Loading...
HomeMy WebLinkAbout026_E0.2_Electrical Site PlanA D 1 3 4 BUILDING EWP3 CT EWP1 METER PANEL 'MDP' EWP3 +10'-0" AFF +15'-4" AFF BB1 BB1 BB1 BB1 BB1 +12' AFF BB1 EL1 EL1 EL1 EL1 19' - 9 15/16"19' - 0"19' - 0"19' - 0"19' - 0"19' - 0"19' - 0"19' - 0"BB1 BB1 11' - 3 9/32"B C A. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT OF MATERIALS. B. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF FLOORS, WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED WORK DEPICTED IN THESE DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR ALL PATCHING OF HOLES TO THE SATISFACTION OF THE ARCHITECT/ENGINEER. C. CONTRACTOR IS FULLY RESPONSIBLE FOR FOLLOWING ALL APPLICABLE CODES AND STANDARDS, AS WELL AS ALL LOCAL ADDENDUM TO THOSE CODES AND STANDARDS, WHETHER SPECIFICALLY SHOWN ON THESE DRAWINGS OR NOT. GENERAL ELECTRICAL NOTES: PROJECT # SHEET NUMBERREVISION:DATE 618 N Wallace | Bozeman, MT 59715DRAFT NOT FOR CONSTRUCTION This drawing is not intended nor shall it be used for construction purposes unless the signed professional stamp of a regisered architect employed at MINARIK Architecture, Inc. is affixed above. Consultant:971−319−6249 | www.minarikarch.comProject Status:© 2024 MINARIK Architecture, Inc ALL RIGHTS RESERVED These Drawings are the Property of MINARIK Architecture, Inc and are not to be used or reproduced in any manner without prior written permission.2/7/2025 1:52:06 PM2403 E0.2Mill Building RenovationBangtail Partners, LLCBozeman, Montana02/07/2025 ELEC - SITE PLANSite Permit SetN 1/8" = 1'-0" ELEC - LEVEL 1 - SITE PLAN1 KEYED NOTES 1 NEW UTILITY TRANSFORMER EXPECTED LOCATION ON EXISTING POWER POLE.REVISION DATE REASON FOR ISSUE 02/07/2025