTSSCALESHEET TITLEDESIGN BYP.O. BOX 3088GALVESTON, TXAS NOTEDBVLIGHTING PLANC5.4BEGIN PROJECTSAW-CUT AND MATCHEXTG. ASPHALTEND PROJECTSAW-CUT AND MATCHEXTG. ASPHALTMATCH CROSS SECTION0'60'120'180'UNDERGROUND DRYUTILITY CONDUITSPER NWE(SEE DETAIL 5/C5.10)STREET/PEDESTRIAN LIGHTINGPER CITY OF BOZEMAN (TYP.)SEE DETAIL 1/C5.122" UNDERGROUNDELECTRICALCONDUIT (TYP.)1.THE FOUR (4) STREELIGHT LUMINAIRES TO BE INSTALLEDSHALL MATCH THOSE INSTALLED WITHIN SURROUNDINGDEVELOPMENTS.2.THE LUMINAIRES LOCATED AT THE NORTH AND SOUTHINTERSECTIONS SHALL BE INSTALLED PER CITY OFBOZEMAN DESIGN STANDARDS:CATALOG # 1527LED-24L30T3-MLD014-FGDESCRIPTION: 25.0' POLE3.THE LUMINAIRES LOCATED AT THE MID-BLOCK PEDESTRIANCROSSING SHALL BE INSTALLED PER CITY OF BOZEMANDESIGN STANDARDS.CATALOG # 1521LED-12L30T2-MLD008-SV1DESCRIPTION: 17.5' POLEGENERAL NOTES THIS SHEETEXISTING STREET/PEDESTRIANLIGHTING (TYP.)MID-BLOCK PEDESTRIAN LIGHTINGPER CITY OF BOZEMAN (TYP.)SEE DETAIL 6/C5.12 SCALE: N.T.S.4SCALE: N.T.S.3EDGE OF SIGN TO CROSSWALK ℄ 9' (TYP.)2' MINFROMFACE OFCURBROAD NAMEFOC TO EDGE OF SIGN2' MIN7' MIN.6" BLANKS WITH 4" LETTERS,APPROVED BY LOCALAUTHORITYINSTALL SQUARE POST (2") BRACKETFOR FLAT STREET SIGNSINSTALL STOP SIGN (MUTCD NO.R1-1) ORIENT POST FOR FUTURESTOP SIGN IF NO SIGN IS REQUIREDFOR THIS PHASE2" PERFORATED,SQUARE TUBE 14GAUGEGALVANIZEDSTEEL POSTCROSS WALK ℄NOT USEDSTREET/STOP SIGN (CoBOZEMAN DETAIL 09810-1)NOTES:1.SEE CoBOZEMAN STANDARDDETAILS 09810-01 AND 09810-4.2.ALL SIGNAGE TO BE REVIEWEDAND APPROVED BY THE CITY OFBOZEMAN ENGINEER.3.REFERENCE MUTCD FORDIMENSIONSSCALE: N.T.S.2BOULEVARD SIDEWALK WITH PERPENICULAR PEDESTRIAN RAMP SECTION VIEW (CoBOZEMAN DETAIL 02529-8) DRY UTILITY CONDUIT DETAILSCALE: N.T.S.512" MIN.12" MIN.FINAL ASPHALT30" MIN.40" MAX.GRAVEL OR COMPACTEDSOIL AS PER ROAD SECTION1. ONE CONDUIT FOR ELECTRIC2. SECOND CONDUIT FOR COMMUNICATIONS3. THIRD CONDUIT FOR NATURAL GAS12" TYPICAL N-12 DOUBLEWALL CORRUGATED POLYCONDUITS WITH END CAPSAND BANDSSTREET SIGNPTPC 5' SIDEWALK (TYP.)5.5' BLVD. (TYP.)R = 15'6" THICKCONCRETE SURFACECURB (TYP.)BACK OF NO LIP9.5"1:12 MAX. 4" CONCRETESIDEWALK3" GRAVEL BASE (TYP.)FLOW LINE SECTION A-ASECTION B-B12"5'-0"12" 5"TOP OF CURBFLOW LINEVARIES5' SIDEWALKLANDINGTRANSITION TO NORMAL SIDEWALKELEVATION. DISTANCE VARIES.1:20 MAX.NO LIPFlow lineEXPANSIONJOINT1' (TYP.)1:20 MAX.1:20 MAX.2% MAX.2% MAX.EXPANSIONJOINTS5' X 5'SIDEWALKLANDING2 1/2" DEPRESSED SIDEWALK LANDINGSTANDARD CURB SECTION5'NO SCALENO SCALERAMPSECTION C-CNO SCALESCALE: N.T.S.1BOULEVARD SIDEWALK WITH PERPENICULAR PEDESTRIAN RAMP (CoBOZEMAN DETAIL 02529-8) NOTES1.STANDARD APPLIES TO NEW CONSTRUCTION, WITH MAX. CURB R=15', AND MIN. 5.5' BOULEVARDS.2.RAMP AND CURB CAN BE POURED MONOLITHICALLY.3.STORM DRAIN INLETS SHALL BE CONSTRUCTED "UPSTREAM" OF RAMPS. ALTERNATIVE LOCATIONS PERMITTEDONLY UPON CITY ENGINEER'S APPROVAL.4.RAMP WIDTH SHALL BE 5' MINIMUM.5.SIDEWALK CROSS-SLOPES SHALL NOT EXCEED 2%.6.BEGIN RAMP SLOPE AT FLOWLINE OF GUTTERNOTES:1.RAMPS ARE TO BE CONSTRUCTED WITH DETECTABLE WARNING SURFACES COMPLYING WITH ADAAG,COVERING THE ENTIRE WIDTH OF THE RAMPS. ONE CORNER OF THE DETECTABLE WARNING SURFACE MUSTBE WITHIN 8" OF THE GUTTER FLOWLINE; NO OTHER POINT ON THE LEADING EDGE OF THE DETECTABLEWARNING SURFACE MAY BE MORE THAN 5' FROM THE FLOWLINE.TRUNCATED DOMES PER CoB DESIGN STANDARDSC5.10AS NOTEDHEC Mar 08, 2022 - 3:16pmCAD FILE: M:\193211\Drawings\Construction Drawings\C5.10-ROADS DETAILS.dwg REVISIONSDATEPROJECT NUMBERHYALITE Engineers, PLLC2304 N 7th Ave. Ste. LBozeman, MT 59715Tel: (406) 587.2781w w w . hyaliteeng. comFax: (406) 522.92252018PARKVIEW CROSSINGS BOZEMAN, MTCAMPECHE SHORES DEVELOPMENT, LLCMARCH 8, 2022193211CONSTRUCTION DRAWINGS - 22x34 originals INFRASTRUCTURE IMPROVEMENTSSCALESHEET TITLEDESIGN BYP.O. BOX 3088GALVESTON, TXAS NOTEDBVROAD DETAILS SCALE: N.T.S.2"9"2'34" per 1' SLOPE3"15"3" of ASPHALT18"of 6" MINUS PITRUNSLOPESLOPE4" of 3/4" MINUSWASHED ROCK4" of M-4000 CONCRETE(6" FOR DRIVE-OVER)TOP OFCURBASPHALTDEPRESS CURB TO THIS LINE FOR CURBDROP. THE TRANSITION LENGTH BETWEEN ANORMAL CURB SECTION AND A DROP CURBSECTION SHALL BE 3' MIN.SCALE: N.T.S.6TYPICAL ROAD SECTIONSCALE: N.T.S.7SIDEWALK SECTIONSCALE: N.T.S.8CARRY CURB SECTION (COB DETAIL #2528-01)SCALE: N.T.S.9NOT USED 12'CL30' RIGHT-OF-WAY (FROM CL)14.5'DRIVING & PARKING LANE2'CURB7.5'BOULEVARD5'SIDEWALK1'BUFFER TO ROW11SCALE: N.T.S.TYPICAL STREET DETAIL 30' RIGHT-OF-WAY (FROM CL)2'CURB7.5'BOULEVARD5'SIDEWALK1'BUFFER TO ROWROW ROW60' ROW3% SLOPE3% SLOPE6" of 1.5" MINUS14.5'DRIVING & PARKING LANEEXISTING SUBGRADEOR EXCESS 6" MINUSPITRUN (SEEGEOTECH REPORT)12TYPICAL ALLEY DETAILMAX. THROAT WIDTH35' COMMERCIALMAINTAIN PROPER SIDEYARDSETBACK PERZONINGREGULATIONS1'PROPERTY LINE 5'VARIABLE(5.5' TYP.)5' TRANSITION SECTION FROMEXISTING CURB TO DROP CURB:EXPANSION JOINTS COMPLETELYAROUND SIDEWALK SECTIONCURB & APRON POURED MONOLITHICUNLESS OTHERWISE APPROVEDCONTRACTION JOINTBACK OF CURBFLOW LINEEDGE OF GUTTER* 5'5.5' TYP.(VARIES)1'SIDEWALK PORTIONDRIVEWAY PORTIONCURB & GUTTER6" WASHED PROPERTY LINE CONSTANT GRADEROCK40' INDUSTRIALEXPANSION JOINTSAT CURB RETURNSEXPANSION JOINT MATERIAL SHALL BE 1/2" THICK PRE-FORMEDBITUMINOUS TREATED FIBERBOARD FILLER. ALL CURB REPLACEMENTSHALL BE DONE WITH INTEGRAL CURB AND GUTTER UNLESSOTHERWISE APPROVED.CONTRACTION JOINTS TO BE SPACED AT10' INTERVALS IN CURB & GUTTERSIDEWALK CONTRACTION JOINTS SPACED AT 5'INTERVALS - MIN. DEPTH 1". EXPANSION JOINTS TOBE PLACED AT 25' INTERVALS.GRADE ESTABLISHED AS 1/4" RISE PER FOOT FROM TOP OF ADJACENT FULLHEIGHT CURB OR MATCH EXISTING SIDEWALK GRADESCALE: N.T.S.10NON-RESIDENTIAL DRIVEWAY APPROACH (CoBOZEMAN DETAIL 02529-12) MIN. 6" THICKM-4000 CONCRETE3" WASHED ROCK2% SLOPE2% SLOPE2% SLOPE2% SLOPE7' CL TO EDGE OF PAVEMENT7' CL TO EDGE OF PAVEMENT2' CONCRETEPAVING EDGE2' CONCRETEPAVING EDGE2% SLOPE2% SLOPEROW ROW30' ROW6'BOULEVARD6'BOULEVARDC5.11AS NOTEDHEC Mar 08, 2022 - 3:16pmCAD FILE: M:\193211\Drawings\Construction Drawings\C5.10-ROADS DETAILS.dwg REVISIONSDATEPROJECT NUMBERHYALITE Engineers, PLLC2304 N 7th Ave. Ste. LBozeman, MT 59715Tel: (406) 587.2781w w w . hyaliteeng. comFax: (406) 522.92252018PARKVIEW CROSSINGS BOZEMAN, MTCAMPECHE SHORES DEVELOPMENT, LLCMARCH 8, 2022193211CONSTRUCTION DRAWINGS - 22x34 originals INFRASTRUCTURE IMPROVEMENTSSCALESHEET TITLEDESIGN BYP.O. BOX 3088GALVESTON, TXAS NOTEDBVROAD DETAILS (CONT.) SCALE: N.T.S.3TYPICAL PULL BOXSCALE: N.T.S.2TYPICAL POLE BASESCALE: N.T.S.7TYPICAL STREET LIGHT FOUNDATIONSCALE: N.T.S.4TYPICAL PULL BOX DIMENSIONSSCALE: N.T.S.6TYPICAL PEDESTRIAN LIGHTSCALE: N.T.S.5TYPICAL CONDUIT BURIALSCALE: N.T.S.1TYPICAL STREET LIGHTHEC Mar 08, 2022 - 3:17pmCAD FILE: M:\193211\Drawings\Construction Drawings\C5.0 ROADS.dwg REVISIONSDATEPROJECT NUMBERHYALITE Engineers, PLLC2304 N 7th Ave. Ste. LBozeman, MT 59715Tel: (406) 587.2781w w w . hyaliteeng. comFax: (406) 522.92252018PARKVIEW CROSSINGS BOZEMAN, MTCAMPECHE SHORES DEVELOPMENT, LLCMARCH 8, 2022193211CONSTRUCTION DRAWINGS - 22x34 originals INFRASTRUCTURE IMPROVEMENTSSCALESHEET TITLEDESIGN BYP.O. BOX 3088GALVESTON, TXAS NOTEDBVLIGHTING DETAILSC5.12 MEMORANDUM ------------------------------------------------------------------------------------------------------------ TO: Brett Megaard, PE Hyalite Engineers 2304 N 7th Ave, Suite L Bozeman, MT 59715 RE: Park View Crossing Infrastructure Improvements DATE: March 14, 2022 ----------------------------------------------------------------------------------------------------------- Mr. Megaard, The City of Bozeman has completed its review of the resubmittal of plans for the above referenced project and the plans are hereby accepted for construction by the City Engineer. All work performed must fully comply with the City’s Design Standards and Specifications Policy unless approved otherwise. Approval of the plans and specifications is hereby given. This acceptance pertains only to the above-referenced infrastructure improvements. Other facilities or improvements shown or referenced on the plans, which may be subject to review and approval requirements of other City, County, State, or Federal agencies have not been reviewed or accepted. Any change in these plans and specifications, other than those listed above, shall be submitted to the City Engineer's office for review and acceptance prior to construction. A Preconstruction Conference shall be conducted by the project engineer with attendance by the Owner's Contractor, the Engineer's Inspector, and the City of Bozeman prior to initiation of construction. Attached is a Preconstruction Meeting Criteria Checklist identifying items that must be addressed or completed prior to scheduling the Preconstruction Conference (note: all permits listed may not be applicable). Shop Drawings reviewed and approved by the Project Engineer shall be submitted to this office at least two working days prior to the preconstruction conference. Attached is a Preconstruction Meeting Agenda identifying topics of discussion to be addressed during the preconstruction meeting. Please contact this office regarding scheduling a date for the preconstruction conference. Prior to initiation of construction, copies of the Contractor's Performance and Payment Bonds, each in an amount equal to 100% of the contract amount, in favor of the Owner, shall be filed with the Owner and the City of Bozeman. Prior to final acceptance by the City of the installed infrastructure, the Project Engineer shall submit a completed, signed and stamped Certified Checklist for Testing & Documentation Requirements for Infrastructure Improvements. Also attached is a copy of the City's Certificate of Completion and Acceptance. This certification shall be accompanied by the following documents: 1) An accurate and complete set of Mylar Record Drawings signed by the Project Engineer, 2) A complete copy of the inspectors daily diary, and 3) A digital format copy of the record drawings. This acceptance is given with the understanding that construction will be initiated within one year of this date. If more than one year elapses before the beginning of construction, it shall be necessary to resubmit the plans and specifications for re-acceptance before initiating any subsequent construction. One set of the plans and specifications bearing the City's endorsement are enclosed. If you have any questions, please contact this office. Sincerely, Karl Johnson Development Review Engineer I cc:  Nick Pericich, Water/Sewer Superintendent  John Vandelinder, Streets Superintendent  Project File - T:\Engineering\Infrastructure Reviews Encl:  Preconstruction Meeting Criteria Checklist  Preconstruction Meeting Agenda  Certified Checklist for Testing & Documentation Requirements for Infrastructure Improvements  Certificate of Completion and Acceptance  City Approved Plans Engineering Report – Park View Crossing Major Subdivision Table of Contents April 2021 Page ii Version 09/24/2021 Table of Contents Table of Contents ........................................................................................................................ ii 1 Introduction ......................................................................................................................... 1 1.1 Purpose of Report ........................................................................................................ 1 1.2 Scope .......................................................................................................................... 1 2 Location and Site Information ............................................................................................. 1 3 Land Use ............................................................................................................................ 2 3.1 Existing ........................................................................................................................ 2 3.2 Proposed ..................................................................................................................... 2 4 Water System ..................................................................................................................... 2 4.1 Water Use Data ........................................................................................................... 2 4.2 Fire Flow ...................................................................................................................... 3 5 Sewer System ..................................................................................................................... 3 5.1 Design Flow Rates ....................................................................................................... 4 6 Stormwater Network ........................................................................................................... 4 6.1 General Design ............................................................................................................ 4 6.2 Hydrologic Methodology............................................................................................... 4 6.3 Detention Basin ........................................................................................................... 5 6.4 Inlets & Storm Sewer ................................................................................................... 7 6.5 Groundwater ................................................................................................................ 7 6.6 System Maintenance ................................................................................................... 7 6.7 Erosion Sediment Control ............................................................................................ 8 6.8 Flooding ....................................................................................................................... 8 References ................................................................................................................................ 9 Engineering Report – Park View Crossing Major Subdivision Introduction April 2021 Page 1 Version 09/24/2021 1 Introduction 1.1 Purpose of Report This report is intended to serve as the design document for the infrastructure improvements associated with the construction of a 44-lot major subdivision. The proposed infrastructure has been designed without accounting for future connections, as the property is bordered to the west by the Gallatin County Regional Park. 1.2 Scope Expansion of existing infrastructure (water and sewer mains) and storm water design elements are within the scope of this report. All improvements analyzed in this report are within the property with proposed connections to existing infrastructure. No off-site improvements are expected. 2 Location and Site Information The property occupies 7.0 acres and is located on the northwestern side of Bozeman and is bordered to the east by Vaquero Parkway, in the NE ¼ of Section 3, Township 2 South, Range 5 East, P.M.M., City of Bozeman, Gallatin County, MT. The existing zoning and the nearby surrounding zoning is R-3. The property is within the service area for municipal water and sewer from the City of Bozeman. Figure 1 - Vicinity map. Engineering Report – Park View Crossing Major Subdivision Land Use April 2021 Page 2 Version 09/24/2021 3 Land Use 3.1 Existing The site is currently a vacant lot with two existing intersection tie-ins – one off of Vaquero Parkway and the other a continuation of Tschache Lane. The majority of the site has been left undisturbed, with parking for the Gallatin County Regional Park just to the south. Of the 7.0-acre property, 0.3 acres is an existing stormwater pond site that was used for the Crossings 2 at Baxter Meadows Phases 4G & 4H. 3.2 Proposed The proposed major subdivision will consist of 44 townhome lots: nine 4-plex units, two 3-plex units and one duplex. A road will be constructed that connects to the intersection of Tschache Lane and Vaquero Parkway and loops to the north to connect back into Vaquero Parkway. The road will surround a majority of the property and will be bordered by the park to the west. All centralized lots will be alley-loaded with water and sewer mains installed within the 30’ alley right- of-way. The exterior lots will be serviced by the loop road. As mentioned previously, both water and sewer mains will connect to existing stub-outs from the improvements associated with Phases 4G & 4H of the Crossings 2 at Baxter Meadows. The existing stormwater pond to the north will be extended to account for the proposed development, with the proposed storm sewer network also connecting to existing stub-outs from previous improvements (Phase 4G & 4H). 4 Water System The proposed water system will tie into existing mains installed during the development of the Crossing 2 at Baxter Meadows Phases 4G & 4H. The water system will be looped into the City of Bozeman water system at two places along Vaquero Parkway. At each end of the exterior loop road (north and south) the water main will continue past the proposed alley and each will end at a fire hydrant near the N-S leg of the loop road. The water main will also be installed within the provided alley right of way. All new water mains will be 8” diameter, class 51 ductile iron pipe. Fire hydrant leads will be 6” diameter ductile iron pipe as well. Type K copper water services will extend 8’ past the property line and be ¾” in diameter. 4.1 Water Use Data Average Daily Flow 44 residential lots at 2.5 persons/dwelling = 110 people 110 people at 170 gpd = 18,700 gpd (425 gpd/lot) Peak Demand Peaking factor = 2.3 (peaking factor per City of Bozeman Design Standards) 18,700 gpd (2.3) = 43,010 gpd Total max day flow = 43,010 gpd / 1440 = 29.9 gpm instantaneously Main Sizing 29.9 GPM (Max Day) + 2000 GPM (Fire Flow) = 2029.9 GPM 2029.9 GPM in 8” Water Main ≈ 14 ft/sec (adequate for fire flow) Engineering Report – Park View Crossing Major Subdivision Sewer System April 2021 Page 3 Version 09/24/2021 29.9 GPM = Negligible velocity within an 8” main Note: The Integrated Water Resources Plan (2013) showed that the typical domestic water usage in a City of Bozeman home was around 45 gpcd. The Bozeman Water Facility Plan (updated 2017) noted that “The domestic use parameter is consistently lower than 70 gpcd for the non-irrigation season”. With irrigation being accounted for in the next section, the above calculations are conservative. Irrigation Demand Assume 1”/week for irrigation of turf areas Assume 4-month irrigation season Building Areas: Nine 4-plex units = 9 (7820 sq. ft.) = 70,380 sq. ft. Two 3-plex units = 2 (6800 sq. ft.) = 13,600 sq. ft. One duplex unit = 4340 sq. ft. Total = 88,320 sq. ft. = 2.03 acres Above calculations include driveway and sidewalk for each unit. Total developable lot area = 4.07 acres Irrigated turf = 2.04 acres 1”/week (16 weeks) = 1.33 ft of irrigation over 2.04 acres Total irrigation = 118,187 cu. ft. (7.48 gal/cu. ft.) = 884,040 gal./year Over 120-day irrigation season, 15 hours of irrigation per day 884,040 gal./year (1 year/120 days) (1 day/15 hrs) (1 hr/60 min) = 8.2 gpm At 8.2 gpm during the summer months 8.2 gpm (60 min/hr) (24 hr/day) = 11,808 gpd Peak hour flow during the summer/irrigation season would be 38.1 gpm. 4.2 Fire Flow Within the design report for The Crossing 2 at Baxter Meadows, the fire hydrants tested for the fire protection plan were each at or above 2,000 GPM for available fire flow. As of April 12, 2021, the City Water Department fire tested the nearby hydrants with the following information; FH#2389 had a static pressure of 90psi and a residual of 82psi and FH#3033 having a pitot pressure of 68psi while flowing approximately 1385 GPM. This results in an available fire flow of approximately 4,460 GPM at 20 psi. See attached for the City’s fire flow documentation. 5 Sewer System During construction of Phases 4G & 4H of the Crossing 2, an 8-inch sewer main stub was extended from a manhole on Vaquero Parkway. This sewer main stub is located at the northern loop road tie in for the proposed development. As this is the low point of the property, the entire sanitary sewer network within Parkview Crossing will drain to this point, and connect to the existing 8” sewer mains in Vaquero Parkway. Engineering Report – Park View Crossing Major Subdivision Stormwater Network April 2021 Page 4 Version 09/24/2021 5.1 Design Flow Rates The average daily flow calculated above is 18,700 gpd (13 gpm). The peak hour flow calculated above is 38.1 gpm. Including infiltration: 150 gallons/acre/day (7 acres) = 1050 gpd = 0.73 gpm Peak hour flow (including infiltration) = 38.83 gpm The proposed 8” gravity mains are capable of flowing 38.83 gpm at minimum slope (0.4%) with a depth of only 1.9” (24% full). This capacity calculation was performed using a Manning’s friction factor of 0.013. As mentioned previously, the gravity network will then discharge into the existing 8” network located in Vaquero Parkway. All sewer main piping will have uniform slope between manholes. Sewer mains have been designed at nearly the same slope as the road centerline grades. Individual sewer services will be provided for each lot within the development. The 4” Schedule 40 PVC sewer services will be extended 8 feet past the property line of each lot. A 4” gravity sewer service on a ¼”/foot grade is capable of supporting flows from each single-family townhome. 6 Stormwater Network This section provides a design basis and hydraulic calculations for sizing storm water facilities for the Parkview Crossings Major Subdivision. The City of Bozeman Design Standards and Specifications Policy and the Montana Post-Construction Storm Water BMP Design Guidance Manual (Peterson, Savage, and Heisler 2017) were used as the primary guidelines for this stormwater drainage design. 6.1 General Design The proposed development will be a combination of roadway and residential lots. The loop road that extends from the intersection of Tschache Lane and Vaquero Parkway will be paved with curb and gutter. The alley that splits the interior lots will be paved with an inverse crown. Stormwater runoff generated from the roadway and residential lots is designed to be collected by the curb and gutter and then directed toward the storm drain inlets. The stormwater that is collected by the paved alley will travel down the centerline and to the curb and gutter to the north. The runoff will then move through the storm sewer system pipes to the detention pond. The detention pond has been designed with an outlet structure to limit stormwater runoff from the developed site to the pre-developed runoff rates. 6.2 Hydrologic Methodology The rational method was used to determine peak runoff rates. The rational formula provides a peak runoff rate which occurs at the time of concentration. Q = CiA Where C = Weighted C Factor i= Storm Intensity (in/hr) A = Area (acres) Q = Runoff (cfs) Engineering Report – Park View Crossing Major Subdivision Stormwater Network April 2021 Page 5 Version 09/24/2021 The storm intensities were developed from the IDF curve found in Figure I-2 of the City of Bozeman Design Standards and Specifications. Runoff coefficients for each basin were calculated using a weighted percentile of impervious and pervious area. The coefficient used are shown in the table below. Table 1 - Runoff coefficients used. RUNOFF COEFFICIENTS Undisturbed 0.2 Impervious 0.9 Time of concentration was determined using the following equation: Tc = 1.87(1.1-C)D1/2 S1/3 Where Tc = Time of Concentration, minutes S= Slope of Basin, % C= Runoff Coefficient D= Length of Basin, ft The modified rational method approach was used to compute runoff volume. This method can be used for storm durations equal or greater than the time of concentration. This method assumes the maximum runoff rate occurs at the time of concentration and continues to the end of the storm. Maximum runoff rates for durations greater than the time of concentration are less than the peak runoff rate because average storm intensities decrease as duration increases. The total runoff volume is computed by multiplying the duration of the storm by the runoff rate. The SCS method, as discussed below, was also used for further analysis of the initial rainfall volume (i.e. the runoff treatment volume). The method outlined in Appendix C of the City of Bozeman Design Standards and Specifications was used to size the detention pond for the 10-yr flood control volume. Hydraflow Hydrographs Extension for AutoCAD was also used to calculate this volume and develop a stage-storage graph for the pond. The program gave a more conservative volume for the 10-year design storm so the weir was sized using this program. The hydrology calculations and pond sizing spreadsheets can be found in Appendix B. 6.3 Detention Basin The City of Bozeman requires infiltration, evapotranspiration or capture for reuse of the runoff generated from the first 0.5 inches of rainfall from a 24-hour storm. A common methodology for estimating the volume of direct runoff from a drainage basin is the SCS method. This method requires basic data similar to the Rational Method: drainage area, a runoff factor, time of concentration, and rainfall. However, the SCS approach is more sophisticated in that it also considers the time distribution of the rainfall and an infiltration rate that decreases during the course of a storm. The SCS method takes into account the Initial Abstraction (Ia) which is all losses before runoff begins. This includes surface depressions, water intercepted by vegetation, Engineering Report – Park View Crossing Major Subdivision Stormwater Network April 2021 Page 6 Version 09/24/2021 evapotranspiration and infiltration. Initial abstraction generally correlates with soil and cover parameters. Through studies of many small watersheds, Ia was found to be approximated by the following empirical equation: Ia = 0.2 x S [eq. 2-2 TR-55] Where S = (1000/CN) – 10 [eq. 2-4 TR-55] According to USDA’s Urban Hydrology for Small Watersheds, the Curve Number associated with soil type B and 1/8 acre residential lots is 85 (Table 2-2a). Using the standard SCS method, S = (1000/85) – 10 = 1.8 inches Ia = 0.2 * 1.8 inches = 0.4 inches Using a 10-year 24-hour rain event in the City of Bozeman the total precipitation (P) is 1.88 inches of which 0.4 inches is lost due to initial abstraction according to USDA’s SCS method. Therefore, this drainage plan includes provision for the first 0.4 inches of rainfall from the 24-hour storm to be retained in surface depressions, intercepted by vegetation, or evapotranspired or infiltrated. The remaining 0.1 inches required to be captured is accounted for by setting the weir elevation in the detention pond 4 inches above the bottom of the pond. This allows the remainder of the first 0.5 inches of rainfall after initial abstraction to be retained (approximately 1944 cubic feet of storage). Pond 5B was designed to be oversized with the improvements for Phases 4G & 4H to account for future development along Vaquero Parkway. However, the exact use of the future development was not known at that time. The density of the proposed property is higher than previously accounted for; thus, the pond will be extended and larger volume provided. As the existing calculations still remain true for Pond 5B (outlet structure, weir, outlet pipe) the calculations will be expanded on and updated to reflect the larger volume. The pond is designed with an outlet structure to limit stormwater runoff from the developed site to the pre-developed runoff rates for the 10-year storm and to not overtop during the 100-year storm. The outlet structure for the pond will be re-located, but the outfall location will remain the same. The original stormwater design (Phases 4G & 4H) accounted for a basin area of 9.48 acres to determine the pre-development flow rate that would be controlled by the outlet structure. This differs from the current 10.71 acre basin area that is proposed. Considering the increase in basin area from the original to the current design and the fact that the outlet structure will not be altered, the detention release rate will be less than the pre-development rate for the larger basin. The method outlined in Appendix C of the City of Bozeman Design Standards and Specifications was used to size the detention pond for the 10-year flood control volume. This method assumes the outlet structure release rate is always equivalent to the pre-development runoff rate, and thus provides a good starting point for overall pond volume. Hydraflow Hydrographs Extension for AutoCAD was also used to calculate the pond volume and develop a stage-discharge graph for the outlet structure. The stage-discharge graph better represents the changing weir flowrate that will occur with the varying water surface elevations in the pond. Per the report generated from the Hydraflow Extension, the weir flow rate will equal the pre-development flow rate at a pond depth of approximately 18 inches (the top of the rectangular weir). Engineering Report – Park View Crossing Major Subdivision Stormwater Network April 2021 Page 7 Version 09/24/2021 In the event of a 100-year storm there is an emergency spillway that will prevent the pond from over topping. This spillway will be lined with riprap to prevent erosion and will outlet directly into the respective outlet ditch. 6.4 Inlets & Storm Sewer Using the Modified Rational Method, a contributing flow to each inlet in the system was determined. The inlet grates were designed to accommodate the 25-year storm event without overtopping a depth 0.15’ below the top of curb or spreading greater than 9 feet. Inlets at sag points were modeled using 50% clogging. Inlets and manholes will have a 9” sump for sediment collection. Storm pipes were sized to accommodate the 100-year storm event and were modeled in Storm and Sanitary Analysis. Pipes are sloped to maintain a minimum velocity of 3 ft/s when flowing full to prevent sediment deposit. The Hydraulic Grade line was plotted throughout the system and pipes were sized to keep the HGL within the pipe during the 25 yr storm and 100 yr storm. A manning’s N of 0.009 was used for the A-2000 Storm pipe within the model per the manufacturer’s specifications. 6.5 Groundwater Groundwater is known to be high in this area. A geotechnical report was done in 2001 that included borings near the pond location. ST-29 near Pond 5B showed depth to groundwater at 3 feet below existing ground. Due to the high groundwater the maximum pond excavation depth for Pond 5B is 2 feet. The depth of the existing Pond 5B will not change, only the overall area of the pond will increase. This is reinforced as GWIC well #226772 is located near the southern parkling lot in the Regional Park, and has its groundwater monitored over the last 15 years. Below is a snippet of the groundwater elevation, showing that the highest value was 5.1 ft deep in 2009, but in the last 5 years, the highest seen is approximately 5.6 ft deep. 6.6 System Maintenance Regular maintenance of stormwater facilities is necessary for proper function of the drainage system. In general, regular mowing of detention pond areas and removal of debris from the outlet structure will be required to maintain functionality of the system. Sediment removal from the pond may be required over time to restore the detention pond volume. Additional maintenance items include removing debris from inlet grates and culverts, cleaning and flushing pipes, cleaning manhole sumps, and establishing ground cover after construction. The detention pond will be maintained by the HOA. Engineering Report – Park View Crossing Major Subdivision Stormwater Network April 2021 Page 8 Version 09/24/2021 6.7 Erosion Sediment Control During construction, stormwater pollutant controls will include silt fencing, straw wattles, rock check dams, and straw bales. Silt fence, straw waddles, or other perimeter protection will be installed on the down gradient edge of disturbed soil. Straw wattles, straw bales, or other erosion protection will be placed near existing and newly installed culverts. Temporary erosion control measures will be installed and continuously maintained for the duration of construction. This project will require acceptance of a Stormwater Pollution Prevention Plan (SWPPP) permit for stormwater discharge associated with construction activity prior to starting any construction. Protection during and immediately after construction, will be controlled in accordance with this permit and the Montana Sediment and Erosion Control Manual. Permanent erosion control will consist of implementation of seeding disturbed areas and placing riprap at pond inlet/outlets. Any visible sediment must be removed from the stormwater system prior to completing construction. 6.8 Flooding Excessive runoff from a large storm event (significantly exceeding the design storm, i.e 100-year) will be routed such that it does not inundate buildings, drainfields or over top the roadway. The stormwater infrastructure including ditches, culverts, and detention pond outlet structures have been analyzed for the 100-year storm. Stormwater that overtops the ponds during a large rain event will flow through the emergency overflow and outlet to the respective ditches. As noted in the original 2007 Spring Ditch Flood Study, no additional analysis is necessary for the Spring Ditch as there is no longer a tie to the Section Line ditch and only continues to collect groundwater though a series of drain pipes installed along Oak Street. With the Spring Ditch now being surrounded by roads, and with no connection to a watershed, confirms that no new flood hazard evaluation is necessary and the previous delineation is still accurate. Even more so now, there is less hazard with the Spring Ditch than was previously noted in the report. Engineering Report – Park View Crossing Major Subdivision References April 2021 Page 9 Version 09/24/2021 References Peterson, Matt, Spencer Savage, and Vern Heisler. 2017. “Montana Post-Construction Storm Water BMP Design Guidance Manual.” Appendix A: Stormwater Drainage Basins STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST ST ST ST ST ST ST STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST B A S I N 1 0 0AREA= 0.39 ACC = 0.54B A S I N 1 0 1AREA= 0.08 ACC = 0.73BASIN 102AREA= 0.70 ACC = 0 . 5 7BASIN 103AREA= 0.68 ACC = 0 . 5 8 BASIN 104AREA= 0.90 ACC = 0.58 BASIN 105AREA= 0.98 ACC = 0.56 B A S I N 1 0 6AREA= 0.98 ACC = 0 . 5 0BASIN 107A R E A = 1 . 4 4 A C C = 0 . 5 7 4715 47104710 470547050'40'80'120'APRIL 2021PARKVIEW CROSSINGSSTORMWATER DRAINAGE BASINS Aug 05, 2021 - 8:40amCAD FILE: M:\193211\Drawings\FIGURES\Storm Basins.dwg 1OF 1 Appendix B: Basin Sizing Calculations (City of Bozeman) Existing SituationMinimum VolumeLand Use Open LandArea 10.71 AcresStorm DurationIntensity Future Runoff Rate Runoff VolumeRelease RateRelease VolumeRequired StorageSlope 2 %(Minutes) (in/hr) Q=CiA (cfs) (cf) (cfs) (cf) (cf)C= 0.2012 1.82 9.767024 0.000 0 7,024Overland Flow Distance 300 ft14 1.65 8.837414 0.000 0 7,414Time of Concentration23min16 1.51 8.097768 0.000 0 7,768Design Storm Frequency 10 year (Table I-3)18 1.40 7.508095 0.000 0 8,095Intensity at Tc 1.19 in/hr (Figure I-3)20 1.31 7.008399 0.000 0 8,399Peak Runoff Rate 2.547 cfs22 1.23 6.588684 0.000 0 8,68424 1.16 6.228953 0.000 0 8,953Proposed Situation26 1.10 5.909207 0.000 0 9,207Land Use Residential28 1.05 5.629449 0.000 0 9,449Area 10.71 Acres30 1.00 5.389680 0.000 0 9,680Slope 1.5 %32 0.96 5.169901 0.000 0 9,901 *C= 0.5034 0.93 4.9610114 2.547 306 9,808Overland Flow Distance 300 ft36 0.89 4.7810318 2.547 611 9,707Time of Concentration17min38 0.86 4.6110515 2.547 917 9,598Design Storm Frequency 10 year (Table I-3)40 0.83 4.4610706 2.547 1,222 9,48342 0.81 4.3210890 2.547 1,528 9,362Intensity at Tc 1.45 in/hr 10-yr (Figure I-3)44 0.78 4.1911069 2.547 1,834 9,2352.35 in/hr 100-yr (Figure I-3)46 0.76 4.0711242 2.547 2,139 9,10348 0.74 3.9611411 2.547 2,445 8,966Peak Runoff Rate 7.79 cfs 10-yr50 0.72 3.8611575 2.547 2,751 8,82512.60 cfs 100-yr52 0.70 3.7611735 2.547 3,056 8,67954 0.69 3.6711891 2.547 3,362 8,529Percent Impervious50%56 0.67 3.5812044 2.547 3,667 8,37658 0.65 3.5012192 2.547 3,973 8,219Runoff Treatment Volume 9719 cf60 0.64 3.4312338 2.547 4,279 8,059(RTV)62 0.63 3.3512480 2.547 4,584 7,89664 0.61 3.2912620 2.547 4,890 7,73066 0.60 3.2212756 2.547 5,196 7,56168 0.59 3.1612890 2.547 5,501 7,38970 0.58 3.1013022 2.547 5,807 7,215Weir Flowrate2.547 cfs72 0.57 3.0413151 2.547 6,112 7,038Weir Width3.5inches74 0.56 2.9913278 2.547 6,418 6,860*10-yr Detention Volume Required - 9901 cfPARKVIEW CROSSINGSDETENTION RELEASE RATEL:\193211\Computations\ON-SITE STORM.xls Appendix C: Original Stormwater Design Report July, 2018 L:\172708\Engineering Reports\Storm Report\Stormwater Report.doc Page 1 The Crossing 2 at Baxter Meadows Subdivision – Phase 4G & 4H Stormwater Report Bozeman, MT Introduction This report provides a design basis and hydraulic calculations for sizing stormwater infrastructure for The Crossing 2 at Baxter Meadows Subdivision – Phase 4G & 4H. The project in total is 5.8 acres of residential development and is located between the intersection of Vaquero Parkway and Baxter Lane to Vaquero Parkway and Davis Lane. Phases 4A through 4F of The Crossing have already been constructed. Stormwater calculations for the entire project (including phase 4G and 4H) were submitted in The Engineering Design Report for The Crossing at Baxter Meadows (March 2013). Generally the stormwater system and calculations have stayed consistent with what was originally submitted, but this report provides updated and additional information including inlet calculations, culvert capacity calculations and pond sizing. Much of this report will reference the Engineering Design Report for The Crossing at Baxter Meadows (March 2013). The City of Bozeman Design Standards and Specifications (March 2004) was used as the primary guideline for this stormwater drainage design along with The 2002 Edition of the Circular 8 of Montana Department of Environmental Quality (MDEQ). General Design Phase 4G and 4H will be a combination of roadway and residential lots. Vaquero Parkway has been designed with curb and gutter as originally designed in 2013. Stormwater runoff generated from the roadway and residential lots is designed to be collected by the curb and gutter and then directed toward the storm drain inlets. The runoff will then move through the storm sewer system pipes to the detention ponds. The detention ponds have been designed with outlet structures to limit stormwater runoff from the developed site to the pre-developed runoff rates. Inlets & Storm Sewer Using the Modified Rational Method, a contributing flow to each inlet in the system was determined. The inlet grates were designed to accommodate the 25-year storm event without overtopping a depth 0.15’ below the top of curb or spreading greater than 9 feet. Inlets at sag points were modeled using 50% clogging. Inlets and manholes will have a 9” sump for sediment collection. To avoid crossing Spring Ditch with the storm sewer, the two northern more inlets (SDI- 100 and SDI-101) were moved south from their original 2013 design location. This change created a larger drainage area that flows north to Existing Pond 7. The additional flowrate and volume was modeled to verify that Pond 7 could handle the added area without exceeding the pre-development flow rate. Storm pipes were sized to accommodate the 100-year storm event and were modeled in Storm and Sanitary Analysis. Pipes are sloped to maintain a minimum velocity of 3 ft/s when flowing full to prevent sediment deposit. The Hydraulic Grade line was plotted throughout the system and pipes were sized to keep the HGL within the pipe during the July, 2018 L:\172708\Engineering Reports\Storm Report\Stormwater Report.doc Page 2 25 yr storm and 100 yr storm. A manning’s N of 0.009 was used for the A-2000 Storm pipe within the model per the manufactures specifications. Stormwater Treatment The City of Bozeman requires infiltration, evapotranspiration or capture for reuse of the runoff generated from the first 0.5 inches of rainfall from a 24 hour storm. A common methodology for estimating the volume of direct runoff from a drainage basin is the SCS method. This method requires basic data similar to the Rational Method: drainage area, a runoff factor, time of concentration, and rainfall. However, the SCS approach is more sophisticated in that it also considers the time distribution of the rainfall and an infiltration rate that decreases during the course of a storm. The SCS method takes into account the Initial Abstraction (Ia) which is all losses before runoff begins. This includes surface depressions, water intercepted by vegetation, evapotranspiration and infiltration. Initial abstraction generally correlates with soil and cover parameters. Through studies of many small watersheds, Ia was found to be approximated by the following empirical equation: Ia = 0.2 x S [eq. 2-2 TR-55] Where S = (1000/CN) – 10 [eq. 2-4 TR-55] According to USDA’s Urban Hydrology for Small Watersheds, the Curve Number associated with soil type B and ¼ acre residential lots is 80 (Table 2-2a). Using the standard SCS method, S = (1000/80) – 10 = 2.5 inches Ia = 0.2 * 2.5 inches = 0.5 inches Using a 10-year 24-hour rain event in the City of Bozeman the total precipitation (P) is 1.88 inches of which 0.5 inches is lost due to initial abstraction according to USDA’s SCS method. Therefore this drainage plan includes provision for the first 0.5 inches of rainfall from the 24-hour storm to be retained in surface depressions, intercepted by vegetation, or evapotranspired or infiltrated Stormwater Detention Ponds Pond 5 and Pond 1A were designed in the original 2013 design report. Pond 1A will remain the same as originally designed but updated calculations are provided for clarity and it has been renamed Pond 1B. Pond 5 is similar to the original design but it has been oversized to account for future development along Vaquero Parkway. This Pond has been renamed Pond 5B and new calculations have been provided. The ponds are designed with outlet structures to limit stormwater runoff from the developed site to the pre-developed runoff rates for the 10-year storm and to not overtop during the 100-year storm. With this phase, additional drainage area will be added to the Existing Pond 7 basin. Pond 7 was originally slightly oversized allowing for this extra volume to be attenuated without exceeding the predeveloped rate. Revised pond calculations modeling the existing pond volume and existing outlet structure can be found in the appendices July, 2018 L:\172708\Engineering Reports\Storm Report\Stormwater Report.doc Page 3 Groundwater Groundwater is known to be high in this area. A geotechnical report was done in 2001 that included borings near both pond location. ST-29 near Pond 5B showed depth to groundwater at 3 feet below existing ground and ST-32 near Pond 1B showed depth to groundwater at 9 feet below existing ground. Due to the high groundwater the maximum pond excavation depth for Pond 5B is 2 feet. Culverts Both culverts under Vaquero Parkway were designed in the 2013 Design Report and modeled in the flood plain study conducted in 2007. Inverts and length changed slightly from the original design so new calculations are provided. Both culverts were modeled in HY-8 for the 25-year storm, 100-year storm, and emergency overflow events. According to the City of Bozeman standards the emergency overflow capacity shall be 100-percent of the whole culvert for the major storm. Both culverts meet this requirement by providing the entire emergency overflow capacity within the culvert and without overtopping the roadway. The headwater depth for the 25-year storm is provided in the culverts calculations and does not exceed 1.5 times the culvert depth. Maintenance Regular maintenance of stormwater facilities is necessary for proper function of the drainage system. In general, regular mowing of detention pond areas and removal of debris from the outlet structure will be required to maintain functionality of the system. Sediment removal from the ponds may be required over time to restore the detention pond volume. Additional maintenance items include removing debris from inlet grates and culverts, cleaning and flushing pipes, cleaning manhole sumps, and establishing ground cover after construction. All of the detention ponds will be maintained by the HOA (as is with the other existing ponds) after the phases have been incorporated into the HOA. Appendices L. Stormwater Drainage Basins M. Sub-Basin Runoff Calculations & Inlet Capacities N. Pipe Profiles with HGL O. Detention Pond Sizing and Outlet Structure Calculations P. Culvert Sizing Appendix D: Existing vs. Proposed Detention Pond Analyses Side by Side Comparison POND 1B (PRE-DEVELOPMENT) Basin Area (ac): 0.78 Pre-Dev C (weighted): 0.20 Overland Distance (ft): 100 Storm Event Intensity Overland Slope (%): 1.0 (yr) (in/hr)A B Gutter Flow (ft): 0.0 2 0.77 0.36 0.6 Pre-Dev. Tc (min): 16.83 5 1.17 0.52 0.64 Storm Event (yr): 2 10 25 100 10 1.46 0.64 0.65 Storm Coeff. A: 0.36 0.64 0.78 1.01 25 1.76 0.78 0.64 Storm Coeff. B:0.60 0.65 0.64 0.67 50 2.13 0.92 0.66 Composite C: 0.20 0.20 0.20 0.20 100 2.37 1.01 0.67 Storm Intensity (in/hr): 0.77 1.46 1.76 2.37 Pre-Dev Qp (cfs):0.12 0.23 0.27 0.37 Equations Used: Qp = C i A (Modified Rational Method) i = a * (DURATION) ^ -(b) (City of Bozeman) Overland Flow tc=((1.8)*(1.1-C)*(D^(1/2)))/(S^(1/3))(FAA, USDOT, A/C 150-5320-5b, 1970) Gutter Flow V=3.28*k*(S^(1/2), where k=0.457 ( not paved) (FHWA HEC 22, EQN. 3-4) POND 5B (PRE-DEVELOPMENT) Basin Area (ac): 3.71 Pre-Dev C (weighted): 0.20 Overland Distance (ft): 300 Storm Event Intensity Overland Slope (%): 1.24 (yr) (in/hr)A B Gutter Flow (ft): 350.0 2 0.54 0.36 0.6 Pre-Dev. Tc (min): 30.63 5 0.80 0.52 0.64 Storm Event (yr): 2 10 25 100 10 0.99 0.64 0.65 Storm Coeff. A: 0.36 0.64 0.78 1.01 25 1.20 0.78 0.64 Storm Coeff. B:0.60 0.65 0.64 0.67 50 1.43 0.92 0.66 Composite C: 0.20 0.20 0.20 0.20 100 1.58 1.01 0.67 Storm Intensity (in/hr): 0.54 0.99 1.20 1.58 Pre-Dev Qp (cfs):0.40 0.74 0.89 1.18 Equations Used: Qp = C i A (Modified Rational Method) i = a * (DURATION) ^ -(b) (City of Bozeman) Overland Flow tc=((1.8)*(1.1-C)*(D^(1/2)))/(S^(1/3))(FAA, USDOT, A/C 150-5320-5b, 1970) Gutter Flow V=3.28*k*(S^(1/2), where k=0.457 (not paved) (FHWA HEC 22, EQN. 3-4) EXISTING POND 7 (PRE-DEVELOPMENT) Basin Area (ac): 5.88 (5.66 from origional pond 7 basin +0.28 new additional area) Post-Dev C (weighted): 0.20 Overland Distance (ft): 300 Storm Event Intensity Overland Slope (%): 1.40 (yr) (in/hr)A B Gutter Flow (ft): 127.0 2 0.58 0.36 0.6 Post-Dev. Tc (min): 27.25 5 0.86 0.52 0.64 Storm Event (yr): 2 10 25 100 10 1.07 0.64 0.65 Storm Coeff. A: 0.36 0.64 0.78 1.01 25 1.29 0.78 0.64 Storm Coeff. B:0.60 0.65 0.64 0.67 50 1.55 0.92 0.66 Composite C: 0.20 0.20 0.20 0.20 100 1.71 1.01 0.67 Storm Intensity (in/hr): 0.58 1.07 1.29 1.71 Post-Dev Qp (cfs):0.68 1.26 1.52 2.02 Equations Used: Qp = C i A (Modified Rational Method) i = a * (DURATION) ^ -(b) (City of Bozeman) Overland Flow tc=((1.8)*(1.1-C)*(D^(1/2)))/(S^(1/3))(FAA, USDOT, A/C 150-5320-5b, 1970) Gutter Flow V=3.28*k*(S^(1/2), where k=0.618 (paved) (FHWA HEC 22, EQN. 3-4) POND 5B FUTURE (PRE-DEVELOPMENT) Basin Area (ac): 9.48 Post-Dev C (weighted): 0.20 Overland Distance (ft): 300 Storm Event Intensity Overland Slope (%): 1.24 (yr) (in/hr)A B Gutter Flow (ft): 350.0 2 0.54 0.36 0.6 Post-Dev. Tc (min): 30.63 5 0.80 0.52 0.64 Storm Event (yr): 2 10 25 100 10 0.99 0.64 0.65 Storm Coeff. A: 0.36 0.64 0.78 1.01 25 1.20 0.78 0.64 Storm Coeff. B:0.60 0.65 0.64 0.67 50 1.43 0.92 0.66 Composite C: 0.20 0.20 0.20 0.20 100 1.58 1.01 0.67 Storm Intensity (in/hr): 0.54 0.99 1.20 1.58 Post-Dev Qp (cfs):1.02 1.88 2.27 3.00 Equations Used: Qp = C i A (Modified Rational Method) i = a * (DURATION) ^ -(b) (City of Bozeman) Overland Flow tc=((1.8)*(1.1-C)*(D^(1/2)))/(S^(1/3))(FAA, USDOT, A/C 150-5320-5b, 1970) Gutter Flow V=3.28*k*(S^(1/2), where k=0.618 (paved) (FHWA HEC 22, EQN. 3-4) THE CROSSING AT BAXTER MEADOWS SUBDIVISION PHASE 4G & 4H PRE-DEVELOPMENT POND BASIN FLOWS Storm Coeff. (i) Storm Coeff. (i) Storm Coeff. (i) Storm Coeff. (i) L:\172708\Computations\STORMWATER\Stormwater Calculations.xls Original Design EXISTING POND 5B (REQUIRED) Basin Area (ac): 10.71 Pre-Dev C (weighted): 0.20 Overland Distance (ft): 300 Storm Event Intensity Overland Slope (%): 2.00 (yr) (in/hr)A B Gutter Flow (ft): 0.0 2 0.64 0.36 0.6 Pre-Dev. Tc (min): 23.14 5 0.96 0.52 0.64 Storm Event (yr): 2 10 25 100 10 1.19 0.64 0.65 Storm Coeff. A: 0.36 0.64 0.78 1.01 25 1.44 0.78 0.64 Storm Coeff. B:0.60 0.65 0.64 0.67 50 1.73 0.92 0.66 Composite C: 0.20 0.20 0.20 0.20 100 1.91 1.01 0.67 Storm Intensity (in/hr): 0.64 1.19 1.44 1.91 Pre-Dev Qp (cfs):1.37 2.55 3.07 4.10 Equations Used: Qp = C i A (Modified Rational Method) i = a * (DURATION) ^ -(b) (City of Bozeman) Overland Flow tc=((1.8)*(1.1-C)*(D^(1/2)))/(S^(1/3))(FAA, USDOT, A/C 150-5320-5b, 1970) Gutter Flow V=3.28*k*(S^(1/2), where k=0.457 ( not paved) (FHWA HEC 22, EQN. 3-4) PARKVIEW CROSSINGS MAJOR SUBDIVISION PRE-DEVELOPMENT POND BASIN FLOWS Storm Coeff. (i) L:\193211\Computations\Stormwater Calculations.xls Current Design Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 07 / 25 / 2018 Hyd. No. 5 POND 5B Hydrograph type = Reservoir Peak discharge = 0.472 cfs Storm frequency = 10 yrs Time to peak = 0.40 hrs Time interval = 1 min Hyd. volume = 2,364 cuft Inflow hyd. No. = 2 - POND 5B Max. Elevation = 4699.62 ft Reservoir name = POND 5B Max. Storage = 2,062 cuft Storage Indication method used. 7 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 Q (cfs) Time (hrs) POND 5B Hyd. No. 5 -- 10 Year Hyd No. 5 Hyd No. 2 Total storage used = 2,062 cuft Existing Pond Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Thursday, 08 / 5 / 2021 Hyd. No. 5 POND 5B Hydrograph type = Reservoir Peak discharge = 1.293 cfs Storm frequency = 10 yrs Time to peak = 0.52 hrs Time interval = 1 min Hyd. volume = 7,848 cuft Inflow hyd. No. = 2 - POND 5B Max. Elevation = 4700.22 ft Reservoir name = POND 5B Max. Storage = 6,700 cuft Storage Indication method used. 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5 6.0 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 Q (cfs) Time (hrs) POND 5B Hyd. No. 5 -- 10 Year Hyd No. 5 Hyd No. 2 Total storage used = 6,700 cuft Proposed Pond Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Wednesday, 07 / 25 / 2018 Hyd. No. 5 POND 5B Hydrograph type = Reservoir Peak discharge = 0.953 cfs Storm frequency = 100 yrs Time to peak = 0.40 hrs Time interval = 1 min Hyd. volume = 3,907 cuft Inflow hyd. No. = 2 - POND 5B Max. Elevation = 4699.98 ft Reservoir name = POND 5B Max. Storage = 3,280 cuft Storage Indication method used. 14 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 Q (cfs) Time (hrs) POND 5B Hyd. No. 5 -- 100 Year Hyd No. 5 Hyd No. 2 Total storage used = 3,280 cuft Existing Pond Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Thursday, 08 / 5 / 2021 Hyd. No. 5 POND 5B Hydrograph type = Reservoir Peak discharge = 3.838 cfs Storm frequency = 100 yrs Time to peak = 0.48 hrs Time interval = 1 min Hyd. volume = 12,856 cuft Inflow hyd. No. = 2 - POND 5B Max. Elevation = 4700.74 ft Reservoir name = POND 5B Max. Storage = 10,198 cuft Storage Indication method used. 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5 6.0 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 14.00 14.00 Q (cfs) Time (hrs) POND 5B Hyd. No. 5 -- 100 Year Hyd No. 5 Hyd No. 2 Total storage used = 10,198 cuft Proposed Pond Pond Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 04 / 9 / 2021 Pond No. 2 - POND 5B Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 4699.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 4699.00 2,921 0 0 1.00 4700.00 3,804 3,352 3,352 2.00 4701.00 4,787 4,286 7,638 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in)= 0.00 0.00 0.00 0.00 Span (in)= 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Invert El. (ft)= 0.00 0.00 0.00 0.00 Length (ft)= 0.00 0.00 0.00 0.00 Slope (%)= 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a No No No Crest Len (ft)= 0.29 4.00 0.00 0.00 Crest El. (ft)= 4699.01 4700.50 0.00 0.00 Weir Coeff.= 3.33 3.33 3.33 3.33 Weir Type = Rect Ciplti --- --- Multi-Stage = No No No No Exfil.(in/hr)= 0.000 (by Contour) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 Stage (ft) 0.00 4699.00 0.20 4699.20 0.40 4699.40 0.60 4699.60 0.80 4699.80 1.00 4700.00 1.20 4700.20 1.40 4700.40 1.60 4700.60 1.80 4700.80 2.00 4701.00 Elev (ft) Discharge (cfs) Stage / Discharge Total Q Existing Pond Existing Pond Pond Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Thursday, 11 / 11 / 2021 Pond No. 2 - POND 5B Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 4699.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 4699.00 4,542 0 0 1.00 4700.00 5,952 5,231 5,231 2.00 4701.00 7,462 6,692 11,923 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in)= 0.00 0.00 0.00 0.00 Span (in)= 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Invert El. (ft)= 0.00 0.00 0.00 0.00 Length (ft)= 0.00 0.00 0.00 0.00 Slope (%)= 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a No No No Crest Len (ft)= 0.29 4.00 0.00 0.00 Crest El. (ft)= 4699.33 4700.83 0.00 0.00 Weir Coeff.= 3.33 3.33 3.33 3.33 Weir Type = Rect Ciplti --- --- Multi-Stage = No No No No Exfil.(in/hr)= 0.000 (by Contour) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 Stage (ft) 0.00 4699.00 0.20 4699.20 0.40 4699.40 0.60 4699.60 0.80 4699.80 1.00 4700.00 1.20 4700.20 1.40 4700.40 1.60 4700.60 1.80 4700.80 2.00 4701.00 Elev (ft) Discharge (cfs) Stage / Discharge Total Q Proposed Pond Proposed Pond Appendix E: Storm Drain Inlet Calculations 0.90 0.50 0.20 Note: Coefficients obtained from CoB Design Standards Table I-1 BASIN 100 Post-Development Weighted C-Value (Cw) Area Runoff (Acres) Coefficient Calculations Asphalt/Concrete 0.06 0.90 0.05 Dense Residential 0.31 0.50 0.16 Open Land 0.02 0.20 0.00 Totals 0.39 0.21 Cw =0.54 BASIN 101 Post-Development Weighted C-Value (Cw) Area Runoff (Acres) Coefficient Calculations Asphalt/Concrete 0.06 0.90 0.06 Open Land 0.02 0.20 0.00 Totals 0.08 0.06 Cw =0.73 BASIN 102 Post-Development Weighted C-Value (Cw) Area Runoff (Acres) Coefficient Calculations Asphalt/Concrete 0.20 0.90 0.18 Dense Residential 0.40 0.50 0.20 Open Land 0.10 0.20 0.02 Totals 0.70 0.40 Cw =0.57 BASIN 103 Post-Development Weighted C-Value (Cw) Area Runoff (Acres) Coefficient Calculations Asphalt/Concrete 0.17 0.90 0.15 Dense Residential 0.46 0.50 0.23 Open Land 0.05 0.20 0.01 Totals 0.68 0.39 Cw =0.58 MAJOR SUBDIVISION Weighted Runoff Coefficients PARKVIEW CROSSINGS Asphalt/Concrete Dense Residential Open Land L:\193211\Computations\Stormwater Calculations.xls BASIN 104 Post-Development Weighted C-Value (Cw) Area Runoff (Acres) Coefficient Calculations Asphalt/Concrete 0.27 0.90 0.24 Dense Residential 0.51 0.50 0.26 Open Land 0.12 0.20 0.02 Totals 0.90 0.52 Cw =0.58 BASIN 105 Post-Development Weighted C-Value (Cw) Area Runoff (Acres) Coefficient Calculations Asphalt/Concrete 0.24 0.90 0.22 Dense Residential 0.61 0.50 0.31 Open Land 0.13 0.20 0.03 Totals 0.98 0.55 Cw =0.56 BASIN 106 Post-Development Weighted C-Value (Cw) Area Runoff (Acres) Coefficient Calculations Dense Residential 0.98 0.50 0.49 Totals 0.98 0.49 Cw =0.50 BASIN 107 Post-Development Weighted C-Value (Cw) Area Runoff (Acres) Coefficient Calculations Asphalt/Concrete 0.45 0.90 0.41 Dense Residential 0.72 0.50 0.36 Open Land 0.27 0.20 0.05 Totals 1.44 0.82 Cw =0.57 EXISTING POND 5B Post-Development Weighted C-Value (Cw) Area Runoff (Acres) Coefficient Calculations Existing (4G/4H) 3.71 0.51 1.89 Proposed 7.00 0.49 3.43 Totals 10.71 5.32 Cw =0.50 L:\193211\Computations\Stormwater Calculations.xls Storm Drain Inlet ID#Basin 10-Yr Flow (cfs) 25-Yr Flow (cfs) 100-Yr Flow (cfs) SDI-100 100 0.43 0.52 0.70 SDI-102 102 0.60 0.72 0.97 SDI-103 103 0.54 0.64 0.86 SDI-104 104 0.78 0.94 1.27 SDI-105 105 0.74 0.89 1.20 SDI-106 107 1.03 1.25 1.66 PARKVIEW CROSSINGS MAJOR SUBDIVISION SDI FLOWS Label Inlet TypeDischarge (ft³/s)Spread (ft)Gutter Width (ft)Road Slope (%)Gutter Cross Slope (%)Road Cross Slope (%)Grate Width (ft)Grate Length (ft) Grate TypeCurb Opening Length (ft)Opening Height (ft)Inlet Efficiency (%)Water Depth at Curb (in)100 - 25YR SAG 0.52 4.7 1.5 1.00% 6.25% 3.00% 1.46 2.94 Curved Vaned 2.75 0.5 100 2.3100 - 100YR SAG 0.70 5.6 1.5 1.00% 6.25% 3.00% 1.46 2.94 Curved Vaned 2.75 0.5 100 2.6102 - 25YR ON GRADE 0.72 4.9 1.5 0.70% 6.25% 3.00% 1.46 2.94 Curved Vaned 2.75 0.5 82.4 2.4102 - 100YR ON GRADE 0.97 5.6 1.5 0.70% 6.25% 3.00% 1.46 2.94 Curved Vaned 2.75 0.5 80.0 2.6103 - 25YR ON GRADE 0.64 4.7 1.5 0.70% 6.25% 3.00% 1.46 2.94 Curved Vaned 2.75 0.5 84.0 2.3103- 100YR ON GRADE 0.86 5.7 1.5 0.70% 6.25% 3.00% 1.46 2.94 Curved Vaned 2.75 0.5 80.2 2.6104 - 25YR ON GRADE 0.94 5.1 1.5 1.00% 6.25% 3.00% 1.46 2.94 Curved Vaned 2.75 0.5 79.0 2.4104 - 100YR ON GRADE 1.27 5.8 1.5 1.00% 6.25% 3.00% 1.46 2.94 Curved Vaned 2.75 0.5 73.6 2.7105 - 25YR ON GRADE 0.89 5.0 1.5 1.00% 6.25% 3.00% 1.46 2.94 Curved Vaned 2.75 0.5 79.3 2.4105 - 100YR ON GRADE 1.20 5.7 1.5 1.00% 6.25% 3.00% 1.46 2.94 Curved Vaned 2.75 0.5 74.5 2.6106 - 25YR SAG 1.25 7.8 1.5 0.70% 6.25% 3.00% 1.46 2.94 Curved Vaned 2.75 0.5 100 3.4106 - 100YRSAG1.669.31.50.70%6.25%3.00%1.462.94Curved Vaned2.750.51003.9PARKVIEW CROSSINGSSTORM DRAIN INLET SPREAD CALCSMAJOR SUBDIVISION Equations Used: Qp = C i A (Modified Rational Method) i = a * (DURATION) ^ -(b) (City of Bozeman) Overland Flow tc=((1.8)*(1.1-C)*(D^(1/2)))/(S^(1/3)) (City of Bozeman) Gutter Flow V=3.28*k*(S^(1/2), where k=0.618 (paved) (FHWA HEC 22, Eqn 3-4) BASIN 100 Basin Area (ac): 0.39 Post-Dev C (weighted): 0.54 Overland Distance (ft): 130 Storm Event Intensity Overland Slope (%): 1.8 (yr) (in/hr) A B Gutter Flow Distance (ft): 115.0 2 1.03 0.36 0.6 Gutter Flow Slope (%): 1.0 5 1.60 0.52 0.64 Post-Dev. Tc (min): 10.3 10 2.01 0.64 0.65 Storm Event (yr): 2 10 25 100 25 2.40 0.78 0.64 Storm Coeff. A: 0.36 0.64 0.78 1.01 50 2.94 0.92 0.66 Storm Coeff. B: 0.60 0.65 0.64 0.67 100 3.28 1.01 0.67 Composite C: 0.54 0.54 0.54 0.54 Storm Intensity (in/hr): 1.03 2.01 2.40 3.28 Post-Dev Qp (cfs):0.22 0.43 0.52 0.70 BASIN 101 Basin Area (ac): 0.08 Post-Dev C (weighted): 0.73 Overland Distance (ft): 30 Overland Slope (%): 2.0 Storm Event Intensity Gutter Flow Distance (ft): 115.0 (yr) (in/hr) A B Gutter Flow Slope (%): 1.0 2 1.88 0.36 0.6 Post-Dev. Tc (min): 3.8 5 3.03 0.52 0.64 Storm Event (yr): 2 10 25 100 10 3.83 0.64 0.65 Storm Coeff. A: 0.36 0.64 0.78 1.01 25 4.54 0.78 0.64 Storm Coeff. B: 0.60 0.65 0.64 0.67 50 5.66 0.92 0.66 Composite C: 0.73 0.73 0.73 0.73 100 6.38 1.01 0.67 Storm Intensity (in/hr): 1.88 3.83 4.54 6.38 Post-Dev Qp (cfs):0.12 0.24 0.28 0.40 BASIN 102 Basin Area (ac): 0.70 Post-Dev C (weighted): 0.57 Overland Distance (ft): 190 Overland Slope (%): 1.4 Storm Event Intensity Gutter Flow Distance (ft): 470.0 (yr) (in/hr) A B Gutter Flow Slope (%): 0.7 2 0.79 0.36 0.6 Post-Dev. Tc (min): 16.3 5 1.20 0.52 0.64 Storm Event (yr): 2 10 25 100 10 1.49 0.64 0.65 Storm Coeff. A: 0.36 0.64 0.78 1.01 25 1.79 0.78 0.64 Storm Coeff. B: 0.60 0.65 0.64 0.67 50 2.17 0.92 0.66 Composite C: 0.57 0.57 0.57 0.57 100 2.41 1.01 0.67 Storm Intensity (in/hr): 0.79 1.49 1.79 2.41 Post-Dev Qp (cfs):0.31 0.60 0.72 0.97 BASIN 103 Basin Area (ac): 0.68 Post-Dev C (weighted): 0.58 Overland Distance (ft): 280 Overland Slope (%): 1.2 Storm Event Intensity Gutter Flow Distance (ft): 405.0 (yr) (in/hr) A B Gutter Flow Slope (%): 0.7 2 0.72 0.36 0.6 Post-Dev. Tc (min): 18.8 5 1.09 0.52 0.64 Storm Event (yr): 2 10 25 100 10 1.36 0.64 0.65 Storm Coeff. A: 0.36 0.64 0.78 1.01 25 1.64 0.78 0.64 Storm Coeff. B: 0.60 0.65 0.64 0.67 50 1.98 0.92 0.66 Composite C: 0.58 0.58 0.58 0.58 100 2.20 1.01 0.67 Storm Intensity (in/hr): 0.72 1.36 1.64 2.20 Post-Dev Qp (cfs):0.28 0.54 0.64 0.86 PARKVIEW CROSSINGS POST-DEVELOPMENT SUB BASIN FLOWS MAJOR SUBDIVISION Storm Coeff. (i) Storm Coeff. (i) Storm Coeff. (i) Storm Coeff. (i) L:\193211\Computations\Stormwater Calculations.xls BASIN 104 Basin Area (ac): 0.90 Post-Dev C (weighted): 0.58 Overland Distance (ft): 300 Overland Slope (%): 2.0 Storm Event Intensity Gutter Flow Distance (ft): 400.0 (yr) (in/hr) A B Gutter Flow Slope (%): 1.0 2 0.79 0.36 0.6 Post-Dev. Tc (min): 16.2 5 1.20 0.52 0.64 Storm Event (yr): 2 10 25 100 10 1.50 0.64 0.65 Storm Coeff. A: 0.36 0.64 0.78 1.01 25 1.81 0.78 0.64 Storm Coeff. B: 0.60 0.65 0.64 0.67 50 2.19 0.92 0.66 Composite C: 0.58 0.58 0.58 0.58 100 2.43 1.01 0.67 Storm Intensity (in/hr): 0.79 1.50 1.81 2.43 Post-Dev Qp (cfs):0.41 0.78 0.94 1.27 BASIN 105 Basin Area (ac): 0.98 Post-Dev C: 0.56 Overland Distance (ft): 300 Overland Slope (%): 2.0 Storm Event Intensity Gutter Flow Distance (ft): 670.0 (yr) (in/hr) A B Gutter Flow Slope (%): 1.0 2 0.72 0.36 0.6 Post-Dev. Tc (min): 18.9 5 1.09 0.52 0.64 Storm Event (yr): 2 10 25 100 10 1.36 0.64 0.65 Storm Coeff. A: 0.36 0.64 0.78 1.01 25 1.63 0.78 0.64 Storm Coeff. B: 0.60 0.65 0.64 0.67 50 1.97 0.92 0.66 Composite C: 0.56 0.56 0.56 0.56 100 2.19 1.01 0.67 Storm Intensity (in/hr): 0.72 1.36 1.63 2.19 Post-Dev Qp (cfs):0.39 0.74 0.89 1.20 BASIN 106 Basin Area (ac): 0.98 Post-Dev C: 0.50 Overland Distance (ft): 200 Overland Slope (%): 2.0 Storm Event Intensity Gutter Flow Distance (ft): 0.0 (yr) (in/hr) A B Gutter Flow Slope (%): 0.0 2 0.94 0.36 0.6 Post-Dev. Tc (min): 12.1 5 1.45 0.52 0.64 Storm Event (yr): 2 10 25 100 10 1.81 0.64 0.65 Storm Coeff. A: 0.36 0.64 0.78 1.01 25 2.17 0.78 0.64 Storm Coeff. B: 0.60 0.65 0.64 0.67 50 2.64 0.92 0.66 Composite C: 0.50 0.50 0.50 0.50 100 2.95 1.01 0.67 Storm Intensity (in/hr): 0.94 1.81 2.17 2.95 Post-Dev Qp (cfs):0.46 0.89 1.06 1.45 BASIN 107 Basin Area (ac): 1.44 Post-Dev C: 0.57 Overland Distance (ft): 300 Overland Slope (%): 1.0 Storm Event Intensity Gutter Flow Distance (ft): 465.0 (yr) (in/hr) A B Gutter Flow Slope (%): 0.7 2 0.67 0.36 0.6 Post-Dev. Tc (min): 21.1 5 1.01 0.52 0.64 Storm Event (yr): 2 10 25 100 10 1.26 0.64 0.65 Storm Coeff. A: 0.36 0.64 0.78 1.01 25 1.52 0.78 0.64 Storm Coeff. B: 0.60 0.65 0.64 0.67 50 1.83 0.92 0.66 Composite C: 0.57 0.57 0.57 0.57 100 2.03 1.01 0.67 Storm Intensity (in/hr): 0.67 1.26 1.52 2.03 Post-Dev Qp (cfs):0.55 1.03 1.25 1.66 Storm Coeff. (i) Storm Coeff. (i) Storm Coeff. (i) Storm Coeff. (i) L:\193211\Computations\Stormwater Calculations.xls