HomeMy WebLinkAbout016_L3.1_Landscape Plan DetailsNOTES:
1.STEEL TYPE: NATURAL STEEL
2.EDGER SIZE: 1/8" THICKNESS X 6" DEPTH
3.SET ALL EDGING 1/2'' ABOVE FINISH GRADE AS SHOWN.
4.EDGING SHALL ABUT ALL WALKS, PATIOS, CONCRETE, OR DRIVES AT A
PERPENDICULAR ANGLE, AND SHALL BE FLUSH WITH GRADES OF
ADJACENT FINISHED CONCRETE SURFACES.
5.ALL JOINTS TO BE SECURELY STAKED AND WELDED.
6.ALL EDGER CORNERS TO BE CLEANLY BENT OR SECURED WITH CORNER
STAKES - DO NOT BUTT JOIN END PIECES OF EDGER AT CORNERS WITHOUT
CORNERSTAKE.
7.LAYOUT AND INSTALLATION OF EDGER TO BE TRUE TO PLAN LAYOUT.
8.SPLICE JOINTS/TABS NOT TO BE USED AT TERMINATION POINTS OF EDGER,
SUCH AS AT HARDSCAPE. "END STAKES" REQUIRED AT ALL END JOINTS.
TURF GRASS - SEE PLANTING NOTES
NATIVE SEED MIX - SEE PLANTING NOTES
6" WELDED STEEL EDGER
18" STEEL REBAR OR ANGLE IRON12"STEEL EDGING - 3/8" THICK X 4" DEEP MIN.
- BLACK FINISH. STEEL WITH "L" SHAPED
ENDS AND INSERT WEDGES NOT
ACCEPTABLE
18" STAKES @ 30" O.C. ON LAWN SIDE
COMPACTED OR UNDISTURBED
SUBGRADE PER CIVIL
FINISH GRADE - CRUSHED STONE - HOLD 3/4"
BELOW TOP OF EDGING
FINISHED GRADE - HOLD 1/2" BELOW TOP OF
EDGING
SECTION
NOTES:
1.MULCH SHOULD BE 4" DEEP.
2.ALL TREES 3" DIAMETER OR LARGER MAY BE STAKED FOR ONE YEAR IF
PROPOSED BY LANDSCAPE CONTRACTOR AND/OR APPROVED BY OWNER'S
REPRESENTATIVE.
DO NOT CUT LEADER
PLANT TREE W/ TOP OF ROOTBALL
1-2" ABOVE FINAL GRADE
APPLY MULCH 4" DEEP
4" HEIGHT WATER SAUCER IN
NON-TURF AREAS
BACKFILL WITH 70% TOPSOIL,
30% ORGANIC COMPOST
AFTER TREE IS SET IN PLANTING
PIT, REMOVE ALL TWINE & WIRE
FROM TOP & SIDES OF ROOTBALL.
PULL BURLAP BACK 1/3 (MIN.)
SET ROOTBALL ON UNDISTURBED
SUBGRADE. DO NOT OVER-EXCAVATE.
PRUNE DAMAGED OR DEAD
WOOD AS DIRECTED BY OWNERS
REPRESENTATIVE
2-3"
2-3X Ø ROOTBALL
DO NOT CUT LEADER-PRUNE
ONLY DAMAGED OR DEAD WOOD
APPROVED TRUNK ATTACHMENT
DOUBLE STRAND GALVANIZED WIRE
PROVIDE 3 GUY SYSTEMS EQUALLY
SPACED AROUND TREE, AS PER DIAGRAM
PLACE 3 4"Ø WHITE PVC, 36'' LENGTH, ON ALL
GUYING
UNDISTURBED SUBGRADE
SET ROOT BALL ON EXISTING UNDISTURBED
SUBGRADE-DO NOT OVER-EXCAVATE
BACKFILL WITH 70% TOPSOIL,
30% ORGANIC COMPOST
AFTER TREE IS SET IN PLANTING PIT,
REMOVE ALL TWINE & WIRE FROM TOP &
SIDES OF ROOT BALL PULL BURLAP
BACK 13 (MIN.)
SPECIFIED STAKES DRIVEN AT AN
ANGLE, FLUSH WITH GRADE
4'' HEIGHT WATER SAUCER IN NON-TURF
AREAS
PLANT TREE W/ TOP OF ROOT BALL 3''
ABOVE FINAL GRADE
4'' DEPTH MULCH RING UNLESS IN TURF
AREAS (SEE BELOW)
NOTES:
1.PULL MULCH BACK 2" TO 3" FROM TRUNK OF TREE.
2.INSTALL SPECIFIED MULCH TO DRIP LINE OF TREE WHERE PLANTED
IN LAWN AREAS. MULCH TO BE 2" DEEP IN LAWN AREAS.
3.DO NOT PROVIDE WATER BASIN IN IRRIGATED LAWN AREAS.
2-3"
2-3X Ø ROOTBALL
NORTH
EW
CONCRETE CURB OR SIDEWALK
(IF APPLICABLE)
APPLY MULCH 4" DEEP
REMOVE CONTAINER
FILL PIT WITH SPECIFIED SOIL MIX.
NOTES:
1.ANY BROKEN OR CRUMBLING ROOTBALLS WILL BE REJECTED.
2.REMOVING THE CONTAINERS WILL NOT BE AN EXCUSE FOR DAMAGED
ROOTBALLS.
3.HOLD GRADE 1'' BELOW EDGE OF WALK OR CURB.
PRUNE ALL DAMAGED OR DEAD WOOD
IMMEDIATELY PRIOR TO PLANTING.
SET SHRUB 1" HIGHER THAN THE
GRADE AT WHICH IT GREW.
DIG PLANT PIT TWICE AS WIDE AS THE
CONTAINER, MIN.
ROUGHEN SIDES OF PLANT PIT SCORE
SIDES OF ROOTBALL OF ROOTBOUND
PLANTS ONLY.1"2'-0" MIN.
2X Ø ROOTBALL
151
2"
EDGE OF BED, CURB, OR WALK
PLANT LOCATION
NOTES:
1.ALIGN FRONT ROW PARALLEL TO BED LINE.
A B C D
6''5''6''6''6''
8''7''6''8''8''
12''12''8''10''12''
18''9''18''18''
24''24''18''21''24''
30''26''15''30''30''
36''31''30''36''36''
48''48''30''42''48''
60''52''36''60''60''
PLANT SPACING
AD D BCCCA60°
NOTES:
1.ALL WORK TO BE DONE AT TIME OF PLANTING.
2.PEEL BACK ONLY TOP OF BURLAP REQUIRED TO PERFORM WORK. REPLACE
BURLAP BEFORE MOVING TREE INTO PLANTING PIT. DO NOT REMOVE WIRE
BASKET UNTIL INSIDE PLANTING PIT.
3.MEASURE NEW HEIGHT OF ROOTBALL AND DIG PLANTING PIT SO FINAL TOP
ROOTBALL GRADE IS 3'' ABOVE FINAL GRADE SURROUNDING BALL.
FINAL TOP ROOTBALL GRADEGRAFTED
NON-GRAFTED
LEAVE PROTECTIVE WRAPPING/ COVER ON TREE
TRUNK UNTIL PLANTING
REMOVE ADVENTITIOUS ROOTS FROM NEWLY
EXPOSED PORTION OF TREE TRUNK
CAREFULLY REMOVE ANY SOIL ABOVE BOTTOM 13OF GRAFT
CAREFULLY LOCATE TOP OF ROOT CROWN WITH
BLUNT HAND TOOLS TO DETERMINE FULL HEIGHT
OF GRAFT. REPLACE SOIL TO BOTTOM ONE THIRD
OF GRAFT AS SHOWN.
CAREFULLY REMOVE ANY SOIL HIGHER THAN 1''
ABOVE TOP OF ROOT CROWN
CAREFULLY LOCATE TOP OF ROOT CROWN WITH
BLUNT HAND TOOLS TO DETERMINE LOCATION OF
TOP OF ROOT CROWN. REPLACE SOIL AROUND
TRUNK TO FINAL TOP ROOTBALL. GRADE AS
SHOWN.
FINAL TOP ROOTBALL GRADE
LEAVE PROTECTIVE WRAPPING/ COVER ON TREE
TRUNK UNTIL PLANTING
REMOVE ADVENTITIOUS ROOTS FROM NEWLY
EXPOSED PORTION OF TREE TRUNK
1"GRAFT2/3NOTES:
1.BIKE RACK: MODEL GREEN THEORY SIT BIKE RACK.
2.SEE MANUFACTURER SPECS FOR RECOMMENDED SURFACE MOUNTING.
BRUSHED CONCRETE OR
EQUAL±3"±4"SECTION
COMPACTED ROAD BASE PER
CIVIL
COMPACTED SUBGRADE PER
CIVIL
SLOPE PER PLAN
7"31"PHOTO: SIT BIKE RACKS
STEEL EDGING6 SCALE: 1" = 1'
STEEL EDGING & CRUSHED STONE7 SCALE: 1" = 1'
DECIDUOUS TREE PLANTING1 SCALE: 1/4" = 1'
EVERGREEN TREE PLANTING3 SCALE: 1/4" = 1'
SHRUB PLANTING4 SCALE: 1/4" = 1'
PERENNIAL & GROUNDCOVER SPACING5 SCALE: 1/4" = 1'
ROOT BALL FINISHED GRADE2 SCALE: 1/2" = 1'
BIKE RACK (REPLACE WITH SELECTED)8 SCALE: 1" = 1'
DECOMPOSED GRANITE PAVEMENT
1" = 1'-0"
DECOMPOSED GRANITE @ 3" DEPTH,
COMPACTED. SUBMIT SAMPLE TO L.A
FOR APPROVAL
SEE PLANS FOR
EDGE &
ADJACENT
CONDITION.
OPEN GRADED BASE, #57
STONE @ 6" DEPTH.
COMPACTED TO 95% DENSITY,
STANDARD PROCTOR METHOD
PROVIDE NON-WOVEN
GEOTEXTILE. MIN. FLOW RATE
135 GPM/SQFT (ASTM D 4491).
NOTES:
1.CONTRACT TO PROVIDE SAMPLE OF DECOMPOSED GRANITE MATERIAL
TO L.A. FOR APPROVAL.
2.DECOMPOSED GRANITE PAVEMENT: 4-5% WATER CONTENT WITH
ROLLER OR VIBRATORY COMPACTOR IN 2" LIFTS
3.PAVING TO BE LAID OUT IN FIELD AND APPROVED BY LANDSCAPE
ARCHITECT PRIOR TO CONSTRUCTION
VARIES
P-FS-01DECOMPOSED GRANITE PAVEMENT9 SCALE: 1" = 1'
DATE ●ISSUE
PERMIT SET
DOCUMENT REUSE:
TKLV GRFXPHQW LV WKH SURSHUW\ RI
)LHOG SWXGLR LDQGVFDSH AUFKLWHFWV
PLLC TKH LGHDV DQG GHVLJQ
LQFRUSRUDWHG RQ WKLV GRFXPHQW VKDOO
QRW EH XVHG IRU DQ\ RWKHU SURMHFW
ZLWKRXW ZULWWHQ DXWKRUL]DWLRQ RI
)LHOG SWXGLR LDQGVFDSH AUFKLWHFWV
PLLC
SHEET OF
PROJECT NUMBER:
SHEET TITLE
N R O U S E A 9 E
B O =E M A N M T
Z Z Z I L H O G V W X G L R O D F R P
MILL BUILDING RENOVATIONLOTS 5-28, BLOCK 105. BOZEMAN, MT2416.00
L-3.1
LANDSCAPE
PLAN
DETAILS
5 7
2025.02.07 SITE PL REVIEW
2025.03.17 SITE PL REV.
2025.04.09 SITE PL REV.
2