Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
001_G0.00_Cover Sheet
E Cottonwood StN Rouse AveI-90SiteNN Wallace AveRailroadNEHMUE Cottonwood StreetContruction Fencingaround Lot PerimeterN Wallace AvenueDirt Spoils AreaMaterial & Equipment Staging AreaDumpsterJobsite TrailerPortable ToiletLegendTruck/Delivery RouteMaterial & Equipment Staging AreaPerimeter Fencing40 Yard Roll-Off DumpsterLL Jobsite TrailerPortable ToiletDirt Spoils Area (To be removed upon completion of foundation backfill)PROJECT #SHEET NUMBERREVISION:DATEThis drawing is not intended nor shall it be used for construction purposes unless the signed professional stamp of a regisered architect employed at MINARIK Architecture, Inc. is affixed above.Consultant:Project Status:© 2024 MINARIK Architecture, IncALL RIGHTS RESERVEDThese Drawings are the Property of MINARIK Architecture, Inc and are not to be used or reproduced in any manner without prior written permission.2/10/2025 2:50:39 PM2403G000Mill Building RenovationBangtail Partners, LLCBozeman, Montana2/7/2025Cover SheetSite Plan ReviewMill Building RenovationCODES:SHEET INDEX:PROJECT TEAM:Owner: Bangtail Partners, LLCPO Box 2652, Dept. 35 / Menlo Park, CA 94026P: 406 539 1176Attn: Erik Nelson / erik@nest-partners.com Architect: Minarik Architecture, Inc618 N Wallace Ave / Bozeman, MT 59715P: 971.319.6249Attn: Doug Minarik / doug@minarikarch.comStructural Engineer: DCI Engineers1060 Fowler Ave, Ste 202 / Bozeman MT 59715P: 406 556 8600Attn: Jon Lovgren / jlovgren@dci-engineers.comCivil Engineer: Sanderson Stewart106 E Babcock St, Ste L1 / Bozeman MT 59715P: 406 522 9876Attn: Chris Naumann / cnaumann@sandersonstewart.comGeneral Contractor: TBDNameAddressP:Attn:Landscape Architect: Field Studio722 N Rouse Ave / Bozeman MT 59715P: 406 551 2098Attn:MEP Engineer: Energy 12042 Stadium Dr, Ste 2 / Bozeman MT 59715P: 406 587 2917Attn: Jennifer BurgettPROPERTY INFORMATION:Project Address: 615 E Cottonwood St, Bozeman, MT 59715County:GallatinLegal Address: Northern Pacific Addition, S06, T02 S, R06 E, Block 105, Lot C1Zone: NEHMU, NE Historical Mixed-Use DistrictProperty / Lot Area:23,000 sf | 0.528 acFAR : NA (38.320.050)Building Footprint: 3,689 sfLot Coverage: 100% Allowed-16% ActualBlock Frontage: Mixed Use Building Height:Max Allowed Building Height: 50'-0" Proposed Building Height: 24'-11"Building Areas:Existing:2,180 sfAddition:1,509 sfTotal Building Area: 3,689 sfGENERAL NOTES:1. This set of drawings is published in conjunction with an in line specification without which the Contract Documents are Incomplete.2. Contractor must comply with the rules and regulations of the agencies having jurisdiction and shall conform to all city, county, state and federal construction safety and sanitary laws, codes statutes and ordinances. All fees, taxes, permits, applications and certificates of inspection, and the filing of all work with governmental agencies shall be the responsibility of the contractor.3. All work shall be performed by skilled and qualified workmen in accordance with the best practices of the trades involved, and in compliance with building regulations and/or governmental laws, statutes or ordinances concerning the use of union labor.4. Each trade will proceed in a fashion that will not delay the trades following them.5. All work shall be erected and installed plumb, level, square, true, and in proper alignment.6. All work and materials shall be guaranteed against all defects for a period of at least one (1) year from approval of final payment.7. Do not scale the drawings. Written dimensions take precedence over scaled dimensions. Dimensions are to face of framing, face of concrete, gridline, or centerline of object, unless otherwise noted.8. Detailed drawings and larger scale drawings take precedence over smaller scale drawings.9. The Architect shall neither have control over or charge of, nor be responsible for, the construction means, methods, techniques, sequences or procedures, or for safety precautions and programs in connection with the work, since these are solely the Contractor's rights and responsibilities under the Contract Documents.10. The stability of the structure is dependent on the completed condition. The design, adequacy, and safety of erection bracing, shoring, temporary supports, etc, is the sole responsibility of the contractor and has not been considered by the architect/ designer. The contractor is responsible for the stability of the structure prior to the completion of all shear walls, roof and floor diaphragms and finish materials.PROJECT DESCRIPTION:Cottonwood and Ida: A renovation to the existing 'Mill Building' into exhibition space and additional support space that adds a small secondary exhibition room, entry, storage and restrooms. Project will include a 2,223 square foot addition and a 2,180 square foot renovation of the existing Mill Building. Total conditioned space is 4,403 square feet.11. Overall site plan based on spot elevations and non-comprehensive site survey by others. Actual site conditions may differ from conditions shown in these documents. Contractor shall verify and confirm existing conditions shown or implied on the drawings prior to the start of construction or ordering materials. Notify architect/ designer of any discrepancies.Contractor and subcontractor shall become familiar with the site, existing conditions, and these drawings prior to commencing work.12. Contractor and subcontractor shall become familiar with the site, existing conditions, and these drawings prior to commencing work.13. Scope of work shall include work indicated and implied by these drawings.14. All construction debris to be removed off-site. All debris is to be disposed of in a legal manner at a landfill or recycling facility. No debris shall be disposed of in local waste collection facilities.15. Contractor to locate exact locations of utilities.16. Install all materials per manufacturer recommendations.17. All sheet metal work shall conform to current SMACNA (Sheet Metal and Air Conditioning Contractors' National Assoc., Inc.) Standards.18. Submit paint drawdowns, cabinetry shop drawings, and all other related finishes for designer approval.19. Submit locations of fire strobes and thermostat locations for Designer approval prior to construction to avoid conflict with furnishings.A3.00 ElevationsG000 Cover SheetG010 Project and Code SummaryG011 Code PlansC1.1 Legends, Notes, and AbbreviationsC2.1 Existing Topography & Demolition PlanC3.1 Overall Site LayoutC3.2 Site PlanC4.1 Utility PlanC5.1 Grading PlanC6.1 Stormwater PlanC7.1 DetailsC7.2 DetailsC7.3 DetailsL0.1 General Materials & Layout NotesL0.2 Planting NotesL1.1 Overall Landscape Materials PlanL2.1 Overall Planting PlanL3.1 Landscape Plan DetailsA100 Architectural Site PlanA101 Floor PlansA105 Roof PlanJurisdictional Authority: City of Bozeman (Gallatin County, State of Montana)Applicable Codes:Administration Rules of Montana (ARM) Rule 24.301.2022021 International Building Code (IBC)ARM Rule 24.301.1462021 International Existing Building Code (IEBC)ARM Rule 24.301.1712021 International Energy Conservation Code (IECC)ARM Rule 24.301.1612021 International Mechanical Code (IMC)ARM Rule 24.301.1722020 National Electrical Code (NEC)ARM Rule 24.301.4012021 Uniform Plumbing Code (UPC) (IAPMO)ARM Rule 24.301.3012021 International Fuel Gas Code (IFGC)ARM Rule 24.301.1732021 International Fire CodeARM Rule 23.12.601Admin Order 2023-04 Adoption of 2021 Fire CodeICC A117.1-2017 Standard for Accessible and Usable Buildings and FacilitiesARM Subchapter 24.301.91Vicinity MapSUBMITTAL DOCUMENTS:Deferred Submittals:Separate Permits:E0.0 Electrical Cover SheetE0.1 Electrical SpecificationsE0.2 Electrical Site PlanE0.3 E-Photometric Site PlanE1.0 Elec - Level 1 - Power PlanE1.1 Elec - Loft Area - Power PlanE1.2 Elec - Roof Plan - PowerE2.0 Elec - One Line DiagramE2.1 Elec - PV One Line DiagramE3.0 Electrical DetailsE4.0 Electrical SchedulesParking Requirements (See Site Plan Submittal Documentation)Motor VehicleUse Type Required Total Req. Provided*Community/Rec 1 / 200sf floor area 11 -Bicycle Vehicle*Min 10% of vehicle 1 total 2 providedLot C1Total Demand 11 required 11 providedREVISION DATE REASON FOR ISSUE1" = 40'-0"2Construction Management Plan*A Site Modification will be submitted on the adjacent Lot A1 to show available parking spaces